Knowledge base from the GAO Cost Estimating and Assessment Guide (GAO-20-195G). Use for program cost estimating: the four characteristics of a reliable estimate (comprehensive, well documented, accurate, credible) and the 18 best practices; the 12-step cost estimating process (purpose, plan, technical baseline, WBS, ground rules and assumptions, data, point estimate, sensitivity, risk/uncertainty, document, present, update); estimating methods (analogy, parametric, engineering build-up, learning curves); Monte Carlo risk/uncertainty analysis, confidence levels and contingency; auditing and validating an estimate against the characteristics; earned value management (EIA-748, BCWS/BCWP/ACWP, CPI/SPI/TCPI, EAC, PMB, IBR); and specialized techniques (software cost estimating, learning curves, Analysis of Alternatives, WBS templates, the Green Book internal-control framework). This is the cost-estimating companion to the GAO Schedule and Technology Readiness Assessment guides. Does not cover schedule estimating/risk in depth (see the GAO Schedule Assessment Guide), agency-specific cost models, or the full text of referenced standards (EIA-748, MIL-STD-881D, the Green Book) — these are named, not reproduced.From its SKILL.md

Install
npx -y skills add jgsystemsconsulting/jgs-se-knowledge-packs --skill gao-cost

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

2 things to look at

  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
  • 2 stars2 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

16.1 KB, ~3.7k tokens by cl100k_base, as published. Nobody here has run it

<!-- argument-hint: [characteristic, 12-step process step, estimating method, risk/uncertainty, EVM term, audit, software/learning-curve/AOA, chapter number] -->

GAO Cost Estimating and Assessment Guide (GAO-20-195G)

Source: GAO (US Government work, public domain) | Chapters: 8

When to use

Use this skill to develop, manage, or evaluate a program cost estimate: framing the estimate's purpose and scope, structuring it with a WBS, choosing estimating methods, turning a point estimate into a risk-adjusted budget, documenting and updating it, auditing it against GAO's reliability criteria, and connecting it to earned value management for execution. This is the cost-estimating companion to the GAO gao-schedule and gao-tra guides and the management-side counterpart to a program's life cycle cost estimate.

Prerequisites: none — plain Markdown; no MCP server, API key, or licence tier needed at runtime.

How to Use This Skill

  • Without arguments — load the core frameworks below: the four characteristics + 18 best practices, the 12-step process, the estimating methods, risk/uncertainty, EVM, and the specialized techniques.
  • With a topic — ask about a characteristic ("credible"), a step ("ground rules and assumptions", "point estimate"), a method ("parametric", "learning curve"), a risk concept ("Monte Carlo", "confidence level", "contingency"), or an EVM term ("CPI", "EAC", "performance measurement baseline").
  • With a chapterch02/ch03/ch05 (the 12 steps), ch04 (risk/uncertainty), ch06 (auditing), ch07 (EVM), ch08 (specialized techniques).

Supporting files: glossary.md, patterns.md, cheatsheet.md.

One discipline, two uses. The Guide is both an authoring standard (how to build a reliable estimate) and an audit standard (how to grade one). The same four characteristics and 18 best practices serve both. EVM (ch07) is the execution-side bridge: the estimate says what a program could cost; EVM measures whether it is delivering against a baseline built from that estimate.

Core Frameworks & Mental Models

What a cost estimate is — and why reliability is a process, not luck

A cost estimate is the sum of individual cost elements, built from established methods and valid data, projecting what a program will cost in the future given what is known now. It is not a one-time deliverable — managing it means revising it as actuals arrive, adjusting it when the program changes, and analyzing the gaps. The Guide's central claim: reliability is the predictable output of a disciplined, repeatable process, not seniority or luck. A reliable estimate matters structurally for government — every dollar committed to one program is denied to another, so an unrealistic estimate can ripple cuts across a whole portfolio.

The Four Characteristics of a Reliable Cost Estimate

GAO's research identifies four characteristics that a reliable estimate exhibits. They are the assessment yardstick auditors apply, and the design targets an estimator engineers toward:

CharacteristicWhat it demands
Comprehensivefull life cycle + complete scope (a complete WBS); all GR&As documented; nothing omitted or double-counted
Well documentedsources, methods, and calculations captured so an unfamiliar analyst could rebuild it; traced to source data
Accurateunbiased (not optimistic or conservative); most-likely-cost basis; inflation-adjusted; reconciled to actuals
Crediblelimitations exposed via sensitivity and risk/uncertainty analysis; major drivers cross-checked; reconciled to an independent cost estimate (ICE)

The 18 best practices are the actionable steps that produce these characteristics; each best practice maps to one characteristic. An estimate that fully reflects all four is deemed reliable.

