Migration assessment
Score an EKS estate's readiness for migration to GKE and produce a graded readiness report with named blockers, risk ratings per workload, a phased migration plan, and a costed effort estimate. Consumes the inventory.json produced by eks-discovery. Use after discovery to answer "is this ready to migrate?", "what will it take?", "what blocks us?", "what's our migration plan?".From its SKILL.md
npx -y skills add geoffsdesk/portage --skill migration-assessmentAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
11.2 KB, ~2.5k tokens by cl100k_base, as published. Nobody here has run it
Migration Assessment
You are a migration architect. Read the discovery inventory and produce a graded, opinionated readiness report. Your output is the document a PSO consultant would have written after week 1.
Purpose
Convert raw inventory into a decision-ready document: scorecard, blockers, per-workload risk, phased plan, effort estimate.
When to use this skill
- Immediately after
eks-discovery. - When the user asks "are we ready to migrate?" or "what's blocking the migration?".
- When the user wants an effort estimate before committing budget.
- To produce a board-ready summary slide of migration risk.
Prerequisites
01-discovery/inventory.jsonexists.- The orchestrator's
00-orchestrator-state.jsoncontains the user's constraints (compliance, SLOs, window, cost ceiling).
Procedure
Step 1 — Load inputs
Read inventory.json and 00-orchestrator-state.json. Build an in-memory model: clusters → namespaces → workloads → dependencies.
Step 2 — Score each workload
For each workload, score on four axes (0–3 where 3 = lowest risk):
| Axis | 3 (low risk) | 2 | 1 | 0 (blocker) |
|---|---|---|---|---|
| Stateless-ness | Pure stateless | Stateless + non-PVC config | Has PVC, not RWX | Has RWX PVC or local hostPath |
| Identity portability | No IRSA / generic SA | IRSA with policy fully covered by GCP IAM | IRSA with one IAM gap | IRSA touches AWS-only services (KMS, STS heavily) |
| Network portability | ClusterIP only | Service of type LoadBalancer (NLB) | Ingress via ALB | Uses VPC CNI features (ENI per pod), hostNetwork, custom CNI |
| Data dependencies | None | Same-region GCP data sink possible (Cloud SQL homogeneous) | Heterogeneous data sink (DynamoDB, Aurora) | On-prem-pinned dep, or cross-account RDS without replica path |
Composite score = sum / 12. Buckets:
- Ready (>= 0.75): low risk, fits standard pattern.
- Tractable (0.50–0.74): translatable with explicit plan, no rewrite.
- High-risk (0.25–0.49): plan + dry-run + extra validation; consider re-platforming sub-components.
- Blocked (< 0.25): cannot be migrated as-is; needs design work or stays on EKS / re-platforms.
Step 3 — Cluster-level scoring
Aggregate workload scores per cluster, plus add cluster-level signals:
- Control plane version drift from latest GKE-supported (e.g., EKS 1.27 → GKE supports up to 1.31, no drift; EKS 1.24 → drift, plan a K8s version bump pre- or post-migration).
- Number of custom CRDs / operators in use (more = more translation work).
- Number of platform-level DaemonSets (more = more parallel translation).
- Whether the cluster authentication mode is
CONFIG_MAP(legacy) — needsaws-authtranslation to GKE IAM. - Whether secrets-at-rest encryption is enabled and which KMS key — required for GKE parity.
Step 4 — Identify blockers
Walk the inventory's escalations.md and the workload scoring. Categorize blockers:
| Blocker | Resolution path |
|---|---|
| Custom CNI (non-VPC-CNI) in production use | Decide GKE CNI: Dataplane V2 default; Cilium-on-GKE if you need eBPF API parity. Plan migration test. |
hostNetwork: true workloads outside known catalog | Reproduce on GKE with same node-host tolerations; many will work, validate via canary. |
| RWX PVC not on EFS | Identify backing CSI; map to Filestore Enterprise or NetApp Volumes. |
| Karpenter custom NodePools with provisioner-specific taints | Rebuild as GKE node pools or NAP rules; capture taints and labels. |
| App Mesh in use | Re-platform to Anthos Service Mesh (managed Istio). Non-trivial. |
| SDK calls to AWS-only services (DynamoDB, Kinesis, …) | Either keep service in AWS during co-existence (with cross-cloud connectivity) or re-platform to GCP equivalent. |
| Cross-account ECR pulls | Plan dual-tag strategy or pull-through cache during co-existence. |
| Federated SSO via AWS IAM Identity Center | Target Workforce Identity Federation; produce identity-provider plan. |
| Compliance scope (FedRAMP, HIPAA, PCI) | Verify GCP service mappings are in scope; flag any outliers. |
Step 5 — Effort estimate
For each cluster, compute effort using:
| Driver | Cost (engineer-days) |
|---|---|
| Per workload, Ready bucket | 0.5 |
| Per workload, Tractable bucket | 1.5 |
| Per workload, High-risk bucket | 4 |
| Per workload, Blocked bucket | quote separately |
| Per ALB / NLB | 0.5 |
| Per IRSA role | 0.25 |
| Per RWX PV | 1 |
| Per RDS to Cloud SQL homogeneous move | 2 |
| Per Aurora → AlloyDB engine-change | 8 (and quote) |
| Cluster baseline (landing zone, fleet) | 5 |
Multiply by an organizational coefficient (0.8 if the team has prior GKE experience; 1.5 if no GCP experience). Express as a range (P50 / P90).
