agentsclimarketplace

Vldb workflow

Skill brycewang-stanford/Awesome-Journal-Skills/VLDB-Skills/skills/vldb-workflow

Use when planning a VLDB project on the PVLDB rolling calendar, covering month-picking strategy, the volume-to-conference mapping and acceptance cutoff, budgeting a possible three-month revision, coordinating author caps across a group, and backward planning from the 25th-abstract / 1st-paper rhythm.From its SKILL.md

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill vldb-workflow

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

SKILL.md

3.7 KB, 823 tokens by cl100k_base, as published. Nobody here has run it

VLDB Workflow

Use this as the project-management layer. PVLDB's defining freedom — a deadline every month — is also its trap: with no scarcity forcing quality, the calendar discipline must come from you.

Know your volume geometry first

On 2026-07-08 the live volume is Vol 20: deadlines April 1, 2026 through March 1, 2027, feeding VLDB 2027 (Athens, Aug 23-27, 2027). Vol 19 fed VLDB 2026 (Boston, Aug 31 - Sep 4, 2026) with a June 15, 2026 acceptance cutoff; acceptances after a cutoff roll to the next conference. Re-derive this geometry from the live guidelines whenever you plan — it resets every volume.

Month-picking, done as arithmetic

The right month is computed backward from what you want, not chosen by mood:

GoalComputation
Present at the volume's conferenceCutoff month − 1.5 months (review) − 3 months (possible revision) − 1.5 months (re-review) ⇒ submit roughly 6 months before the cutoff to keep the revision path open
Accept-or-nothing, no revision slackCutoff − 1.5 months, accepting that a revise verdict rolls you past it
No conference-year preferenceThe month your weakest experiment is actually fixed
Thesis or job-market dateDecision date needed + 1 month safety, then backward as above

The month itself carries no difficulty signal — the review board is standing and the bar is flat. What varies is your readiness.

One cycle, backward from the 1st

Day -21        go/no-go: evaluation complete? loss map measured?
Day -14        internal builder-review (a colleague reads as Reviewer 2)
Day -10        fixes from mock review; freeze the claim set
Day -6 (25th)  abstract registered in CMT — title and authors final
Day -5..-2     full-text polish, artifact tag, fairness ledger check
Day -1         PDF built on the volume template; local time of 5PM PT confirmed
Day 0 (1st)    submit hours early; Pacific afternoon, not local midnight

If the go/no-go fails, slide one month. That sentence is the whole advantage of this venue — use it instead of negotiating with your own evidence.

Revision bandwidth is a scheduling object

A revise verdict opens a three-month window that will collide with whatever else the group planned. Before submitting, name the two people who would own a revision and check their next quarter. A revision no one has time to execute converts positive signal into a rejection.

Group-level calendar management

  • Track every member's live submissions against the two-per-month and twelve-per-year caps in one shared sheet.
  • Stagger related papers across months so a shared infrastructure fix does not block two deadlines at once.
  • Log every cycle's dates the moment reviews arrive: decision on the ~15th, revision due date, expected issue. Rolling venues punish loose bookkeeping with silent misses.

Conference logistics tail

Publication precedes presentation by months. After acceptance: registration, visa lead time for the conference country (Greece for Vol 20's VLDB 2027), and speaker assignment — obligations and pricing are cycle-specific (待核实 on the conference site).

Output format

[Volume geometry] <live volume, cutoff, conference>
[Target month + rationale] <computed, not vibes>
[Go/no-go state] <evaluation, loss map, artifact, writing>
[Revision bandwidth] <owners named, quarter checked>
[Cap ledger] <per-author counts>
[Slip plan] <what triggers moving one month>

What ships with it

Read from the repository

Just SKILL.md. No reference files, no scripts.

Keep looking

Skills are one crate of 325,949. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.