The 12-Step Cost Estimating Process

The procedural backbone, grouped into four phases:

  • Plan & define (Steps 1-4): (1) define the estimate's purpose — intended use fixes scope and detail; (2) develop the estimating plan — team, study plan, schedule; (3) define the program via a cost-free technical baseline description; (4) determine the estimating structure — the work breakdown structure (WBS), the product-oriented decomposition that ties cost, schedule, EVM, and risk together.
  • Build the number (Steps 5-7): (5) identify ground rules and assumptions (global + element-specific); (6) obtain the data — collect, validate, normalize (the most difficult, time-consuming step; data quality is the biggest lever); (7) develop the point estimate — select a method per WBS element, build the model, time-phase, sum, and cross-check against an ICE.
  • Quantify confidence (Steps 8-9): (8) sensitivity analysis (vary one input at a time); (9) risk and uncertainty analysis (vary many inputs together via simulation → probability distribution + confidence level).
  • Finalize & sustain (Steps 10-12): (10) document the estimate; (11) present it to management for formal approval (not finished until approved); (12) update it against actuals and program changes over the life cycle.

Each step's chapter closes with a "Survey of Step" — Process Tasks, Best Practices, and Likely Effects if criteria are not fully met — which is what makes each step auditable.

Estimating Methods

Choose by program maturity and available data; the method can differ per WBS element:

MethodUse whenTrade-off
Analogyearly; a close similar system existsfast, low data; weak without a good analog
Parametricdrivers + cost history, design still vaguerepeatable via cost estimating relationships (CERs); needs valid data range
Engineering build-upmature designmost accurate; slow and data-hungry

Supplemented by expert opinion, extrapolation from actuals (averages, EACs), and learning curves (Y = AX^b) for recurring production.

Risk and Uncertainty → a risk-adjusted budget

A point estimate alone carries no confidence information and tends to under-fund. Sensitivity analysis isolates one input at a time (ranked on a tornado chart) to find what the estimate is most responsive to. Risk and uncertainty analysis lets inputs vary together — via the three-point method (min/most-likely/max) and/or the risk-driver method (probability × cost effect, from the risk register) — driven by Monte Carlo simulation, producing a total-cost probability distribution. Reading the cumulative distribution (S curve) gives a defensible confidence level; contingency is sized as the gap between the point estimate and that level.

Earned Value Management (EVM) — measuring execution

Spending data alone misleads (the railroad example: looks under-budget while badly behind). EVM adds the missing third number — the value of work performed. Three measures: BCWS (planned value), BCWP (earned value), ACWP (actual cost). Derived indexes: CPI = BCWP/ACWP (cost), SPI = BCWP/BCWS (schedule), TCPI (efficiency needed on remaining work). The EAC forecasts total cost from cumulative CPI. The estimate is converted into a time-phased performance measurement baseline (PMB); an integrated baseline review (IBR) confirms it is executable — the crucial link between cost estimating and EVM. EVM systems are validated against EIA-748's 32 guidelines. OMB requires EVM for major acquisitions with development effort.

Specialized Techniques & Internal Control

Beyond the 12 steps: software cost estimating (size first via SLOC/function points/COSMIC, convert to effort; classify code new/reused/adapted/auto-generated); learning curves (unit vs. cumulative-average theory; Anderlohr/retrograde for production breaks); Analysis of Alternatives (AOA) (22 best practices in 5 phases; NPV where benefits monetize); WBS templates (MIL-STD-881D, NASA/DOE/PMI handbooks); and the Green Book (GAO-14-704G) internal-control framework (5 components, 17 principles) — because the cost estimating process is itself an internal control.


Chapter Index

#SectionKey content
ch01Fundamentals & the four characteristicsWhat a cost estimate is; reliability as process; the four characteristics; 18 best practices; 12-step process; LCCE; why government needs reliable estimates
ch02Steps 1-4: Planning & program definitionPurpose & scope; estimating plan/team; technical baseline description; the work breakdown structure (WBS)
ch03Steps 5-7: Ground rules, data, point estimateGlobal vs. element-specific GR&As; data collection/validation/normalization; estimating methods (analogy/parametric/build-up); cross-checks and the ICE
ch04Steps 8-9: Sensitivity, risk & uncertaintySensitivity (one-at-a-time, tornado chart); three-point & risk-driver methods; Monte Carlo; S curve, confidence level, contingency
ch05Steps 10-12: Document, present, updateDocumentation template & rationale; management approval; updating against actuals and program changes
ch06Auditing & validatingThe characteristics/best practices as gradable criteria; mapping practices to characteristics; assessing agency guidance against the 12 steps; audit criteria & data collection
ch07Earned value managementEIA-748 (32 guidelines); 13 EVM activities; PMB/IBR/CPR; BCWS/BCWP/ACWP; CPI/SPI/TCPI; EAC; OTB/OTS; EVM system acceptance
ch08Specialized techniques & internal controlSoftware cost estimating; learning curves (Anderlohr/retrograde); WBS templates; TRLs; AOA (22 practices); the Green Book (5 components, 17 principles)

