Rss review process
Skill brycewang-stanford/Awesome-Journal-Skills/RSS-Skills/skills/rss-review-process
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill rss-review-processAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when explaining or strategizing around RSS (Robotics: Science and Systems) peer review — the double-blind OpenReview pipeline, the two-stage design where only above-threshold papers earn a one-page rebuttal, the Area Chair meeting that sets decisions, and what single-track selectivity does to reviewer expectations.
SKILL.md
5.6 KB, ~1.2k tokens by cl100k_base, as published. Nobody here has run it
RSS Review Process
Model how an RSS decision actually gets made. The mechanics below are the verified 2026 design (roboticsconference.org/reviewps/, checked 2026-07-08); the two-stage structure itself is cycle policy, so confirm it survives before relying on it.
The 2026 pipeline
OpenReview submission (double-blind)
│
first review round
│
threshold gate ── below ──▶ reject (no rebuttal opportunity)
│ above
invited one-page rebuttal (due 2026-04-03 AoE)
│
Area Chair reads rebuttal
│ (forwards to reviewers only if extra feedback is needed)
Area Chair meeting ──▶ decisions (2026-04-27 AoE)
Two properties distinguish this from ML-conference discussion phases:
- The rebuttal is earned, not granted. Papers below the first-round threshold are
decided without author input. Consequence: the submission itself must pre-answer
foreseeable objections; there may be no second chance (
rss-writing-style). - The audience of the rebuttal is the AC. Reviewers may never see it. Write for
the person running the meeting, not for a back-and-forth thread
(
rss-author-response).
What single-track selectivity does to reviewing
Every accepted paper takes a slot in front of the whole conference, so the operative question in the AC meeting is closer to "must the field hear this?" than "is this sound?" Soundness is necessary, not sufficient. Practical consequences:
| Review dynamic | Cause | Author counter-move |
|---|---|---|
| High bar for "so what" | One program, finite slots | Lead with the claim's consequence for other subfields |
| Deep methodological reads | Specialized, smaller reviewer pool | State assumptions and protocol precisely; vagueness gets caught |
| Skepticism toward demo-style evidence | Science-first venue identity | Attribute failures, isolate mechanisms, report all trials |
| Low tolerance for padding | 8-page ceiling framed as ceiling | Cut aggressively; length is not a proxy for rigor here |
Reading a borderline packet
- Separate correctness objections (a flaw in the claim or protocol) from scope objections (the claim is narrower than sold) from significance doubts (sound but not slot-worthy). Only the first two are rebuttal-addressable with existing evidence; the third is won or lost in the submission's framing.
- A lone enthusiastic review does not carry a paper through an AC meeting; a lone unanswered correctness objection can sink one. Triage accordingly.
- Decisions emerge from a synchronous meeting, so the AC's summary understanding is the decision artifact. Everything you write should compress well into two sentences an AC might say aloud.
Timeline anatomy (2026 verified dates)
| Date (AoE) | Event | Author-side implication |
|---|---|---|
| Jan 30 | Papers in | Last word for below-threshold papers |
| Feb-Mar | First round (release date 待核实) | Do not plan around an assumed date |
| Apr 3 | Invited rebuttals due | Short notice — pre-draft objection answers |
| Apr 3-27 | AC digestion + meeting | No author-visible activity; silence is normal |
| Apr 27 | Decisions | ~11 weeks before the July conference |
The compressed April-to-July runway is a distinctive RSS pressure: camera-ready, travel authorization, and artifact release all share eleven weeks.
Calibrating expectations by venue contrast
- Unlike venues with universal author-response phases, RSS's threshold gate means a silent April is itself information — but never certain information, since invitation lists are confidential.
- Unlike rolling-review journals, there is no revise-and-resubmit: the meeting
outputs accept or reject, and the improvement loop runs through the next venue
slot (
rss-workflow). - Scores, forms, and thresholds are internal; public acceptance statistics were not verified for 2026 (待核实) — do not quote community folklore rates as fact.
Confidentiality and conduct
- Reviewer identities, scores, and thresholds are confidential; do not attempt identification or out-of-band contact.
- Notification wording in 2026 covered "paper and demo acceptance" even though the CFP had no demo-paper category — treat demo mechanics as 待核实 rather than inferring a track.
Who sits in the reviewer pool
- The pool spans planning, control, perception, learning, and mechanism design; topic matching at a smaller venue is tight, so expect at least one reviewer who has personally run experiments like yours — protocol hand-waving gets caught.
- Because the audience is the whole field, at least one review often comes from an adjacent subfield; jargon-dense writing loses exactly the vote the single-track format makes decisive.
- Area Chairs are established researchers appointed per edition; the AC's synthesis carries the meeting, which is why every skill in this pack optimizes for the AC-compressible summary.
Output format
[Stage] under review / rebuttal invited / no rebuttal / AC meeting pending / decided
[Objection triage] correctness: <...> | scope: <...> | significance: <...>
[AC-compressible summary] <two sentences the AC could say in the meeting>
[Rebuttal leverage] high / low / none (below threshold)
[Next move] <one action>