Sigcomm workflow
Skill brycewang-stanford/Awesome-Journal-Skills/SIGCOMM-Skills/skills/sigcomm-workflow
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill sigcomm-workflowAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when planning an ACM SIGCOMM project timeline around the single yearly deadline — venue fit, evidence lock, abstract registration and paper upload in February, the early-reject/rebuttal/one-shot-revision review pipeline, shepherd-run camera-ready, TAPS proceedings, artifact evaluation, and forward planning for the next edition.
SKILL.md
4.7 KB, 977 tokens by cl100k_base, as published. Nobody here has run it
SIGCOMM Workflow
Use this as the project-management skill for a SIGCOMM campaign. The defining constraint is one main-track deadline per year feeding one August conference: there is no fall gate, so the plan is a year-long backward schedule from February, not a two-shot hedge. Replace every date with the current official timetable.
SIGCOMM is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge. The rotating leadership is the per-edition General Chairs and Program Committee Co-Chairs (the 2026 roster was not retrievable on 2026-07-09 — 待核实), and the cost model is registration, not APCs; proceedings publish through ACM TAPS into the ACM Digital Library. Chairs rotate yearly, so re-check the current organization page.
Milestones
- Venue fit and track: confirm a networking-stack mechanism and pick research vs. experience.
- Evidence lock: freeze the testbed, traces, workloads, baselines, measurement methodology, and the tail metrics before writing hardens.
- Abstract registration: real title, authors, topics, conflicts on HotCRP.
- Full-paper upload: anonymous PDF, 12 single-spaced pre-reference pages, ACM template.
- Review release: triage across correctness, novelty, evaluation realism, and clarity.
- Rebuttal: for papers reaching the discussion phase, a concise anonymous reply.
- Decision: accept, one-shot revision, or reject (early or formal).
- Revision (if issued): resubmit ~a month later under a shepherd against the issue list.
- Camera-ready: shepherd sign-off, TAPS final PDF plus source, de-anonymization.
- Artifact evaluation and presentation: AEC badges, public release, August talk.
Backward plan from the February paper deadline
| Weeks out (heuristic) | Systems/measurement milestone |
|---|---|
| 14+ | Mechanism designed; testbed or trace pipeline standing and repeatable |
| 10 | Core evaluation runs producing stable tails across repeated trials |
| 7 | Baselines that fight back implemented and tuned fairly |
| 5 | Full draft in ACM two-column format, figures counting against 12 pages |
| 3 | Internal mock review by a networking-minded reader; break-point experiment added |
| 2 | Reproducibility ledger and artifact skeleton assembled |
| 1 | Anonymity sweep, HotCRP fields, abstract registered |
| 0 | Full paper uploaded AoE; receipt re-read |
These offsets are planning heuristics — anchor each to the current official timetable, never to a previous edition's calendar.
The year has two halves, not one deadline
Because the deadline is annual, the calendar after submission matters as much as before it. As of 2026-07-09 the SIGCOMM 2026 cycle is in its live post-decision phase: the February deadline passed, decisions issued, and the work now is camera-ready finalization, shepherd sign-off, artifact evaluation, and the August presentation — while the next edition's February deadline is already the horizon for new work. Plan both halves: the run-up to the single deadline, and the shepherd-to-proceedings tail that follows acceptance.
Failure modes by stage
- Evidence still moving at week 5 forces last-minute metric changes nobody has re-run — the classic evaluation-realism reject in the making.
- Leaving ACM two-column conversion to the final week surfaces figure-driven overflow late, because figures count against the 12 pages.
- Skipping the mock review forfeits the only chance to hear "your baseline is a straw man" from a friend instead of a reviewer.
- Treating a one-shot revision as optional polish rather than a shepherd-graded contract is how a revision that dodged the issue list gets rejected.
- Deferring the artifact until after acceptance loses the reproducibility evidence that a clean rebuild would have surfaced.
Coordination notes
- Assign one named owner for the reproducibility ledger and another for the anonymity sweep; shared ownership is how both slip.
- Archive the exact submitted PDF and every logged run, since rebuttal and revision replies must quote them precisely.
Output format
[Current stage] idea / evaluation / writing / abstract / submission / rebuttal / revision / accepted
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <format / anonymity / evaluation realism / reproducibility / shepherd>
[Owner map] <task -> person or role>
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.