Topic Index

  • 18 best practices → ch01, ch06, cheatsheet
  • Accurate (characteristic) → ch01, ch06
  • Analogy method → ch03, cheatsheet
  • Analysis of Alternatives (AOA) → ch08, ch01
  • Anderlohr / retrograde (production break) → ch08
  • Audit / validation of an estimate → ch06, patterns
  • CPI / SPI / TCPI (performance indexes) → ch07, cheatsheet
  • Comprehensive (characteristic) → ch01, ch06
  • Confidence level / S curve → ch04, cheatsheet
  • Contingency / management reserve → ch04, ch07
  • Cost estimating relationship (CER) → ch03, ch04
  • Credible (characteristic) → ch01, ch06
  • Data collection / validation / normalization → ch03
  • Documentation (Step 10) → ch05, patterns
  • Earned value management (EVM) → ch07, ch01, cheatsheet
  • EIA-748 / 32 guidelines → ch07
  • Engineering build-up method → ch03, cheatsheet
  • Estimate at completion (EAC) → ch07
  • Four characteristics (reliable estimate) → ch01, ch06, cheatsheet
  • Green Book / internal control → ch08
  • Ground rules & assumptions (GR&A) → ch03
  • Independent cost estimate (ICE) → ch03, ch05
  • Integrated baseline review (IBR) → ch07, ch08
  • Learning curve (Y = AX^b) → ch08, ch03
  • Life cycle cost estimate (LCCE) → ch01, ch02
  • Monte Carlo simulation → ch04
  • Parametric method → ch03, cheatsheet
  • Performance measurement baseline (PMB) → ch07
  • Point estimate (Step 7) → ch03
  • Present / management approval (Step 11) → ch05
  • Risk & uncertainty analysis (Step 9) → ch04, cheatsheet
  • Risk driver / risk register → ch04
  • Sensitivity analysis (Step 8) → ch04, cheatsheet
  • Software cost estimating → ch08
  • Technical baseline description (Step 3) → ch02
  • Technology readiness level (TRL) → ch08
  • Three-point estimate → ch04
  • Tornado chart → ch04
  • 12-step process → ch02, ch03, ch04, ch05, cheatsheet
  • Update the estimate (Step 12) → ch05
  • Well documented (characteristic) → ch01, ch05, ch06
  • Work breakdown structure (WBS) → ch02, ch08
  • WBS templates (MIL-STD-881D, NASA/DOE/PMI) → ch08

Supporting Files

  • glossary.md — key cost-estimating, risk, and EVM terms, alphabetical, with chapter references
  • patterns.md — reusable patterns (run the 12 steps; engineer toward the four characteristics; pick a method by maturity; convert the point estimate to a risk-adjusted budget; document/update; audit; pair with EVM; specialized techniques) with When/How/Trade-offs
  • cheatsheet.md — the 12 steps, four-characteristics table, method-selection table, risk toolkit, EVM index reference, and tells & smells

Scope & Limits

Covers: program cost estimating per the GAO Cost Estimating and Assessment Guide (GAO-20-195G, March 2020) — the four characteristics of a reliable estimate and the 18 best practices; the full 12-step cost estimating process; estimating methods (analogy, parametric, engineering build-up, learning curves); sensitivity, risk, and uncertainty analysis (Monte Carlo, confidence levels, contingency); documenting, presenting, and updating; auditing/validating an estimate against the characteristics; earned value management (EIA-748, the EVM measures and indexes, PMB, IBR, EAC forecasting, system acceptance); and specialized techniques (software cost estimating, Analysis of Alternatives, WBS templates, technology readiness levels, the Green Book internal-control framework).

Thin on / does not cover in depth: schedule estimating and schedule risk analysis — the Guide deliberately hands these to the GAO Schedule Assessment Guide (GAO-16-89G; see gao-schedule), and technology-maturity assessment to the Technology Readiness Assessment Guide (GAO-20-48G; see gao-tra). It does not reproduce the full text of referenced standards and frameworks — EIA-748, MIL-STD-881D, the Green Book (GAO-14-704G), ICEAA/AACEI/PMI standards — these are named and summarized, not copied. Embedded source figures and tables (discipline maps, WBS diagrams, worked method tables, EVM exhibits) are described/paraphrased here, not reproduced; redraw from the originals if a rendered exhibit is needed. The Guide is GAO best-practice guidance, oriented to US federal acquisitions and DoD/NASA examples; it is not a regulation, though several statutes (Weapon Systems Acquisition Reform Act, Nunn-McCurdy, FASA, Clinger-Cohen, the FAR/DFARS EVM provisions) make parts of it effectively mandatory for major acquisitions.

Jurisdiction: US Government public domain work. The guidance is voluntary best practice but is broadly adopted and partly mandated for federal major acquisitions; it is adaptable to non-federal programs.

What ships with it: 13 files

188.6 KB alongside SKILL.md