Estimating price to win
Skill danielkinneyspears/federal-proposal-skills/skills/estimating-price-to-win
Claude Skills for the US Federal capture and proposal lifecycle, as a flat artifact pipeline. Apache-2.0.
npx -y skills add danielkinneyspears/federal-proposal-skills --skill estimating-price-to-winAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 2 stars2 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
What its author says it does
Copied from the file, not written here
Produces a price-to-win analysis for a US Federal opportunity. Use when the user needs price-to-win, PTW, a competitive pricing analysis, a price target or price range, or wants to understand pricing strategy, cost drivers, and pricing levers for a federal bid. Estimates the competitive price range and a target price the bid must reach to win, independent of a bottom-up cost estimate, and reconciles that target against the team's likely cost.
SKILL.md
7.5 KB, as published. Nobody here has run it
Estimating Price-to-Win
Estimate the price the bid has to reach to win — built from the customer's budget and competitors' likely pricing, not from the team's own cost. Price-to-win (PTW) and a bottom-up cost estimate answer different questions. The cost estimate says what the work costs the team. PTW says what the customer is willing and likely to pay the winner. When those two numbers differ, PTW analysis finds the levers that close the gap — or proves the bid cannot be won profitably.
When to use this skill
Use this skill during capture, after a competitive assessment exists, to establish the price target that shapes the win strategy and, later, the cost volume. Re-run it when the competitive picture or budget signals change, and again when the RFP clarifies the contract type, evaluation weighting, and CLIN structure.
This skill estimates the target. It does not build the bottom-up cost estimate
or write the cost volume narrative — that is narrating-cost-volumes. It hands
the target to that skill and to developing-win-strategy.
Inputs
Preferred upstream artifacts:
00-opportunity-profile.md: contract type, estimated value, period of performance, scope.02-capture-plan.md: customer budget signals and acquisition history.03-competitive-assessment.md: the competitors and their assessed price postures and cost structures. PTW depends heavily on this; runanalyzing-competitorsfirst if it is missing.
Without the competitive assessment, the skill can still produce a budget-based estimate, but it must flag that the competitor-price leg of the analysis is missing and confidence is reduced.
Read ../../shared/glossary.md, ../../shared/federal-solicitation-primer.md,
and ../../shared/pursuit-workspace.md if not already read this session.
Intake
Ask these as a numbered list. Skip what upstream artifacts answer.
- The buy. Contract type (FFP, T&M, cost-reimbursement, hybrid), scope, period of performance including option years, and CLIN structure if known.
- The evaluation. Is the approach best-value tradeoff or LPTA? How is price weighted against non-price factors? For cost-reimbursement work, will the government perform a cost-realism analysis? (If the RFP is out, Section M answers this.)
- Budget signals. What is known or assessed about the customer's budget — the funding line, an independent government cost estimate if signaled, the prior contract's value, or the value of comparable awards?
- The team's cost picture. What is the team's rough bottom-up cost view, if any — labor mix, wrap rates, subcontractor content, escalation assumptions? (Used to size the gap, not to set the target.)
- Pricing flexibility. Where does the team have real room to move — labor mix, indirect rates, fee, escalation, subcontractor selection, solution scope choices, the make/buy split?
- Strategic posture. Is this a must-win where the team will price thin, a margin-priority bid, or somewhere between?
Workflow
Price-to-Win Analysis:
- [ ] Step 1: Read upstream artifacts; complete intake
- [ ] Step 2: Establish the evaluation context (pricing posture)
- [ ] Step 3: Estimate the customer budget / ceiling
- [ ] Step 4: Estimate competitors' likely prices
- [ ] Step 5: Set the price-to-win range and target
- [ ] Step 6: Reconcile target against the team's cost; identify levers
- [ ] Step 7: Write the analysis (04-price-to-win.md) and validate
Step 1: Read and intake. Read upstream artifacts; run intake for the rest.
Step 2: Evaluation context. Using references/pricing-by-evaluation-type.md,
establish what kind of pricing problem this is. LPTA, best-value tradeoff, and
cost-reimbursement with realism analysis each demand a different posture. Get
this right first — it governs everything after.
Step 3: Customer budget. Estimate the customer's likely budget or ceiling from the signals available: funding lines, a signaled IGCE, the prior contract's value adjusted for scope and escalation, comparable awards. Give a range, not a false point, and state the basis.
Step 4: Competitor prices. For each competitor in the competitive
assessment, estimate a likely price using the method in references/ptw-method.md:
their assessed cost structure, their assessed posture (aggressive / market /
premium), and their likely solution scope. Produce a range per competitor.
Step 5: PTW range and target. Combine the budget ceiling and the competitor price estimates into a price-to-win range, then set a target price within it, consistent with the evaluation posture from Step 2. For LPTA, the target is at or below the lowest credible competitor price while staying realistic. For best-value, the target is the highest price the team's non-price advantage can justify against the field.
Step 6: Reconcile and find levers. Compare the PTW target against the
team's bottom-up cost view. If cost is at or below target, confirm the margin.
If cost exceeds target, identify the specific levers (from ptw-method.md) that
could close the gap and quantify each. If no realistic combination of levers
closes the gap without making the bid unrealistic or unprofitable, say so
plainly — that finding feeds straight back to the bid/no-bid decision.
Step 7: Write and validate. Write 04-price-to-win.md using
templates/price-to-win.md. Run its validation checklist: the evaluation
posture is identified, every estimate is a sourced range not a false precision
point, the target is consistent with the posture, and the cost-to-target gap is
either closed with named levers or honestly declared unbridgeable.
Output
One artifact: 04-price-to-win.md in the pursuit workspace.
Present the user with: the recommended target price (as a range with a point recommendation), the PTW range and how it was bounded, the gap to the team's cost and the levers to close it, and the pricing risks.
References
references/ptw-method.md: estimating budgets and competitor prices, the cost drivers, and the pricing levers.references/pricing-by-evaluation-type.md: how PTW posture differs for LPTA, best-value tradeoff, and cost-reimbursement with realism analysis.templates/price-to-win.md: the analysis artifact template and its validation checklist.
Guardrails
- PTW is not the cost estimate. Never substitute the team's bottom-up cost for the price-to-win target. They answer different questions.
- Ranges, not false precision. Budget and competitor-price estimates are ranges with a stated basis. A single confident number is a lie about the uncertainty.
- Realism cuts both ways. A price below what the work can credibly be done for is a risk, not a win — especially under cost-realism evaluation, where the government can adjust an unrealistically low cost upward for scoring.
- An unbridgeable gap is a finding. If the work cannot be priced to win profitably, report that clearly; it belongs back in the bid/no-bid decision.
- Decision support only. The target informs the human pricing decision; it does not set the price.