Sensys workflow
Skill brycewang-stanford/Awesome-Journal-Skills/SenSys-Skills/skills/sensys-workflow
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill sensys-workflowAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when planning a SenSys campaign against the two-deadline calendar — deciding which deadline to target and which edition it feeds, backward-scheduling so energy campaigns and long-term deployments finish before freeze, budgeting time for the resubmission-with-revision path, and sequencing fit, building, writing, and submission.
SKILL.md
4.6 KB, ~1.0k tokens by cl100k_base, as published. Nobody here has run it
SenSys Workflow
A SenSys campaign is governed by two facts the calendar imposes: SenSys runs two submission deadlines per cycle, and its evidence is physical, so the schedule is dominated by wall-clock time you cannot compress — a 47-day deployment takes 47 days. This skill turns the cycle into a backward schedule that leaves room for the measurements and, if needed, the resubmission.
Anchor the calendar first
Before scheduling anything, pin down against the live CFP and HotCRP /deadlines page:
- Which deadline you are targeting (first or second) and which edition it feeds. As of 2026-07-09 the open gate is SenSys 2027 (New York, May 10-13, 2027), with a first-round deadline of June 6, AoE; the second-round deadline is 待核实.
- The AoE cutoff, converted per coauthor.
- Whether an abstract-registration step precedes the paper upload this edition.
Treat the numbers here as a 2026-27 snapshot; the live page controls.
Backward schedule from the deadline
Deployment and energy campaigns, not writing, are the long pole. Schedule from T-0 (paper cutoff) backward:
| Phase | Window | What must be true by the end |
|---|---|---|
| Fit + framing | T-16 wk | sensys-topic-selection cleared; the system's claim is decided |
| Build + instrument | T-14 to T-8 wk | Hardware built, energy instrument set up, testbed reserved |
| Deployment / energy campaign | T-10 to T-4 wk | Long-term runs finished; traces captured (cannot compress) |
| Analysis + writing | T-6 to T-2 wk | Figures from real traces; body drafted against the worked example |
| Reproducibility freeze | T-3 wk | Provenance captured while the testbed is still live |
| Submission audit | T-1 wk to T-0 | sensys-submission end to end on the exact upload candidate |
The overlap is deliberate: writing starts while later deployment runs finish, because you cannot begin the 6-week deployment at T-4.
Budget for the two-deadline reality
The two-deadline model changes planning in a way a single-deadline venue does not:
If targeting the FIRST deadline:
- A reject can resubmit at the SECOND deadline — but only WITH a substantive revision.
- Reserve testbed time AFTER the first notification for the new measurements a revision needs.
If targeting the SECOND deadline as a resubmission of a first-deadline reject:
- The revision + Response to Reviewers is REQUIRED, not optional (sensys-author-response).
- Back-schedule the new deployment/energy runs against the second cutoff BEFORE you commit.
A blocking reviewer objection that needs a fresh energy-harvesting deployment cannot be answered
in two weeks — decide at notification whether the resubmission is feasible on the calendar, not
after you have already missed the window to start the runs (sensys-review-process).
Sequence the whole cycle
1. Fit → sensys-topic-selection (is it SenSys after the merger?)
2. Build → hardware + instrumentation; reserve the testbed
3. Measure → sensys-experiments + sensys-reproducibility (traces captured live)
4. Write → sensys-writing-style + sensys-supplementary + sensys-related-work
5. Submit → sensys-submission (audit the exact PDF; HotCRP fields verbatim)
6. Notification → sensys-review-process (classify), then:
accept → sensys-artifact-evaluation + sensys-camera-ready
resubmit → sensys-author-response, back-scheduled to the next deadline
Standing risks to track
- Testbed contention — shared hardware is the schedule's single point of failure; reserve early.
- Deployment failures — a node dying mid-run is normal; build slack for a re-run.
- Provenance loss — capture energy method and ground truth before teardown, not after.
- Edition drift — re-confirm which edition your deadline feeds each cycle; it can shift.
Output format
[Target] which deadline + which edition it feeds + AoE cutoff in local time
[Longpole] the deployment/energy campaign duration and its start-by date
[Schedule] backward plan T-0 → T-16wk with the freeze and audit points
[Resub] if a reject, is a next-deadline resubmission feasible on the calendar? Y/N
[Open] the scheduling risk most likely to break the plan
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.