Wacv workflow
Skill brycewang-stanford/Awesome-Journal-Skills/WACV-Skills/skills/wacv-workflow
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill wacv-workflowAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when planning a WACV campaign calendar across the two-round model, from track and round choice through the Round 1 submission, rebuttal, and Accept/Revise-and-Resubmit/Reject decision, into the Round 2 revision and decision, camera-ready, and the winter conference — with the branch points that a single-deadline plan misses.
SKILL.md
4.9 KB, as published. Nobody here has run it
WACV Workflow
Use this to run a WACV campaign end to end. The defining feature is that WACV has two rounds with a revision path between them, so the calendar is a branching tree, not a single deadline. Dates below are the reported WACV 2027 timetable read on 2026-07-09 (via search rendering — reconfirm on the live Dates page); the structure is stable, the exact dates are not.
The branching calendar
Track + round decision ──► Round 1 paper deadline (reported Jun 26, 2026)
│
├─ R1 reviews (reported due Jul 24) ─► optional 1-page rebuttal
│
└─ R1 decision (reported Aug 7)
├─ Accept ──────────────► camera-ready
├─ Reject ──────────────► re-target / rebuild
└─ Revise & Resubmit ─► revise + change summary
│
Round 2 deadline (reported Aug 28) ◄─ new R2 papers also enter here
│
R2 reviews (reported due Sep 25) ─ (no rebuttal)
│
R2 decision (reported Oct 9) ─► Accept / Reject
│
registration (reported Nov 2) ─► winter conference (Jan 2027, 待核实)
Phase-by-phase
| Phase | Do this | Skill |
|---|---|---|
| Scope | Decide WACV vs sibling, Applications vs Algorithms, and R1 vs R2 | wacv-topic-selection |
| Draft | Write the first page for the chosen track and the two-round reviewer | wacv-writing-style |
| Evidence | Build matched-baseline, constraint-aware experiments with uncertainty | wacv-experiments, wacv-reproducibility |
| Submit R1 | Audit anonymity, profiles, page cap, track field | wacv-submission, wacv-supplementary |
| R1 reviews | Draft the optional one-page rebuttal, AC-first | wacv-author-response, wacv-review-process |
| R&R lap | Execute the revision as a spec; write the change summary; sync the artifact | wacv-author-response, wacv-artifact-evaluation |
| Camera-ready | De-anonymize, finalize for CVF open access + IEEE Xplore | wacv-camera-ready |
| Present | Prepare the winter conference talk/poster | wacv-camera-ready |
Branch points a single-deadline plan misses
- Round choice is a scheduling decision, not just a deadline. A borderline paper belongs in Round 1 (rebuttal + Revise-and-Resubmit net); a polished one can go to Round 2. Deciding this late forfeits the safety net.
- The Revise-and-Resubmit lap is the main event, not a detour. Most WACV papers pass through it; budget real engineering time for the revision between the R1 decision and the R2 deadline, because Round 2 has no rebuttal to compensate for a rushed revision.
- Two OpenReview groups. Round 1 and Round 2 are distinct groups; do not assume a single submission carries over automatically — follow the current instructions for resubmitting a Revise-and-Resubmit paper.
A worked mini-plan (borderline applications paper)
T-3 wk: freeze track = Applications; target Round 1 for the R&R net
T-2 wk: matched-budget baselines re-run; uncertainty over seeds/sessions locked
T-1 wk: anonymity + profile + page-cap audit (wacv-submission)
R1 deadline: submit
+reviews: one-page rebuttal fixes the top factual objection
R1 = Revise & Resubmit: turn the three reviews into a change list; execute; write summary
R2 deadline: resubmit revised paper + change summary
R2 = Accept: camera-ready; register by the deadline; prep winter poster
Reverify each cycle
- Both round deadlines, the review/decision dates, and the registration deadline.
- Whether the two-round model and the three R1 outcomes still hold.
- The camera-ready deadline and the winter conference dates/location (2027 dates 待核实).
Output format
[Current phase] scope / draft / R1 submit / R1 reviews / R&R / R2 / camera-ready / present
[Round + track] R1|R2 · Applications|Algorithms
[Next hard date] <deadline> — <what it gates>
[Branch risk] <the decision that, if made late, forfeits the R&R net>
[Next skill] <which WACV skill to open now>