agentsclimarketplace

Pods workflow

Skill brycewang-stanford/Awesome-Journal-Skills/PODS-Skills/skills/pods-workflow

Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill pods-workflow

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

Use when planning an ACM PODS project timeline across its multiple submission cycles per year, from venue fit through the EasyChair abstract-then-paper deadlines, the 48-hour rebuttal, the accept/reject/revision decision and shepherded revision round, PACMMOD-track publication, the arXiv full version, and presentation — with backward-planning offsets for a theory paper and honest handling of cycle choice.

SKILL.md

5.4 KB, ~1.2k tokens by cl100k_base, as published. Nobody here has run it

PODS Workflow

Use this as the project-management skill for a PODS submission. Replace every date with the current official timetable and work backwards from the abstract deadline, which precedes the full-paper deadline by about a week in each cycle. PODS runs multiple submission cycles per year and every paper may hit a revision round with a shepherd, so plan for a two-round-per-cycle process, not a single accept/reject.

PODS is a symposium whose papers are journal articles in the PACMMOD PODS track: it has no standing editor-in-chief and no APC in the systems sense. Rotating leadership is the per-edition PODS PC Chair (PODS 2026: Ke Yi, HKUST, verified 2026-07-09) appointed with ACM SIGMOD and SIGACT; the cost model is registration and at least one author presents. Chairs rotate yearly — re-check the organization page rather than carrying a name forward.

Choosing a cycle

PODS's multi-cycle calendar is a planning lever, not just a constraint. As of 2026-07-09, PODS 2026 (Bengaluru) has already met, so the live target is PODS 2027 (Huntington Beach): Cycle 1 closed 30 May 2026, and Cycle 2 (abstract+COI 10 Oct 2026, paper 17 Oct 2026) is the next live deadline.

  • Submit when the proof is complete, not when the cycle is nearest. A rushed, gap-filled proof draws a reject that burns the cycle; PODS's next cycle is only a season away, so the cost of waiting one cycle is far smaller than at a once-a-year venue.
  • A reject cannot be immediately re-submitted. Recent SIGMOD/PODS policy bars resubmitting rejected research-track work for roughly a year of cycles — so a premature submission can cost more than one cycle. Verify the exact wording before relying on the next cycle as a safety net.

Milestones

  • Venue fit: confirm PODS over SIGMOD/VLDB/ICDE and over ICDT (pods-topic-selection).
  • Result lock: fix the model, the theorem statements, and complete every proof; the appendix is incorporated at submission, so proofs cannot be deferred to a later "full version."
  • Abstract + COI: register the real title, abstract, authors, and declared conflicts of interest by the earlier abstract deadline of the chosen cycle.
  • Submission: upload the anonymized acmsmall PDF (body + references + appendix) on EasyChair by the full-paper deadline.
  • Rebuttal: use the ~48-hour window to correct factual misreadings only.
  • Decision: accept / reject / revision (minor or major).
  • Revision (if invited): implement the revision items within the given window; a shepherd judges whether the revision is satisfactory.
  • Acceptance: prepare the PACMMOD camera-ready, post the full version on arXiv, register, and present at PODS.

Backward plan from the paper deadline

Weeks out (heuristic)Theory-paper milestone
10+Model and problem fixed; main theorem statements conjectured
8Core proofs complete; lower-bound/upper-bound gap closed or scoped honestly
6Full draft in acmsmall; every stated theorem has a complete proof in body or appendix
4Appendix assembled and incorporated; anonymity sweep on paper and appendix
3Internal read by a theory colleague who checks a proof end to end
2Tighten definitions, related-work delta, page budget (15 pp excl. refs)
1Final proof-read of the hardest proof; COI list prepared
0Abstract by its earlier cutoff, then paper + appendix on EasyChair

These offsets are planning heuristics only — anchor every one to the current Important Dates page, never to a previous cycle's calendar.

Failure modes by stage

  • A proof still open at week 6 forces a "sketch in the appendix" that the reviewers will not accept — the classic PODS reject in the making. Close the gap or scope the claim.
  • Leaving the appendix to the final week produces incomplete proofs and identity leaks under double-anonymity (a named system, an acknowledgement).
  • Skipping the colleague read forfeits the one chance to hear "your Lemma 4 is circular" from a friend instead of a reviewer.
  • Treating a revision as automatic and under-budgeting the revision window turns a winnable minor revision into a reject when the shepherd is unsatisfied.

Coordination notes

  • Assign one author to own the proof appendix and its anonymity, and another to own the EasyChair fields and COI list; shared ownership is how both slip.
  • Archive the exact submitted PDF and appendix — the revision round and the arXiv full version must correspond to them precisely.

Output format

[Current stage] idea / proofs / writing / abstract-registered / submitted / revision / accepted
[Chosen cycle] cycle 1 / cycle 2, with the next official deadline (date + source, or unknown)
[Critical path] <three tasks that determine readiness — usually a proof gap and the appendix>
[Risk register] <open proof / page budget / anonymity / revision window / arXiv full version>
[Owner map] <task -> person or role>

What ships with it

Read from the repository

Just SKILL.md. No reference files, no scripts.

Keep looking

Skills are one crate of 327,132. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.