Onboarding plan 30 60 90

Skill KirKruglov/claude-skills-kit/skills/hiring-and-hr/onboarding-plan-30-60-90

Generate a 30-60-90 day onboarding plan from the manager's perspective — goals, key contacts, milestones, success metrics per phase. Use when onboarding a new hire without HR support. Triggers: 'create 30-60-90 day plan', 'onboarding plan', 'план адаптации 30-60-90', 'план онбординга'.From its SKILL.md

Install
npx -y skills add KirKruglov/claude-skills-kit --skill onboarding-plan-30-60-90

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 18 stars18 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

7.8 KB, ~1.8k tokens by cl100k_base, as published. Nobody here has run it

Onboarding Plan 30-60-90

Generates a structured 30-60-90 day onboarding plan for a new hire from the manager's perspective. Takes role details and 3–5 key priorities as input; outputs a phased markdown document with goals, key contacts, learning milestones, and a success metric per phase — ready to share with the new hire or save in a project folder.

Input:

  • New hire role title and level (required)
  • 3–5 role priorities or must-learn areas (required)
  • Team context: team size, reporting line, key collaborators (optional)
  • Start date and work format — Remote / Hybrid / Onsite (optional)

Output:

  • Markdown onboarding plan with three phase sections (30 / 60 / 90 days)

Language Detection

Detect the user's language from their message:

  • If Russian (or contains Cyrillic): respond in Russian
  • If English (or other Latin-script language): respond in English
  • If ambiguous: respond in the language of the trigger phrase used

Instructions

Step 1: Validate Input

  1. Check that at least a role title is provided.

    • If input is empty or only whitespace, or contains no identifiable role title: stop and respond (bilingual): "Укажи должность и 3–5 ключевых приоритетов роли. / Provide the role title and 3–5 key priorities for the role."
    • If role title is present but priorities are missing: proceed; use generic role-appropriate milestones and add a note at the top of the plan: "Add role-specific priorities to tailor the learning milestones per phase."
  2. Detect scope mismatch:

    • If user asks for an IT/HR checklist (equipment provisioning, system access, HR paperwork): respond: "Этот скилл создаёт план адаптации для руководителя, а не чеклист для HR или IT. / This skill generates a manager-facing onboarding plan, not an IT or HR setup checklist."
    • If user provides details for multiple hires at once: generate plan for the first hire only; note: "Сгенерировал план для первого сотрудника. Повтори запрос с данными следующего. / Generated plan for the first hire. Repeat with the next hire's details."

Step 2: Extract and Structure Inputs

  1. Parse the following fields from the user's input:

    • Role title — e.g., "Product Manager", "Senior Developer"
    • Level — Junior / Middle / Senior / Lead / Director / VP / C-level
    • New hire name — optional; use "New Hire" as placeholder if not given
    • Start date — optional
    • Work format — Remote / Hybrid / Onsite; default to "Hybrid" if not specified
    • Team context — team size, reporting line, key collaborators (optional)
    • Role priorities — extract 3–5 must-learn areas from user's notes
  2. Flag if level is Senior / Director / VP / C-level → apply leadership adjustment in Step 3.

Step 3: Generate the Three-Phase Plan

For each phase, produce four sub-sections: Goals, Key Contacts, Learning Milestones, Success Metric. Use the role priorities from Step 2 to populate learning milestones — not generic filler.

Phase 1 — First 30 Days: Orient

  • Goals: 2 learning goals (understand team structure and core tools; map key stakeholders) + 1 performance goal (small, visible output)
  • Key Contacts: 4–6 contacts with role, purpose of meeting, and timing (Week 1 through Week 4)
  • Learning Milestones: 4–6 checkboxes drawn directly from role priorities
  • Success Metric: 1 concrete, measurable indicator of phase completion

Phase 2 — Days 31–60: Contribute

  • Goals: 2 learning goals (deeper domain knowledge; understand cross-team dependencies) + 1 performance goal (own a deliverable or recurring process independently)
  • Key Contacts: 2–3 additional contacts (extended team, skip-level, external partners)
  • Learning Milestones: 3–4 checkboxes (deeper skills from priorities)
  • Success Metric: 1 concrete, measurable indicator

Phase 3 — Days 61–90: Own

  • Goals: 1 learning goal (strategic context, full role scope) + 2 performance goals (own end-to-end delivery; propose 1 improvement)
  • Key Contacts: 1–2 contacts (leadership, external stakeholders, peers from adjacent teams)
  • Learning Milestones: 2–3 checkboxes (strategic or advanced skills)
  • Success Metric: 1 concrete, measurable indicator

Leadership adjustment (Senior / Director / VP / C-level):

  • Phase 1 goals: emphasize org-political mapping and stakeholder alignment, not just tool learning
  • Phase 2 goals: include quick-win identification and first visible leadership contribution
  • Phase 3 goals: include team strategy, OKR ownership, or hiring decisions

Remote adjustment (work format = Remote):

  • Replace in-person contact suggestions with async-first equivalents (Slack intros, async onboarding docs, virtual coffee chats)
  • Flag remote-specific tools in milestones (async comms tools, documentation standards)

Step 4: Format and Output

  1. Output the complete plan using the structure defined in the Output Format section below.
  2. Use the detected language for all section headers:
    • EN: Phase 1 — First 30 Days: Orient / Phase 2 — Days 31–60: Contribute / Phase 3 — Days 61–90: Own
    • RU: Фаза 1 — Первые 30 дней: Ориентация / Фаза 2 — Дни 31–60: Вклад / Фаза 3 — Дни 61–90: Владение
  3. Output the plan directly — no meta-commentary or explanation between sections.

Output Format

Single markdown document with a title block and three phase sections:

# Onboarding Plan: [Role Title] — [Name or "New Hire"]

**Start Date:** [date or TBD]
**Work Format:** [Remote / Hybrid / Onsite]

---

## Phase 1 — First 30 Days: Orient

**Goals:**
- [Learning goal 1]
- [Learning goal 2]
- Performance goal: [small, visible output by day 30]

**Key Contacts:**
| Name / Role | Purpose | When |
|-------------|---------|------|
| [Direct Manager] | Clarify expectations and success criteria | Week 1 |
| [Teammate 1] | Understand team workflows and day-to-day | Week 1–2 |
| [Cross-func Partner] | Map dependencies | Week 2–3 |
| [Senior Stakeholder] | Understand business context | Week 3–4 |

**Learning Milestones:**
- [ ] [Tool or process from role priorities]
- [ ] [Domain knowledge area 1]
- [ ] [Domain knowledge area 2]
- [ ] [Domain knowledge area 3]

**Success Metric:** [Concrete, measurable indicator of phase completion]

---

## Phase 2 — Days 31–60: Contribute

[same structure as Phase 1]

---

## Phase 3 — Days 61–90: Own

[same structure as Phase 1]

English uses English section headers throughout. Russian uses Russian headers (Фаза 1 — Первые 30 дней: Ориентация, Фаза 2 — Дни 31–60: Вклад, Фаза 3 — Дни 61–90: Владение).


Negative Cases

  • Empty input, only whitespace, or no role title detected: Respond (bilingual): "Укажи должность и 3–5 ключевых приоритетов роли. / Provide the role title and 3–5 key priorities for the role."
  • Role title present but priorities missing: Proceed with generic role-appropriate milestones; add a note at the top of the plan: "Add role-specific priorities to tailor the learning milestones per phase."
  • IT/HR checklist request: Clarify that this skill generates a manager-facing onboarding plan, not an IT setup or HR paperwork checklist.
  • Multiple hires at once: Generate plan for the first hire only; prompt user to repeat for the next hire.