Rss workflow
Skill brycewang-stanford/Awesome-Journal-Skills/RSS-Skills/skills/rss-workflow
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill rss-workflowAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when planning an RSS (Robotics: Science and Systems) campaign end to end — the late-January abstract/paper/supplement cascade, the invited-rebuttal window, late-April decisions, July conference week — and when placing RSS inside the year-round ICRA/IROS/RSS/CoRL robotics deadline calendar.
SKILL.md
5.9 KB, ~1.3k tokens by cl100k_base, as published. Nobody here has run it
RSS Workflow
Project-manage an RSS submission against its real calendar. Anchor every date to the current edition's pages; the 2026 dates below are a verified historical snapshot (source map rows 1-3, checked 2026-07-08), not a promise about 2027.
Where the cycle stands right now (as of 2026-07-08)
- RSS 2026 (22nd edition, Sydney: UTS + ICC) runs July 13-17, 2026 — conference week starts in days. The submission funnel (abstract Jan 23 → paper Jan 30 → supplement Feb 6 → invited rebuttal Apr 3 → decisions Apr 27, all AoE) is closed.
- Accepted authors are in final-presentation mode: talk, poster, travel, and artifact
release (
rss-camera-ready,rss-artifact-evaluation). - Everyone else is planning RSS 2027, whose site, dates, and deadlines were unposted at check time (待核实). The recent pattern — late-January deadline, July conference — is a planning hypothesis only.
The robotics year, seen from RSS
RSS shares its authors with three siblings, so choosing RSS is also choosing a slot in an annual rotation. Approximate recent geometry (verify each venue's live pages):
| Venue | Typical deadline | Typical event | What slipping past RSS costs |
|---|---|---|---|
| RSS | late January | July | Next comparable single-track slot is a full year away |
| IROS | ~March | ~October | Natural catch for a paper 6 weeks short of RSS-ready |
| CoRL | ~June | ~November | Right jury if the learning story dominates |
| ICRA | ~September | ~May/June | Broadest program; absorbs systems breadth |
The practical use: a project that misses the January bar honestly should aim at IROS or CoRL rather than submit thin — RSS's selectivity makes weak submissions expensive in reviewer goodwill.
Backward plan to a late-January deadline
| Weeks out | Milestone for a claim-plus-hardware paper |
|---|---|
| 12+ | Scientific claim fixed in one sentence; evidence plan sized to it |
| 10 | Hardware trial campaign running; failure attribution logged from day one |
| 6 | Ablations that isolate the mechanism complete |
| 4 | Full draft; supplement storyboard; internal red-team read |
| 2 | Anonymity sweep of PDF and media; OpenReview metadata entered |
| 1 | Abstract registered; buffer for robot downtime already spent |
| 0 | Paper in; supplement due one week later — do not design it that week, only pack it |
The one-week paper→supplement gap (2026: Jan 30 → Feb 6) is packing time, not filming time; footage shot after the deadline cannot support claims already frozen in the PDF.
Conference-week execution (the stage that is live right now)
For teams presenting at the current edition, the final week has its own checklist:
- Confirm the talk slot, format, and timing against the official program page; a single-track schedule has no parallel-session slack for overruns.
- Load footage locally; conference-venue networks are not a playback plan.
- Push the public artifact release live before the talk — the single-track
audience is the largest referral event the repository will ever get
(
rss-artifact-evaluation). - Prepare the poster to carry the evidence detail (trial counts, failure distribution) that the talk compresses away.
- Assign one author to note every hallway objection; those are free previews of the journal-extension reviews.
RSS 2027 monitoring plan
Nothing about 2027 was posted at check time. Watch these, in this order, starting early autumn 2026:
- https://roboticsconference.org/ — the banner rebinds to the new edition.
- The RSS Foundation calendar page (roboticsfoundation.org).
- The OpenReview venue namespace for a
RSS/2027group appearing. - The CFP page for the new deadline cascade and any format change — the 8-page ceiling and the two-stage rebuttal are both cycle policies, not fixtures.
Stage-specific traps
- February-March silence: first reviews are not public-scheduled; do not plan team availability assuming a known release date (待核实 each cycle).
- The rebuttal is conditional: only papers above a first-round threshold are
invited to respond. Plan an April window in calendars without assuming it will be
used (
rss-author-response). - April 27 → July is short: visa lead times for the host country can exceed the decision-to-conference gap; start paperwork at submission time for likely-accept projects.
- No standing editors: the Program Chair and Area Chairs rotate per edition (2026 PC chair: Matei Ciocarlie, Columbia — verified 2026-07-08); never carry a name or a policy across cycles.
Ownership map for a multi-person campaign
Robotics submissions fail at handoffs; name owners early:
| Workstream | Single owner for |
|---|---|
| Claim custody | The one-sentence claim; vetoes scope drift in any section |
| Trial campaign | Protocol document, ledger integrity, daily campaign log |
| Media | Footage banking from every session; the supplement cut |
| Anonymity | The sweep across PDF, video, archive, and OpenReview fields |
| Deadline mechanics | AoE conversions, form fields, upload confirmations |
Footage banking deserves emphasis: clips must be captured during the campaign, because the supplement freezes one week after the paper and reshoots after the paper deadline cannot support frozen claims.
Output format
[Cycle position] planning 2027 / drafting / submitted / rebuttal window / accepted / conference week
[Next hard date] <date + source URL, or 待核实>
[Critical path] <three tasks gating the next stage>
[Fallback venue] IROS / CoRL / ICRA + trigger condition
[Calendar risks] <robot downtime / visa / footage / rebuttal availability>
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.