agentsclimarketplace

Nsdi review process

Skill brycewang-stanford/Awesome-Journal-Skills/NSDI-Skills/skills/nsdi-review-process

Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill nsdi-review-process

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

Use when interpreting where an NSDI submission stands — the per-deadline PC pipeline, the three-way outcome space of accept, one-shot revision, and reject, the cross-deadline resubmission ban, reviewer continuity across revisions, and what each decision letter actually commits the authors to.

SKILL.md

6.1 KB, ~1.3k tokens by cl100k_base, as published. Nobody here has run it

NSDI Review Process

NSDI's review machinery differs from single-deadline conferences in one structural way: decisions are moves in a multi-deadline game, not endpoints. Reading a decision letter correctly requires knowing which moves it opens and which it closes. Mechanics below are the NSDI '27 CFP and the NSDI '26 multiple-deadlines page as rendered on 2026-07-08.

Pipeline shape

Each deadline (spring, fall) runs its own double-blind PC review on its own HotCRP site, producing its own decision cohort — NSDI even publishes per-cohort accepted-paper lists before the symposium. Within a cohort:

  • Reviews are written against the paper as submitted; the rendered '27 CFP describes no author-response phase between reviews and decisions (absence 待核实 — check the current cycle's pages before relying on it). Plan as if the submission must argue for itself (nsdi-author-response).
  • Review loads are bounded upstream by the eight-submissions-per-author cap, which exists to protect PC bandwidth — expect enforcement, not flexibility.
  • Notifications land on published dates: July 23, 2026 for '27 spring; December 8, 2026 for '27 fall.

The three-way outcome space

DecisionWhat it meansWhat it opens / closes
Acceptinto the cohort's programfinal paper, artifact evaluation, presenter duties
One-shot revisionconditional path: reviewers issue a list of required issuesresubmit at a subsequent deadline (possibly next year's NSDI); same reviewers where possible; one attempt
Rejectout, with a ban attachedcannot enter the next deadline; spring reject skips same-edition fall, fall reject skips next edition's spring

The one-shot revision is neither a rebuttal nor journal-style R&R-until-done. Its grammar: the reviewers' issue list is exhaustive and binding; the revision is judged on whether those issues are fixed; a revision that dodges them is rejected without another revision option. Institutional continuity is built in — the same reviewers re-review where possible, and PC members who issue one-shot revisions at a fall deadline are required to serve as external reviewers the following year, so the issue list is written by people expecting to check it.

What reviewers reward and punish

Reading NSDI reviews (and pre-empting them) is easier with the venue's evaluative axes explicit:

  • Design contribution to networked systems or the stack — the scope clause functions as review criterion; "solid work, wrong venue" is a real NSDI outcome (nsdi-topic-selection).
  • Practical evaluation — trace realism, incumbent baselines, tail visibility (nsdi-experiments).
  • Honesty about limits — named failure regimes read as strength.
  • Track-contract fulfillment — operational papers judged on depth of deployed experience; frontiers papers on boldness and framing rather than completeness.

Decoding common letters

"One-shot revision. Required: (1) compare against <deployed system>;
 (2) evaluate under churn; (3) clarify lease-expiry semantics."
   -> A funded offer. Cost it (~2 machine-months + rewrite), reserve the
      testbed now, target the named next deadline. Success odds are good
      *because* the same reviewers check their own list.

"Reject. The contribution is an application of known techniques; the
 networking stack is unchanged."
   -> Scope verdict, not effort verdict. Re-route (SIGCOMM? OSDI?) or
      re-center the design contribution. Ban: skip one NSDI deadline.

"Reject. Evaluation limited to microbenchmarks on a two-node setup."
   -> Evidence-rung verdict. The ban window is exactly the time to climb
      a rung (trace replay, scale-out) before the after-next deadline.

Ban arithmetic, worked

A paper rejected at fall '26 (notified December 9, 2025 — the '26-cycle dates) could not enter spring '27 (April 2026) and became eligible again at fall '27 (September 2026). Generalize: a plain rejection costs one deadline ≈ 5 months of eligibility, which is precisely why nsdi-workflow treats speculative submissions as spending a real option, and why the strongest response to a borderline draft is often holding it one gate.

Signals to mine from the reviews themselves

Whatever the outcome, NSDI reviews carry venue-calibrated information worth extracting systematically:

  • Which track bar was applied — reviews that fault a research-track paper for missing deployment experience (or vice versa) reveal a track mismatch to fix before any resubmission.
  • Which baseline the community considers canonical — a named "why not X?" defines the comparison the next version cannot skip.
  • Repeated confusion across reviewers — two reviewers misreading the same mechanism marks a writing defect, not two reading defects (nsdi-writing-style).
  • The evidence rung the scores imply — enthusiasm plus low confidence often means the idea landed but the evaluation did not reach the rung the claim needs (nsdi-experiments).

Confidentiality and conduct

Reviews and PC deliberations are confidential; submissions are read under double-blind rules with declared conflicts recused via HotCRP. Do not contact PC members about a pending paper; process questions go to the program co-chairs (named on the current conference page; the '27 pair 待核实). Decisions are not relitigated by email — the sanctioned channel for disagreement is the revision or the next eligible submission.

Output format

[Cohort] spring/fall + year; notification date; days remaining
[Outcome] accept / one-shot revision / reject
[If revision] issue list -> cost -> feasible target deadline
[If reject] ban window (dates); scope vs evidence diagnosis; re-route call
[Reviewer continuity] same-reviewer expectations affecting strategy
[Next action] single highest-leverage step, dated

Keep looking

Skills are one crate of 328,083. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.