agentsclimarketplace

Ipsn workflow

Skill brycewang-stanford/Awesome-Journal-Skills/IPSN-Skills/skills/ipsn-workflow

Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill ipsn-workflow

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

Use when planning an IPSN-lineage project timeline from track/venue selection through the CPS-IoT Week deadline, double-blind submission, deployment and hardware logistics, rebuttal, the Best Research Artifact Award, and the dual ACM/IEEE camera-ready — with honest handling of the fact that IPSN merged into SenSys.

SKILL.md

5.1 KB, ~1.1k tokens by cl100k_base, as published. Nobody here has run it

IPSN Workflow

Use this as the project-management skill for an IPSN-lineage submission. Replace every date with the current official timetable and work backwards from the successor (SenSys) deadline at CPS-IoT Week. The single biggest planning fact: IPSN no longer runs standalone — it merged into SenSys (Embedded AI and Sensing Systems), so plan against the current SenSys call, keeping the IP-vs-SPOTS instinct.

IPSN had no standing editor-in-chief and no APC; rotating leadership was the per-edition General Chair(s) and per-track (IP / SPOTS) Program Chairs under CPS-IoT Week, ACM SIGBED, and IEEE. The cost model is registration; at least one author presents. Re-check the successor's organizing-committee page rather than carrying a name forward.

Milestones

  • Venue + track fit: confirm the IPSN lineage over MobiSys/MobiCom/INFOCOM/RTAS, and pick IP vs SPOTS (ipsn-topic-selection).
  • Evidence lock: freeze the testbed, ground-truth reference, baselines, energy/latency measurement setup, and the dataset/firmware artifact contents.
  • Deployment window (if applicable): schedule field time early — a bridge, building, or wildlife deployment cannot be redone in the final week and is weather/permit-bound.
  • Registration/abstract: submit real title, abstract, authors, track, and conflicts by the earlier cutoff.
  • Submission: upload the anonymized PDF and dataset/firmware link on HotCRP.
  • Rebuttal (if offered): correct misreadings and supply any measured number a reviewer flagged.
  • Decision: archive reviews, rebuttal, and every submitted version.
  • Acceptance: prepare the dual ACM/IEEE camera-ready, pursue the Best Research Artifact Award and ACM badges, register, and present.

Backward plan from the submission deadline

Weeks out (heuristic)Sensor-systems milestone
12+Track chosen; testbed and ground-truth reference decided; deployment permits/weather scheduled
10Hardware/firmware frozen; power-measurement harness built and validated
8Data collection / deployment complete; raw traces, energy logs, and calibration archived
6Analysis done; accuracy/energy/latency budgets computed; baselines run under equal conditions
4Full draft on the ACM template (two-column, ≤12 pp); artifact assembled and anonymized
3Internal mock review by a sensor-systems reader; check the IP/SPOTS framing holds
2Limits hardened, related-work delta sharpened, page budget met
1Double-blind sweep on PDF, board photos, scope screenshots, testbed names, dataset links
0Register/track-select by the earlier cutoff, then paper + artifact link on HotCRP

These offsets are planning heuristics only — anchor every one to the current CPS-IoT Week / successor Important Dates page.

The merger and calendar reality

  • IPSN's last standalone edition was IPSN 2024 (Hong Kong). The live target is the next SenSys edition at CPS-IoT Week; SenSys 2026 (Saint Malo) had a 13 Nov 2025 paper deadline, so the next edition's deadline is 待核实 — confirm before planning.
  • Deployment lead time is the hidden critical path. Unlike a software paper, a sensing paper's schedule is bounded by physical access (a bridge closure window, a field season, a hardware fabrication run). Missing the deadline often costs a full year and a deployment window.

Failure modes by stage

  • Testbed still moving at week 4 forces last-minute measurement nobody has audited — the classic evidence-realism reject.
  • Leaving anonymization to the final week is how a lab-logo board photo or a named testbed leaks identity under double-blind review.
  • Skipping the mock review forfeits the one chance to hear "your baseline is simulated" or "you never report energy" from a friend instead of a reviewer.
  • Treating the rebuttal as decisive — it is narrow; the measured evidence in the paper carries the argument.
  • Assuming IPSN still runs — check the successor venue before anything else.

Coordination notes

  • Assign one owner for the artifact/dataset/firmware release and another for the double-blind sweep (including hardware imagery); shared ownership is how both slip.
  • Archive the exact submitted PDF, artifact, raw traces, and calibration — the rebuttal and camera-ready must quote them precisely, and the artifact award needs them.

Output format

[Current stage] idea / evidence / deployment / writing / submitted / rebuttal / accepted
[Venue + track] successor (SenSys) edition + IP/SPOTS, with the next deadline (or 待核实)
[Critical path] <three tasks that determine readiness — often deployment-bound>
[Risk register] <page budget / anonymity / evidence-realism / energy accounting / artifact / deployment window>
[Owner map] <task -> person or role>

What ships with it

Read from the repository

Just SKILL.md. No reference files, no scripts.

Keep looking

Skills are one crate of 328,039. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.