agentsclimarketplace

Iros workflow

Skill brycewang-stanford/Awesome-Journal-Skills/IROS-Skills/skills/iros-workflow

Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill iros-workflow

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

Use when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar.

SKILL.md

4.3 KB, 918 tokens by cl100k_base, as published. Nobody here has run it

IROS Workflow

Use this as the project-management skill for an IROS submission. Replace every date with the current official timetable and work backward from PaperPlaza cutoffs.

IROS is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge. It is co-sponsored by IEEE RAS and the Robotics Society of Japan (RSJ) — hence "IEEE/RSJ" — and the organizing committee rotates yearly between regions, so re-check the current CFP and committee page rather than carrying names or rules forward. The cost model is registration plus any per-page charge, and proceedings go to IEEE Xplore.

The fall-venue rhythm (2026 shape)

IROS is the fall IEEE-RAS mega-venue, the seasonal counterpart to ICRA's spring cycle. The 2026 edition ran a spring submission into an autumn conference:

  • Paper deadline in early spring (2026: March 2).
  • Video attachment a few days later (2026: March 5) — a distinct cutoff, not tied to the paper.
  • A long summer review silence, then notification in mid-June (2026: June 16).
  • Camera-ready in July (2026: July 10), then the conference in late September/October (2026: Sept 27 - Oct 1, Pittsburgh).

Knowing you are on the fall calendar changes routing: a project that misses IROS's spring deadline has CoRL and the next ICRA as nearer alternatives than waiting a full IROS year.

Milestones

  • Venue fit: confirm the contribution is an integrated intelligent system with credible robot evidence.
  • Evidence lock: freeze the platform, task distribution, trial protocol, baselines, and the video plan.
  • Paper deadline: upload the anonymous PDF (references counted in the page budget) and PaperPlaza fields.
  • Video deadline: upload the ≤ 60 s / ≤ 10 MB attachment by its own cutoff.
  • Review silence: nothing to do but keep the robot and logs intact for camera-ready.
  • Notification: triage reviews; there is traditionally no rebuttal, so plan camera-ready edits instead.
  • Camera-ready: de-anonymize, integrate meta-review asks, file the IEEE copyright form, register.
  • Presentation: at least one author presents in person; prepare the talk and any live/updated video.

Backward plan from the paper deadline

Weeks out (heuristic)Real-robot systems milestone
10+Platform frozen; task distribution and success criterion defined
8Baselines implemented on the same hardware for a fair comparison
6Main trials run, resets logged, failures categorized
4Sim-to-real study complete; the gap is a number, not a hope
3Full draft in IEEE two-column format; references budgeted as content
2Video footage banked from real sessions; rough 60 s cut assembled
1Anonymity sweep across PDF, figures, and video; PaperPlaza PINs collected
0Paper uploaded; video by its separate cutoff

These offsets are planning heuristics only — anchor each to the current official timetable, never to a previous cycle's calendar.

Failure modes by stage

  • Filming on deadline week produces worse footage and worse anonymity than banking clips all along.
  • Treating references as free space overruns the budget, because IROS counts them in.
  • Assuming a rebuttal exists wastes the notification window; IROS traditionally ships reviews with the decision, so the only lever is camera-ready.
  • Letting the robot get reconfigured before camera-ready makes a requested extra trial impossible.

Coordination notes

  • Assign one named owner for the video and one for the anonymity sweep; shared ownership is how both slip.
  • Archive the exact submitted PDF and video, since the camera-ready must trace to the reviewed version.

Output format

[Current stage] idea / experiments / writing / submission / video / review / notified / camera-ready
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <page-budget/anonymity/robot-evidence/video/transfer>
[Owner map] <task -> person or role>

What ships with it

Read from the repository

Just SKILL.md. No reference files, no scripts.

Keep looking

Skills are one crate of 328,039. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.