Usenixsec workflow
Skill brycewang-stanford/Awesome-Journal-Skills/USENIX-Security-Skills/skills/usenixsec-workflow
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill usenixsec-workflowAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when planning a USENIX Security Symposium project end to end — choosing between the two annual cycles, mapping the registration-to-camera-ready calendar for a chosen cycle, sequencing artifact and ethics work early, and coordinating a team across the multi-deadline Big-Four calendar.
SKILL.md
5.2 KB, ~1.3k tokens by cl100k_base, as published. Nobody here has run it
USENIX Security Workflow
USENIX Security runs two independent submission cycles per year, so "when do we submit?" is a real strategic choice, not a fixed date. This skill turns a target cycle into a dated backward plan and assigns owners to the venue-specific risks. Dates below are the '26/'27 cycle values read on 2026-07-08 (via search renderings; usenix.org direct fetch 403'd) — reconfirm against the live CFP.
Step 1: pick the cycle
| Consideration | Favors the earlier cycle | Favors the later cycle |
|---|---|---|
| Readiness | Evaluation truly done now | Needs one more experiment done right |
| Conference lead time | Cycle-1 accepts publish ~7 months pre-symposium | Cycle-2 accepts closer to the event |
| Competing deadlines | Avoids clashing with a CCS/S&P/NDSS date | Room to route a reject to the next venue |
| Resubmission runway | Reject still leaves the same-year second cycle open* | Reject pushes to next year |
*Subject to the cycle's resubmission-restriction text — the '26 CFP delegated
Cycle-2 reject restrictions to the '27 chairs, so verify before assuming a reject
can re-enter (see usenixsec-review-process).
Reference calendar (verify per cycle):
| Milestone | Sec '26 C1 | Sec '26 C2 | Sec '27 C1 | Sec '27 C2 |
|---|---|---|---|---|
| Registration | Aug 19 '25 | Jan 29 '26 | Aug 18 '26 | Jan 19 '27 |
| Submission | Aug 26 '25 | Feb 5 '26 | Aug 25 '26 | Jan 26 '27 |
| Early reject | Oct 7 '25 | Mar 17 '26 | 待核实 | 待核实 |
| Notification | Dec 4 '25 | May 14 '26 | 待核实 | 待核实 |
| Finals | Jan 15 '26 | Jun 11 '26 | 待核实 | 待核实 |
| Symposium | Aug 12–14 '26 (Baltimore) | Aug 11–13 '27 (Denver) |
Step 2: backward-plan from the registration date
Registration, not submission, is the first hard wall (it freezes title, abstract, authors, conflicts a week early). Plan backward from it:
T-12 wk Topic/venue fit locked (usenixsec-topic-selection); threat model drafted
T-10 wk Core experiments running; artifact repo scaffolded from day one
T-8 wk Related-work sweep of all Big-Four cycles closed since last pass
T-6 wk Adaptive-attacker / base-rate experiments (the ones that get demanded)
T-4 wk Full draft; Ethical Considerations + Open Science appendices written
T-3 wk Internal review + cold-reader pass on intro/threat model
T-2 wk Anonymization sweep; artifact anonymous mirror live and tested
T-1 wk REGISTRATION: freeze metadata; final polish only after this
T-0 Submit; re-download from HotCRP and read cold
The two moves teams most often leave too late: the adaptive-attacker experiment (defenses) and the ethics/disclosure timeline (live-system work). Both must start weeks before the deadline — a disclosure clock especially cannot be compressed, since vendors set the pace.
Step 3: assign the venue-specific risks
| Risk | Owner | Early mitigation |
|---|---|---|
| Ethics/disclosure not started | PI | Open the disclosure and IRB threads at project start |
| Artifact not reproducible | Eng lead | Build the repo alongside the code, not after the paper |
| Threat model drifts from eval | First author | Adversary-consistency review at T-3 wk |
| Anonymity leak in artifact | Eng lead | Anonymous mirror built and log-out-tested by T-2 wk |
| Missed a fresh Big-Four paper | Reader | Dated literature sweep at T-8, re-sweep at T-2 |
Step 4: run the post-submission and post-decision phases
- Waiting: expect the early-reject gate first (a survivable-but-quiet signal), then full notification. Do not start the next paper assuming acceptance, but do keep the artifact repo warm — acceptance starts the Phase-1 clock immediately.
- Shepherd approval: scope the change list within 48 hours; it fits a two-week
window and no more (see
usenixsec-author-response). - Accept: run camera-ready and Phase-1 artifact availability in parallel — they
share a deadline (see
usenixsec-camera-ready). - Reject: mine the reviews, check the resubmission restriction, decide between the next USENIX cycle and a sibling venue with an open deadline.
Coordinating across the Big-Four calendar
Because USENIX Security, CCS, S&P, and NDSS each run multiple deadlines, a lab can keep a paper in motion nearly year-round — but a paper may sit under review at only one archival venue at a time. Maintain a shared deadline board and a one-in-one-out rule per paper; the dual-submission bar is real and enforced.
Reverify each cycle
- All dates in the table above ('27 review/notification/finals are 待核实).
- Symposium location and dates for your target year.
- Resubmission restrictions gating cycle-to-cycle and year-to-year moves.
Output format
[Cycle chosen] which cycle + why (readiness / lead time / clash / runway)
[Backward plan] dated milestones from registration wall
[Risk owners] the five venue risks assigned + early mitigations underway
[Post-decision] branch plan for accept / shepherd / reject