agentsclimarketplace

Micro review process

Skill brycewang-stanford/Awesome-Journal-Skills/MICRO-Skills/skills/micro-review-process

Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill micro-review-process

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

Use when reasoning about how a MICRO submission is judged — the double-blind HotCRP pipeline from the April deadline through the June rebuttal/revision window to the early-July notification, what reviewers score in a microarchitecture paper, the professional-conduct rules, and how the new Industry Track review differs.

SKILL.md

6.5 KB, ~1.4k tokens by cl100k_base, as published. Nobody here has run it

MICRO Review Process

Model of the pipeline a MICRO submission enters, anchored to the 2026 (59th) cycle as verified 2026-07-08. Committee composition and internal mechanics vary by year and are only partly public — items marked 待核实 must be reconfirmed on microarch.org/micro59/ before being repeated as fact.

2026 cycle timeline (verified)

GateDateNotes
Abstract registrationMarch 31, 2026, 11:59 PM EDTHard gate for paper upload
Full paperApril 7, 2026, 11:59 PM EDTHotCRP: micro2026.hotcrp.com
Rebuttal / revision windowJune 3–17, 2026Two weeks — unusually long
NotificationJuly 7, 2026
Camera-readySeptember 11, 2026
SymposiumOct 31 – Nov 4, 2026, Athens

The eight-week gap between upload and rebuttal is when reviews are written; the three weeks after the window close is discussion and the decision meeting.

What the process is known to enforce

  • Double-blind, end to end. Anonymity obligations persist through the rebuttal/revision window; artifact links stay anonymized the whole time.
  • Format policing with teeth. Submissions are inspected visually and automatically; violations can reject a paper even after the HotCRP checker passed it (see micro-submission).
  • A professional-conduct clause covering both directions. The 2026 guidelines state that abusive or inappropriate language in reviews, comments, or rebuttals can be grounds for dismissing reviewers, rejecting papers, and reporting to ACM and IEEE. Anger in a rebuttal is not just ineffective at MICRO — it is enumerated as a rejection ground.
  • A separate Industry Track review. The inaugural 2026 track advertises a review process tailored to production work — evidence standards that accommodate proprietary constraints. Main-track novelty framing and industry-track deployment framing are different games; know which one your paper entered.

What reviewers weigh in a microarchitecture paper

Composite of the community's public reviewing norms (not a quoted rubric — 待核实 against any published review form for the current cycle):

  1. Mechanism novelty and clarity — is there a new hardware idea, stated at implementable precision?
  2. Methodology credibility — simulator, baseline strength, workloads, sampling; the fastest score-killer in this community.
  3. Evidence-claim match — simulation claims sized to simulation fidelity (micro-experiments instrument ladder).
  4. Cost honesty — storage/area/power/latency accounting present and plausible.
  5. Significance — does the headroom captured justify silicon change; would anyone build it?

A practical corollary: reviewer expertise at MICRO skews toward methodology forensics. Expect at least one review that reconstructs your simulator config from the paper and interrogates the discrepancies.

Reading the outcome space

MICRO 2026's public timeline names one rebuttal/revision window and one notification date; whether the cycle offered conditional accepts or shepherding is 待核实. Plan against the simple model:

accept    -> camera-ready sprint (Sept 11) + artifact evaluation decision
reject    -> triage: fixable-methodology vs wrong-venue vs insufficient-headroom
             next slots: ASPLOS Sept 9 '26 · ISCA Nov 17 '26 · HPCA July '27 · MICRO Apr '27
resubmit rule: fix what reviews falsified, re-verify every date on live pages

Keep the reviews regardless of outcome — architecture PCs overlap heavily across MICRO/ISCA/HPCA/ASPLOS, and a resubmission that ignores prior reviews may meet its own reviewer again.

Anatomy of a typical architecture review

Expect each review to contain, in some order: a summary paragraph (check it — a wrong summary means the paper failed to communicate, and the rebuttal's first job is a polite correction), a strengths list, a weaknesses list where methodology items dominate, and detailed questions. Useful triage signals:

  • A review whose weaknesses are all questions is winnable in rebuttal; a review whose weaknesses are all assertions needs numbers to move.
  • The most senior-sounding review is not automatically the decision driver; the review with the most specific methodology engagement usually is.
  • Uniform mid-scores with shallow text often mean the paper landed outside every reviewer's exact expertise — a topic-checkbox lesson for the resubmission.

Score scales, reviewer counts, and whether an online discussion precedes the PC meeting are internal mechanics that vary by year: 待核实, do not assume.

Leverage points for authors

  • Before submission: topic checkboxes in HotCRP (steer toward mechanism expertise), abstract quality (bidding happens on it), format cleanliness.
  • During review: nothing. Do not update linked repos in identifying ways; the submission is frozen.
  • Rebuttal window: the only mid-process input — see micro-author-response for how to spend two weeks well.
  • After notification: AE participation (badges strengthen the published record), Top Picks nomination season (IEEE Micro selects from the year's architecture papers).

Calibrating expectations

Flagship-architecture acceptance rates historically sit in the high-teens to low-twenties percent (exact per-year figures 待核实 from PC-chair reports or the proceedings front matter — do not quote a number without a source). The planning consequence is not pessimism but lattice thinking: a strong paper's expected path to publication is one to two cycles across the four venues, which is why micro-workflow treats every submission as having a plan B with a date on it, and why reviews — even from a rejection — are the highest-value artifact the process returns.

Output format

[Stage] pre-submission / under review / rebuttal window / post-notification
[Days to next gate] <N days to date, per verified timeline>
[Reviewer-lens self-score] mechanism / methodology / evidence-match / cost / significance: 1-5 each
[Conduct check] rebuttal tone professional: yes / revise
[Outcome plan] accept path + reject path both written: yes / no
[待核实 before quoting] <items to reconfirm on microarch.org>

Keep looking

Skills are one crate of 328,083. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.