agentsclimarketplace

Jar rebuttal

Skill brycewang-stanford/Awesome-Journal-Skills/Journal-of-Accounting-Research-Skills/skills/jar-rebuttal

Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill jar-rebuttal

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

Use after a Journal of Accounting Research (JAR) revise-and-resubmit to plan the revision and draft the point-by-point response — prioritizing the Senior Editor's first-order concerns (identification, the channel, measurement) and updating the required data-and-code package. Plans and drafts the response; it does not run the new analyses from scratch (jar-data-analysis) or re-run the submission preflight (jar-submission).

SKILL.md

4.6 KB, as published. Nobody here has run it

R&R Revision & Response (jar-rebuttal)

When to trigger

  • You received a JAR revise-and-resubmit and must plan the revision
  • You need to draft the point-by-point response to the Senior Editor and referees
  • Referees disagree and you must triage which concerns are binding
  • New analyses change tables and the data-and-code package needs updating

Sequence: revise first, then write the response

Do the analytical work before drafting the letter. A JAR R&R turns on whether you have actually strengthened identification, the economic channel, and measurement — not on rhetorical skill. The Senior Editor's letter is the binding map: it tells you which referee points are first-order (and must be resolved) versus second-order (where a reasoned reply may suffice). Address the editor's priorities first.

Triage the referee points

  • First-order (must resolve): endogeneity/identification threats, an unidentified channel, fragile or invalid construct measurement, sample-construction concerns. These usually require new analyses (a cleaner setting, additional diagnostics, alternative proxies, falsification tests).
  • Second-order (resolve or reason): additional robustness, exposition, framing, extra citations. Implement where cheap; otherwise explain clearly.
  • Conflicting referees: do not whipsaw the paper. State the trade-off and follow the Senior Editor's steer; note where you sided with one referee and why.

Draft the response letter

  • One point, one response. Quote each comment, then give your response and point to the exact change (section, table number, new analysis).
  • Show the new evidence. For identification/measurement concerns, present the new table or diagnostic in the letter (or a response appendix), not just a promise.
  • Be candid about limits. Where a concern cannot be fully resolved, say what the design can and cannot identify and add the scope condition to the paper.
  • Respectful and specific. Thank referees, concede valid points, and defend with evidence — never dismiss.

Update the deliverables JAR requires

Re-run the data-and-code package so it regenerates all revised tables and figures from raw extracts; update the README for new screens, vintages, and analyses. Keep the manuscript double-anonymized and consistent (variable names, hypothesis labels, table numbers) after the revision. If this is a Registered Report Stage 2, confirm the analyses match the pre-approved Stage 1 protocol and explain any pre-specified deviations.

Checklist

  • Revision analyses completed before drafting the response
  • Editor's first-order concerns identified and resolved
  • Each referee comment quoted with a specific, change-anchored response
  • New identification/measurement evidence shown, not promised
  • Conflicting referees reconciled per the editor's steer
  • Data-and-code package regenerates all revised exhibits; README updated
  • Manuscript still anonymized and internally consistent
  • (If RR Stage 2) analyses match the approved Stage 1 protocol

Anti-patterns

  • Writing the letter before doing the work.
  • Treating all referees equally instead of following the editor's priorities.
  • Promising robustness instead of showing it.
  • Cosmetic responses to first-order identification concerns.
  • Letting the posted code drift out of sync with the revised tables.

Output format

【Editor first-order asks】[...] — resolved by ...
【Referee triage】R1/R2/R3 first-order vs second-order
【New analyses done】identification / measurement / falsification ...
【Response letter】per-point, change-anchored draft status
【Conflicts reconciled】editor's steer followed where ...
【Data-and-code】package regenerates revised exhibits? updated?
【Next step】resubmit via Research Exchange (jar-submission for preflight)

Resources

Keep looking

Skills are one crate of 328,083. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.