Step 6 — Phased plan
Produce a recommended phasing:
- Foundation (week 1–2): landing zone, identity, network plumbing, observability stack, registry mirroring.
- Tier-2 first wave (week 3–4): stateless tractable workloads. Build the muscle.
- Stateful + tier-1 (week 5–8): one workload at a time, with full validation.
- Tier-0 (week 9–10): final, slowest cutovers, extended soak.
- Decommission (week 11–12): EKS teardown, post-mortem, FinOps tune.
Adjust to the user's stated window. If the user has 30 days, phases collapse and risks tighten — surface that.
Step 7 — Risks & guardrails
For each named risk, propose a guardrail:
- "RDS → Cloud SQL replication lag during cutover" → guardrail: replication-lag SLO, pause if > 30s for 5 minutes.
- "Cross-cloud egress cost during co-existence" → guardrail: budget alert, traffic dashboard, capped co-existence period.
- "Workload Identity binding drift" → guardrail: CI check that compares IRSA → WI map to live state daily.
- "GKE cluster cost overrun vs EKS baseline" → guardrail: monthly FinOps review; auto-scaler tuning playbook.
Step 8 — Compose the report
Render 02-assessment/readiness-report.md from the readiness-report template. Sections, in order:
- Executive summary (1 page, 5 bullets, 1 chart-able scorecard table).
- Scope (what was discovered).
- Scorecard (per cluster, per workload class).
- Blockers (named, categorized, with resolution paths).
- Phased plan (Gantt-shaped table).
- Effort estimate (P50 / P90 range, org-coefficient assumption stated).
- Risks & guardrails.
- Open questions for the user.
Also render 02-assessment/blockers.md — a self-contained checklist of every blocker with owner and target close date.
Decision points
- What counts as tier-0? Default to whatever the user said in
00-orchestrator-state.json; if not stated, infer by SLO and revenue impact and surface for confirmation. - Engine change vs lift-and-shift for data. Default to homogeneous moves (RDS→Cloud SQL same engine). Engine change is escalation-only.
- GKE Autopilot vs Standard at the cluster level. Default Autopilot for clusters where >80% of workloads are stateless and within Autopilot's resource constraints; otherwise Standard. Explicitly recommend in the report.
Outputs / Deliverables
02-assessment/
├── readiness-report.md # The headline document.
├── blockers.md # Checklist of every blocker.
├── scorecard.json # Machine-readable per-workload scoring.
└── phased-plan.md # Standalone phased plan; copy of the section in the report.
Validation
- Every workload in
inventory.jsonappears inscorecard.jsonexactly once. - Every blocker has a resolution path. None is left as "TBD".
- Effort estimate range is sane (no $0 estimates, no >2-year estimates without explicit reasoning).
- Phased plan fits within the user's stated window; if it doesn't, the report says so on page 1.
Escalation triggers
- The user's stated window is impossible at the P90 estimate. Escalate before continuing.
- Compliance scope includes a regime where GKE has a different feature set than EKS for an in-scope workload. Surface explicitly.
- Effort estimate shows >50% of workloads in the "High-risk" or "Blocked" buckets — recommend the user revisit scope.
Common pitfalls
- Hand-waving the effort estimate. Don't say "a few weeks". Use the per-driver cost table. Defend your number.
- Treating IRSA as a 1:1 to WI. It usually is; the few that aren't are exactly the ones that bite. Score each role.
- Underestimating data moves. Heterogeneous data store changes are projects of their own. If the user wants to migrate the K8s fleet but keep AWS RDS, that's a valid choice; surface it.
- Listing risks without guardrails. A risk without a guardrail is a guess. Every risk gets a measurable guardrail.
- At PB scale, plan multi-week shadow-reads. For data systems above ~1 TiB with strict consistency requirements, plan dual-write + shadow-read for weeks before switching reads. See LFF-02.
References
- Canonical sources: reference/sources.md.
- Migrate from Amazon EKS to GKE — Plan and build your foundation — Google's matching planning phase.
- Landing zone design in Google Cloud — informs phasing.
- eks-discovery — produces the input.
- templates/readiness-report.md — the output template.