agentsclimarketplace

Sosp workflow

Skill brycewang-stanford/Awesome-Journal-Skills/SOSP-Skills/skills/sosp-workflow

Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill sosp-workflow

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

Use when planning a SOSP campaign across the annual cycle — back-scheduling from the spring abstract and paper deadlines, running the summer response and July notification, stacking the August camera-ready with artifact evaluation, and retargeting rejections across the SOSP/OSDI/EuroSys circuit.

SKILL.md

4.9 KB, ~1.1k tokens by cl100k_base, as published. Nobody here has run it

SOSP Workflow

Use this to place a project on the SOSP calendar and to decide what to do in the current phase. SOSP has been annual since 2024 (the SIGOPS announcement is at sigops.org/2023/sosp-is-going-annual/), which changed campaign planning from a two-year bet into a rolling circuit. All dates below were checked 2026-07-08.

The 2026 cycle as the template

Milestone (2026 cycle)DatePhase it opens
Abstract registrationMarch 27, 2026 (Apr 1 AoE window rendered in EDT on HotCRP)Freeze title/authors/conflicts
Full paper deadlineApril 2, 2026, 7:59:59 AM EDTReview
Author response windowAnnounced with reviews, pre-PC-meetingsosp-author-response
NotificationJuly 3, 2026Camera-ready + AE (accepted) or retarget (rejected)
Camera-readyAugust 28, 2026Shepherded final version
ConferenceSep 29 - Oct 2, 2026, Prague, Czech RepublicTalk, posters, workshops

As of 2026-07-08 the notification has just landed: teams are either five days into the acceptance track or five days into retargeting. SOSP 2027 dates are unpublished (待核实 at sigops.org and sosp.org); the annual pattern implies a spring 2027 deadline, but never back-schedule against an implied date — only against a posted one.

Accepted: three threads, two months

July 3 to August 28 runs three deadline-bound conversations in parallel, and the standing failure is one person owning all three:

  1. Shepherd thread — revision plan within days, agreed scope, 13th/14th page negotiation (see sosp-camera-ready). Owner A.
  2. Artifact thread — sysartifacts registration opens days after notification; the evaluation window is interactive (see sosp-artifact-evaluation). Owner B.
  3. Logistics thread — ACM rights form, registration, Czech-entry visas where needed, talk preparation. Owner C, earliest start wins on visas.

Rejected: the retargeting circuit

Annual SOSP plus annual OSDI plus the EuroSys/ATC/NSDI ring means a systems paper is rarely more than a few months from its next natural deadline. Retarget on a decision tree, not on grief:

  • Reviews attack soundness (evaluation holes, unisolated mechanisms): fix the evidence first; the next deadline is whichever one the new experiments make.
  • Reviews attack fit or significance but concede soundness: the paper may be right for a sibling with a different center of gravity — networked-systems framing to NSDI, storage framing to FAST, deployment/practitioner framing to ATC.
  • Reviews are strong with one blocker: an OSDI resubmission in the next window with a surgical fix and a cover-your-delta introduction paragraph is the highest expected-value move. Exact sibling deadlines shift every cycle (待核实 against each venue's current CFP before promising a date to co-authors).

Back-scheduling the next submission

T-9 months   problem locked; motivating measurement exists; skeleton design review
T-6 months   system runs end-to-end on one workload; claim list drafted
T-4 months   evaluation matrix frozen (sosp-experiments); baselines built and tuned
T-10 weeks   full experimental sweep begins; env capture automated (sosp-reproducibility)
T-6 weeks    complete draft; strict 15-minute read by an outside systems reader
T-3 weeks    evaluation freeze; figures one-command from logs
T-10 days    format compile, leak sweep, conflict list drafted (sosp-submission)
T-6 days     abstract registration
T-0          upload; verify the HotCRP-held PDF, not the local one

The two intervals teams misjudge: baselines (building and fairly tuning someone else's system routinely costs a month) and the draft-to-freeze gap (a SOSP draft that first exists three weeks before the deadline reads like it).

Cadence discipline for a group

  • Track the circuit in one shared calendar: SOSP, OSDI, EuroSys, ATC, NSDI, FAST, plus HotOS in odd rhythm for early-stage ideas — each with abstract and paper gates, refreshed from official CFPs each fall and spring.
  • One project, one primary venue bet, one named fallback — deciding the fallback before notification removes the week of post-rejection drift.
  • Never submit the same work to overlapping review cycles; systems venues share PC members and treat dual submission as an integrity violation.

Output format

[Phase] where this project sits on the cycle today
[Owners] shepherd / artifact / logistics threads assigned?
[If rejected] soundness vs fit diagnosis -> named next venue + posted deadline
[Back-schedule] T-milestones with dates against the next posted deadline
[Calendar risk] the interval currently underestimated

What ships with it

Read from the repository

Just SKILL.md. No reference files, no scripts.

Keep looking

Skills are one crate of 327,132. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.