Tacas workflow

Skill brycewang-stanford/Awesome-Journal-Skills/TACAS-Skills/skills/tacas-workflow

Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill tacas-workflow

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

Use when planning a TACAS (ETAPS) project timeline from category choice and venue fit through the EasyChair paper deadline, the mandatory tool-paper artifact deadline, the rebuttal window, notification, the voluntary post-acceptance artifact round, LNCS camera-ready, and presentation, with backward-planning offsets that account for TACAS's single annual round and its parallel paper+artifact review.

SKILL.md

5.2 KB, ~1.2k tokens by cl100k_base, as published. Nobody here has run it

TACAS Workflow

Use this as the project-management skill for a TACAS submission. Replace every date with the current ETAPS joint schedule and work backwards from the EasyChair paper deadline — remembering that for a tool or tool-demonstration paper a second, firm artifact deadline lands about two weeks later and its evaluation runs in parallel with the PC. TACAS runs a single annual review round on the shared ETAPS calendar (it does not use ESOP's two rounds), so missing the deadline costs roughly a year.

TACAS is a conference whose proceedings are an open-access LNCS volume: it has no standing editor-in-chief and no author-facing APC. Rotating leadership is the per-edition PC chairs and the ETAPS steering committee; the cost model is registration, and ETAPS funds the gold open access centrally. Chairs rotate yearly — re-check the current TACAS page rather than carrying a name forward.

The reported TACAS 2026 timeline (verify on the live page)

  • Paper submission: 16 Oct 2025 (AoE).
  • Mandatory artifact (regular tool + tool-demonstration): 30 Oct 2025.
  • Rebuttal / author response: 8-10 Dec 2025.
  • Notification: 22 Dec 2025.
  • Voluntary artifact (accepted research + case-study): 8 Jan 2026.
  • Conference: ETAPS 2026, Turin, 11-16 Apr 2026 (main conferences 13-16 Apr).

As of 2026-07-09 the TACAS 2026 edition has already taken place, so the live next target is TACAS 2027 (ETAPS 2027, Copenhagen, 10-15 Apr 2027).

Milestones

  • Venue + category fit: confirm TACAS over CAV/VMCAI/FMCAD and pick the category (tacas-topic-selection) — this fixes the page limit, blind mode, and artifact obligation.
  • Evidence + tool lock: freeze the algorithm/tool, the benchmark set, the baselines, and the artifact contents.
  • Submission: upload the LNCS PDF via EasyChair; anonymize if it is a research paper.
  • Mandatory artifact (tool/tool-demo): submit the clean-VM artifact on its firm deadline; it gates acceptance.
  • Rebuttal: answer the reviews in the ETAPS response window.
  • Notification: archive reviews and every submitted version.
  • Voluntary artifact (research/case-study): if pursuing badges, submit after acceptance.
  • Camera-ready + presentation: prepare the LNCS camera-ready, complete Springer rights, register, and present.

Backward plan from the paper deadline

Weeks out (heuristic)Verification-tool milestone
10+Category chosen; algorithm/tool feature-frozen; benchmark set and baselines chosen
8Experiments run; wall-clock/scalability logged on stated hardware; soundness argument drafted
6Comparison against the strongest baseline complete with equal budgets; results tables built
4Full draft in llncs.cls within the page limit; artifact assembled in the clean VM
3Internal mock review by a verification-literate reader; artifact dry-run on a fresh VM
2Tool/tool-demo: freeze the artifact for its post-paper deadline; research: anonymity sweep
1Final PDF check; EasyChair fields, category, conflicts complete
0Submit paper; then (tool/tool-demo) submit the mandatory artifact on its firm date

These offsets are planning heuristics only — anchor every one to the current ETAPS joint CfP, never to a previous cycle.

Failure modes by stage

  • Leaving the artifact to after the paper for a tool/tool-demo paper — the mandatory artifact deadline is only ~two weeks out and a package that does not build on the ETAPS VM costs the paper.
  • Experiments still moving at week 4 forces last-minute benchmark runs nobody has audited — the classic unfair-comparison or unreproducible-result reject.
  • Anonymizing the wrong category — stripping the tool name from a single-blind tool paper, or forgetting to anonymize a double-blind research paper.
  • Treating the rebuttal as decisive — it corrects misreadings and supplies a missing number; it does not rewrite the paper.

Coordination notes

  • Assign one owner for the artifact / clean-VM build and another for the paper; for a tool paper these are two deadlines a fortnight apart and shared ownership is how the artifact slips.
  • Archive the exact submitted PDF and artifact — the rebuttal and camera-ready must quote them.

Output format

[Current stage] idea / evidence / writing / submitted / rebuttal / notified / camera-ready / accepted
[Category] research / case-study / regular tool / tool-demonstration
[Next official deadline] <paper or mandatory-artifact date and source, or unknown>
[Critical path] <three tasks that determine readiness, incl. artifact for tool papers>
[Risk register] <category fit / page limit / anonymity / benchmark fairness / artifact-on-VM / presentation>
[Owner map] <task -> person or role>