Vldb workflow
Skill brycewang-stanford/Awesome-Journal-Skills/VLDB-Skills/skills/vldb-workflow
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill vldb-workflowAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when planning a VLDB project on the PVLDB rolling calendar, covering month-picking strategy, the volume-to-conference mapping and acceptance cutoff, budgeting a possible three-month revision, coordinating author caps across a group, and backward planning from the 25th-abstract / 1st-paper rhythm.
SKILL.md
3.7 KB, 823 tokens by cl100k_base, as published. Nobody here has run it
VLDB Workflow
Use this as the project-management layer. PVLDB's defining freedom — a deadline every month — is also its trap: with no scarcity forcing quality, the calendar discipline must come from you.
Know your volume geometry first
On 2026-07-08 the live volume is Vol 20: deadlines April 1, 2026 through March 1, 2027, feeding VLDB 2027 (Athens, Aug 23-27, 2027). Vol 19 fed VLDB 2026 (Boston, Aug 31 - Sep 4, 2026) with a June 15, 2026 acceptance cutoff; acceptances after a cutoff roll to the next conference. Re-derive this geometry from the live guidelines whenever you plan — it resets every volume.
Month-picking, done as arithmetic
The right month is computed backward from what you want, not chosen by mood:
| Goal | Computation |
|---|---|
| Present at the volume's conference | Cutoff month − 1.5 months (review) − 3 months (possible revision) − 1.5 months (re-review) ⇒ submit roughly 6 months before the cutoff to keep the revision path open |
| Accept-or-nothing, no revision slack | Cutoff − 1.5 months, accepting that a revise verdict rolls you past it |
| No conference-year preference | The month your weakest experiment is actually fixed |
| Thesis or job-market date | Decision date needed + 1 month safety, then backward as above |
The month itself carries no difficulty signal — the review board is standing and the bar is flat. What varies is your readiness.
One cycle, backward from the 1st
Day -21 go/no-go: evaluation complete? loss map measured?
Day -14 internal builder-review (a colleague reads as Reviewer 2)
Day -10 fixes from mock review; freeze the claim set
Day -6 (25th) abstract registered in CMT — title and authors final
Day -5..-2 full-text polish, artifact tag, fairness ledger check
Day -1 PDF built on the volume template; local time of 5PM PT confirmed
Day 0 (1st) submit hours early; Pacific afternoon, not local midnight
If the go/no-go fails, slide one month. That sentence is the whole advantage of this venue — use it instead of negotiating with your own evidence.
Revision bandwidth is a scheduling object
A revise verdict opens a three-month window that will collide with whatever else the group planned. Before submitting, name the two people who would own a revision and check their next quarter. A revision no one has time to execute converts positive signal into a rejection.
Group-level calendar management
- Track every member's live submissions against the two-per-month and twelve-per-year caps in one shared sheet.
- Stagger related papers across months so a shared infrastructure fix does not block two deadlines at once.
- Log every cycle's dates the moment reviews arrive: decision on the ~15th, revision due date, expected issue. Rolling venues punish loose bookkeeping with silent misses.
Conference logistics tail
Publication precedes presentation by months. After acceptance: registration, visa lead time for the conference country (Greece for Vol 20's VLDB 2027), and speaker assignment — obligations and pricing are cycle-specific (待核实 on the conference site).
Output format
[Volume geometry] <live volume, cutoff, conference>
[Target month + rationale] <computed, not vibes>
[Go/no-go state] <evaluation, loss map, artifact, writing>
[Revision bandwidth] <owners named, quarter checked>
[Cap ledger] <per-author counts>
[Slip plan] <what triggers moving one month>
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.