Nsdi workflow

Skill brycewang-stanford/Awesome-Journal-Skills/NSDI-Skills/skills/nsdi-workflow

Use when planning an NSDI campaign across the spring and fall deadlines — sequencing abstract and paper gates, notification waits, one-shot revision windows, artifact evaluation, and the May symposium — so a networked-systems project always knows which of the two yearly gates it is really building toward.From its SKILL.md

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill nsdi-workflow

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

SKILL.md

6.2 KB, ~1.5k tokens by cl100k_base, as published. Nobody here has run it

NSDI Workflow

NSDI is a calendar problem disguised as a conference. One edition, two submission gates, two decision cohorts, and a revision mechanism that spans deadlines — a team that plans "for NSDI" without naming the gate usually discovers it planned for neither. Dates below are the NSDI '27 cycle as rendered on 2026-07-08; treat them as this cycle's snapshot and re-pull the HotCRP /deadlines pages before acting.

The '27 clock

GateDate (11:59 pm US EDT)Cohort
Spring abstractsApril 16, 2026spring
Spring full papersApril 23, 2026spring
Spring notificationJuly 23, 2026spring
Fall abstractsSeptember 10, 2026fall
Fall full papersSeptember 17, 2026fall
Fall notificationDecember 8, 2026fall
SymposiumMay 11-13, 2027, Providence, RIboth

Where "today" (2026-07-08) sits: spring authors are two weeks from notification; a fresh submission has nine weeks to the fall abstract gate. Camera-ready dates and the '27 artifact schedule were not yet rendered — 待核实, watch the conference page.

One project, four legal paths through the cycle

Path A  fall '26 submit -> accept (Dec 8) -> final paper + AE -> present May '27
Path B  fall '26 submit -> one-shot revision -> resubmit spring '27 (next edition)
Path C  fall '26 submit -> reject -> BARRED from spring '27; rework for fall '27
Path D  spring '26 one-shot revision (notif Jul 23) -> revise -> fall '26 resubmit

Path C is the one teams forget: a plain rejection carries a one-deadline ban, so the cheapest-looking option — "just submit and see" — silently spends two deadlines, not one. Build the decision into the plan: submit only when the evidence would survive review, otherwise hold for the next gate and use the time on the testbed.

Working backward from a gate

A fall-2026 target, walked backward:

  • T-9 to T-6 weeks: freeze the design; the evaluation plan (workloads, baselines, scale points) written down and reviewed as if it were the paper (nsdi-experiments). Trace collection and testbed reservations start now — cluster time is the resource that cannot be compressed in deadline week.
  • T-6 to T-3: experiments run continuously with provenance capture (nsdi-reproducibility); the paper skeleton fills section by section (nsdi-writing-style); related-work sweep across both NSDI cohort lists of the current edition (nsdi-related-work).
  • T-2: full internal read against the 12-page budget; appendix triage (nsdi-supplementary).
  • T-1 week (Sept 10): abstract, authors, track, and conflicts registered on the fall HotCRP site. The abstract gate is a hard prerequisite, not a formality.
  • T-0 (Sept 17): final PDF through the submission audit (nsdi-submission), uploaded and marked complete with hours to spare.

The waits, and what to do inside them

NSDI's review silences are long (spring: April to late July; fall: September to early December). Productive uses that pay off regardless of outcome:

  • Harden the artifact toward badge evaluation — the accept-case deliverable (nsdi-artifact-evaluation), and the Community Award requires public code/data by the final-papers deadline.
  • Keep the testbed alive and re-runnable; a one-shot revision letter often demands new experiments on a 3-4 month fuse, and a decommissioned cluster turns a feasible revision into a forfeit.
  • Draft the extension or the next paper; do not submit the same work elsewhere — concurrent submission violates USENIX policy.

Revision-window management (path B/D)

A one-shot revision arrives with a reviewer-authored list of required issues and a deadline implied by the next submission gate. Run it as a mini-project:

  1. Within a week: map every required issue to an owner and a cost (new experiment, new analysis, rewrite).
  2. Reserve infrastructure immediately for any issue needing measurements.
  3. Maintain the change-highlighted PDF and the change-summary memo as you go — both are mandatory auxiliary material at resubmission (nsdi-author-response).
  4. Freeze two weeks before the gate; a revision that misses its window or dodges an issue is rejected with no further revision option.

Choosing between the gates when both are open

Early in a cycle, spring-vs-fall is a real decision, not a default:

  • Spring favors projects whose evaluation is already running: an accept yields ten months of artifact and presentation runway, and even a one-shot revision recycles into the same edition's fall gate (path D) — the gentlest failure mode NSDI offers.
  • Fall favors projects still building: five more months of testbed time, at the cost of a compressed post-accept pipeline and a revision that lands in the next edition.
  • Never split one paper across both by submitting a weak spring version as a placeholder — the rejection ban (path C) converts that hedge into exclusion from the very fall gate the team was counting on.

Standing risks with named owners

  • Gate confusion — someone plans for "the NSDI deadline" without saying which. Owner: project lead; fix: every milestone names spring/fall + year.
  • Time-zone drift — '27 uses US EDT where '26 used PDT; a reused conversion table is an hour-scale landmine. Owner: submitter of record.
  • Cap collisions — eight submissions per author per edition across both deadlines; large groups reconcile author lists before each abstract gate. Owner: most-senior common author.
  • Infrastructure decay during waits. Owner: artifact lead.

Output format

[Target gate] spring / fall + year (papers due <date>)
[Today's position] weeks to next gate; cohort status of any pending submission
[Backward plan] milestone -> week -> owner
[Ban check] any cohort-ban or revision window constraining this plan?
[Wait-time tasks] artifact / testbed / next-paper assignments
[Top schedule risk] <one item + mitigation>