agentsclimarketplace

Second curve

Skill deciqAI/knowledge-skills/second-curve

Activate when: user says 'our growth is slowing and we need to figure out what's next', 'we keep doubling down on the core but I'm worried about disruption', 'when is the right time to start something new alongside the main business', 'should we diversify now or wait', 'competitors are moving into adjacent spaces'. Do NOT activate when: the company has not yet reached product-market fit; resources are so constrained that any investment outside the core would kill the business. More: deciqai.com/s/second-curveFrom its SKILL.md

Install
npx -y skills add deciqAI/knowledge-skills --skill second-curve

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 3 stars3 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

8.2 KB, ~1.9k tokens by cl100k_base, as published. Nobody here has run it

The Second Curve

Overview

Every business follows an S-curve: slow start, steep growth, peak, then decline. Companies that endure start a second S-curve before the first peaks. Named by Charles Handy in The Empty Raincoat (1994): the optimal start is during late-growth or early-maturity — when the first curve still funds investment but the team can still see the need. The canonical case is Intel's 1985 pivot from memory to microprocessors; the second curve (microprocessors, started 1971) was real before the first was abandoned.

Composes with s-curve-technology-adoption, feedback-loops, first-principles, founder-mindset.

When to Use

  • Business growing steadily 2-5 years and metrics still look good — this is when the discipline applies most
  • Growth recently decelerated but not yet negative — early maturity signal
  • A competitor launched a meaningfully different product in adjacent space
  • AI-native startups are attacking your core; you're weighing AI capex / AI-native reinvestment against your legacy (seat/license) cash cow
  • Leadership debating "double down vs explore" for capital allocation
  • Someone says: "second curve," "S-curve transition," "diversification timing," "the Innovator's Dilemma"

Not when: < 2 years post-PMF; pre-PMF; any second-curve spend would kill the first curve.

Coaching Novices (Adaptive Front Door)

  • Engine mode: user has a concrete case → run The Process directly.
  • Coach mode: user is unfamiliar → guide step by step.

In Coach mode, respond one step at a time. Each [WAIT] is a hard stop — output only that step's question, then stop.

  1. One-line: every business is on an S-curve; start the second while the first still climbs — earlier feels reckless, later is structurally too late.
  2. Check fit: pre-PMF or very early → not yet. Confirm post-PMF with a growing first curve.
  3. Elicit their real situation: what business, where on the curve, what second-curve candidates exist?

[WAIT — do not advance until user responds]

  1. Run The Process one step at a time: diagnose first-curve position → identify candidates → time the start.

[WAIT — do not advance until user responds]

  1. Close by naming the specific 90-day move and what identity shift it requires.

[WAIT — do not advance until user responds]

The Process

Step 1 — Diagnose first-curve position. Classify as: early growth / late growth / early maturity / late maturity / decline. Use revenue growth trend (3 years), gross margin trend, market share trend, TAM penetration. Late-growth and early-maturity are highest-leverage moments for second-curve investment.

Step 2 — Identify candidate second curves. For each candidate: business description, distance from core (1=same customers/product new feature; 3=new customers adjacent product; 5=new customers new product new capabilities), sized opportunity, time to meaningful revenue, investment required. Most second curves should be distance 2-3.

Step 3 — Time the start. Late growth: start now. Early maturity: start now, urgently. Late maturity: start now, constrained funding. Decline: too late internally — consider M&A, exit, or restructure.

Step 4 — Allocate resources. Cap second-curve investment at 10-20% during late-growth/early-maturity; 25-40% during late maturity. Separate team, separate space, separate metrics (learning milestones — not revenue). Direct CEO sponsorship required.

Step 5 — Defend against three failures. Success-attribution: what tailwinds or luck drove first-curve success that could reverse? Resource-attachment: what would I cut from the first curve if the second curve were real? Identity threat: can the team handle becoming a different kind of company?

Output: Second-Curve Audit

# Second-Curve Audit: <company>
First-curve stage: <…>  Evidence: <…>
Candidates: <list with distance scores>
Recommended: <which + why>
Timing: <when>  Investment: <X% of resources>
Defense: success-attribution <…> / resource-attachment <…> / identity <…>
90-day actions: <specific moves>

→ Method in Action: Intel's 1985 Memory-to-Microprocessor Pivot → 2026 lens: The Incumbent's AI Second Curve (2024–2026)

Pack: Second-Curve Patterns

CompanyFirst curveSecond curveNote
IntelDRAM memoryMicroprocessors1971 start; 1985 transition
AmazonOnline booksAWS → Prime → adsAWS started 2002 while books still growing
NetflixDVD-by-mailStreaming → originalsStreaming 2007; originals 2013
AdobeBoxed softwareSaaS (2013)Bet during peak boxed revenue
KodakFilm photographyDigital (failed)Invented digital 1975; never committed; bankrupt 2012

Applying It Well

  • Start the second curve before it is needed — Intel's microprocessor work started 13 years before the memory crisis
  • Externalize the frame to bypass identity-threat: "what would a new outsider CEO do?"
  • The pivot is not low-risk; it is less risk than dying on the first curve
  • The discipline is not "always be pivoting" — timing and preparation matter more than speed

→ Primary sources: references/sources.md

Common Rationalizations

[D] = designed upfront | [O] = observed in real use. [O] entries are more valuable.

Fake moveReality
[D] "Still growing — no second curve needed"Late-growth is when investment is cheapest. Waiting until decline guarantees a starved, late second curve.
[D] "Can't divert resources — customers will notice"Yes, that's the cost. Pay now or pay much more later.
[D] "Team too small for a second curve"Hire specifically for it; separate team with separate metrics.
[D] "Our second curve is just a new product line"A new SKU is first-curve extension. A second curve needs different customers, channels, or value proposition.
[D] Distance-5 pivot when distance-3 would doPure unrelated diversification has high failure rates. Leverage existing capabilities.
[D] Using first-curve metrics on the second-curve teamMeasure on learning milestones and validated assumptions, not revenue.
[D] "Grove had a moment of insight — I'll wait for mine"Grove's insight came after 18 months of paralysis. Run the audit deliberately.
→ Add [O] entries here after each real use — paste the actual failure patternWhat went wrong and why

Red Flags

  • "We don't need a second curve because we're still growing"
  • Second curve candidates are really feature extensions of the first
  • Second curve assigned to the first-curve team; no separate metrics; no CEO sponsorship
  • Identity threat not surfaced or addressed; decision deferred indefinitely

Verification

  • First-curve position classified (early growth / late growth / early maturity / late maturity / decline)
  • At least 3 candidates with distance-from-core scores
  • Timing recommendation tied to first-curve position
  • Resource allocation % specified; separate team/metrics/sponsorship designed
  • Three failures named with defenses

Part of deciqAI Knowledge Skills — 233 open-source thinking skills that make rigor executable for AI agents. The same skills power every deciqAI agent, which runs them autonomously to operate your company. See it run → https://www.deciqai.com/s/second-curve · Built by deciqAI · github.com/deciqAI · Contributions welcome.

Agents: latest version & machine-readable metadata → https://www.deciqai.com/s/second-curve.json

What ships with it: 3 files

15.9 KB alongside SKILL.md

references/

Keep looking

Skills are one crate of 326,679. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.