Business process mapper

Skill findscripter/everything-skills/07-productivity/business-process-mapper

类书式 AI Agent 技能大典 · 精选/中文化/互见成网的 500+ 开源技能,可作为 Claude Code 插件市场一键安装。A curated, cross-referenced encyclopedia of 500+ open-source agent skills.

Install
npx -y skills add findscripter/everything-skills --skill business-process-mapper

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

2 things to look at

  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

当需要把采购/入职/事故交接/客户开通等内部业务流程文档化、按阶段量化周期时间并定位瓶颈时使用;产出泳道流程图、周期分析(P50/P90、增值比、Little 定律吞吐)与按严重度排序的瓶颈清单(含根因假设与单点改进建议);不适用于销售漏斗、系统 SLO 可靠性或一次性项目管理。触发词:业务流程图、流程梳理、瓶颈分析、周期时间、value stream、BPMN、cycle time、bottleneck

The file declares its own license as MIT. That is the author’s claim about this one file, and it is not the same thing as the license GitHub reports for the repository, which is listed with the other numbers below.

SKILL.md

7.3 KB, ~2.3k tokens by cl100k_base, as published. Nobody here has run it

何时使用

当一名运营负责人(BizOps/COO/流程改进 Owner)需要做以下事情时使用本技能:

  • 把一条可重复的内部业务流程(采购申请、供应商/员工入职、事故交接、报销、客户开通、理赔审核等)用 BPMN 风格的泳道图文档化。
  • 已知流程"太慢"但说不清瓶颈在哪一阶段。
  • 已在测周期时间,却没测增值比(VA%),判断不出流程是健康还是充满浪费。
  • 跨职能交接频繁掉单、根因不明。

核心洞察:办公流程的总耗时里,绝大部分是排队/等待/审批时间,而非真正在做事。瓶颈用确定性规则点名,不靠 LLM 直觉。

不该用的边界(务必先判断再决定是否调用):

  • 销售漏斗、线索转化、客户成功留存等对外增长动作 —— 本技能只管内部运营流程。
  • 系统可靠性 SLO / 错误预算 / 燃尽告警 —— 那是系统正常运行时间,不是业务流程周期时间。
  • 战略层面"该先修哪条流程"的优先级决策 —— 本技能是优先级定下来之后的战术执行工具。
  • 一次性项目,或 Jira/Confluence 工单跟踪 —— 本技能做流程设计,不做工单追踪
  • 用户连阶段级周期数据(哪怕是粗略 P50/P90 估值)都给不出 —— 那么第一步应是去埋点测量流程,而不是画图。

步骤

确定性五步流,三个脚本仅依赖 Python 标准库:

  1. 录入(Intake)。 把流程写成一个 JSON 文件,每个阶段一条记录,字段:nameownertypevalue-add | wait | rework)、duration_minutes_p50duration_minutes_p90。顶层还需 process_namewip(在制品数量,供 Little 定律用)。
  2. 绘制阶段图。 运行 process_documenter.py,产出 ASCII 泳道图 + 规范化 JSON 工件。泳道按 owner 分行,跨职能交接一目了然。
  3. 测周期时间。 运行 cycle_time_analyzer.py,计算总 P50、总 P90、增值比 VA%、等待%、返工%,以及 Little 定律吞吐估算(WIP / 周期时间)。判定:VA% > 25% = 健康(HEALTHY);10–25% = 典型(TYPICAL,多数非制造流程落在此区间);< 10% = 浪费严重(WASTE-HEAVY)
  4. 检测瓶颈。 运行 bottleneck_detector.py 并指定 --profile(saas / services / manufacturing / healthcare),产出按严重度(CRITICAL / HIGH / MEDIUM)排序的清单,每条含根因假设 + 一条推荐动作。
  5. 给建议。 把瓶颈清单与周期判定结合,依 Goldratt"一切服从于约束"原则,每次只推荐一个聚焦约束点的改进动作。绝不建议优化非约束阶段。

指令

模板与三脚本配套使用(先填模板的阶段表,再翻译成 JSON):

python3 scripts/process_documenter.py    --input my-process.json
python3 scripts/bottleneck_detector.py   --input my-process.json --profile saas
python3 scripts/cycle_time_analyzer.py   --input my-process.json --profile saas
  • process_documenter.py:读取并校验流程 JSON,输出 Markdown 泳道图(按 owner 分行,阶段标注 type + 时长)及下游可用的规范化 JSON。--sample 可打印一个 6 阶段采购申请示例。
  • bottleneck_detector.py 的三条确定性规则:
    • R1: 某阶段 P50 > 2× 增值阶段均值 → 阶段瓶颈。
    • R2: 等待态占总周期 > 40% → 交接瓶颈。
    • R3: 返工占总周期 > 15% → 质量瓶颈。
    • 阈值随 --profile 调整:manufacturing 容忍的等待最少(wait≤30%、返工≤10%、倍数 1.8),services(≤50%/15%/2.5)与 healthcare(≤55%/12%/2.5)因人工/监管环节容忍更高,saas 为默认基线(≤40%/15%/2.0)。
  • type 三类定义(Lean 正典): value-add = 从客户视角真正改变工作产物、客户愿意为之付费(多数阶段并非增值);wait = 排队/闲置/等人,是办公流程周期膨胀的最大来源;rework = 修复上游缺陷而存在,Six Sigma 视其为上游质量问题。

示例

一条采购申请流程的典型阶段(节选 JSON):

{
  "process_name": "采购申请",
  "wip": 12,
  "stages": [
    {"name": "提交申请", "owner": "申请人", "type": "value-add", "duration_minutes_p50": 15, "duration_minutes_p90": 30},
    {"name": "等待经理审批队列", "owner": "经理", "type": "wait", "duration_minutes_p50": 480, "duration_minutes_p90": 1440},
    {"name": "等待财务复核", "owner": "财务", "type": "wait", "duration_minutes_p50": 720, "duration_minutes_p90": 2880},
    {"name": "返工——缺供应商 W-9", "owner": "申请人", "type": "rework", "duration_minutes_p50": 120, "duration_minutes_p90": 360}
  ]
}

跑下来两段 wait 合计远超处理时间,VA% 很可能落入 WASTE-HEAVY;R2 触发交接瓶颈,约束点是审批队列,建议是移除交接/取消批处理,而非给等待型流程加人。

注意事项

  • 一次只映射一条流程。 Goldratt:约束是单点。同时画十条会稀释注意力。
  • 不要优化非约束阶段。 若阶段 4 是瓶颈,加速阶段 2 只会在阶段 4 前堆积在制品。一切服从于约束。
  • 别把总周期时间当成处理时间。 二者几乎从不相等,VA% 揭示这道鸿沟。
  • 别给等待型流程加人。 等待时间不靠堆人头解决,靠移除交接或批处理。
  • 别把返工当独立问题。 返工环路属于流程图的一部分;藏起来会低估真实周期时间。
  • type 标注必须诚实。 把"等待"错标成"增值"是最常见的数据质量失败。
  • as-is 优先。 先映射现状流程,识别瓶颈后再画 to-be 目标流程(Rother & Shook《Learning to See》)。
  • 能用真实数据就别用估值。 从工单系统(Jira/ServiceNow/Zendesk)拉阶段时长;估值仅供首轮,做任何变更决策前须替换为实测值。

互见

  • first-principles-thinking:在质疑"流程为何如此"、拆解约束根因时配合使用。

本条采编自 alirezarezvani/claude-skills(MIT 许可)。