Interspeech workflow
Skill brycewang-stanford/Awesome-Journal-Skills/INTERSPEECH-Skills/skills/interspeech-workflow
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill interspeech-workflowAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when managing an INTERSPEECH project across the annual ISCA cycle — backward-planning from the late-February deadline through the update window, spring review, June notification, camera-ready and registration coupling, and the September–October conference, including what to do in the current post-decision phase and 2027 planning.
SKILL.md
6.0 KB, ~1.4k tokens by cl100k_base, as published. Nobody here has run it
INTERSPEECH Workflow
Interspeech runs one cycle per year with an unforgiving rhythm: a winter deadline, a silent spring, a June verdict, and a Northern-autumn conference. This skill is the project-management layer; every date below is the verified 2026 (Sydney) calendar and must be swapped for the live one each cycle.
The 2026 reference clock
| Date (2026) | Event | Owner's job |
|---|---|---|
| 17 Jan | CMT portal opens | metadata drafted, area chosen |
| 25 Feb | Paper deadline | PDF + frozen metadata in |
| 4 Mar | Paper-update close | sanctioned typo/figure pass done |
| ~24 Apr – 1 May | Rebuttal window (reported, 待核实) | response team on call |
| 5 Jun | Notification | triage meeting same week |
| 19 Jun | Camera-ready close | de-anonymized PDF + metadata |
| 15 Jul | Early-bird registration closes | author registration secured |
| 16 Aug | Standard registration closes | stragglers covered |
| 27 Sep – 1 Oct | Conference, Sydney | talk/poster + audio fallback ready |
Where the cycle stands today (2026-07-08)
Mid-cycle, post-decision. Accepted teams: camera-ready is behind you; early-bird
registration closes in one week — that is the live deadline — then presentation
prep, artifact publication (interspeech-camera-ready,
interspeech-artifact-evaluation), and travel/visa for Sydney. Rejected or
unsubmitted teams: the 2027 cycle (São Paulo, 29 Aug – 2 Sep 2027) is the target;
expect a deadline in the same late-winter region but treat the 2027 dates as
unpublished until the São Paulo site posts them.
Backward plan from any Interspeech deadline
Offsets that have survived contact with real teams; anchor them to live dates:
- T−10 weeks: claims frozen; corpus/split/licensing decisions final.
- T−6 weeks: main results table filled with some number in every cell — the quality improves later, the design cannot.
- T−4 weeks: draft exists in the official paper kit (not a one-column doc — the 4-page reality only shows in the template).
- T−2 weeks: internal review by one speech scientist and one engineer, mirroring the reviewer mix; significance tests run.
- T−1 week: compression pass (
interspeech-writing-style), anonymity sweep, demo page frozen. - T: submit half a day early; CMT queues at AoE cutoffs.
- T+1 week: proofread the submitted PDF; use the update window for repairs only.
Failure patterns by phase
- Winter: discovering at T−1 that the paper is 5.5 pages — compression is a
week of work, not a night (see the compression order in
interspeech-writing-style). - Spring silence: team disbands; nobody owns the rebuttal when it lands. Assign the response owner at submission time.
- June: acceptance euphoria eats the two-week camera-ready window; the registration coupling (no registered author → no proceedings entry) surfaces in August as a crisis.
- September: audio demos that only ever ran on the lab machine meet a conference-hall AV chain. Rehearse playback; carry spectrogram fallbacks.
Parallel-track decisions
- Interspeech vs ICASSP double rhythm: the sibling deadline (typically autumn for ICASSP) means a rejected February idea has a fall retry — decide in June whether reviews point to "fix and ICASSP" or "grow and Interspeech 2027".
- Challenge alignment: many Interspeech papers ride a challenge (CHiME, VoxSRC, ASVspoof…); challenge timelines are their own clocks, published by each organizer, and system-description papers have separate rules — verify per challenge.
- Journal extension: an accepted 4-pager with leftover material has a standard afterlife at TASLP / Computer Speech & Language / Speech Communication; start the extension outline while the reviews are fresh.
Standing owner map
Assign at kickoff, not at crisis:
- Paper owner — format, compression, the submitted PDF, the update-window proofread.
- Evidence owner — experiment matrix, seeds, significance, scoring scripts.
- Compliance owner — anonymity sweep (PDF + demo page + repo), license chain, policy checkboxes.
- Rebuttal watcher — has CMT credentials, watches the reported window, owns the response draft calendar.
- Logistics owner — registration before the tier cutoffs, visa timelines, AV rehearsal for the talk or poster QR codes.
One person can hold two hats; no hat may be unassigned. Every 2026 failure pattern above maps to exactly one vacant hat.
Minimal milestone ledger
[frozen] claims / corpus / splits ........ T-10w owner: evidence
[in-kit] draft in official template ...... T-4w owner: paper
[reviewed] internal science+eng pass ....... T-2w owner: paper
[swept] anonymity + demo page frozen .... T-1w owner: compliance
[in] CMT submission confirmed ........ T owner: paper
[patched] update-window proofread ......... T+1w owner: paper
[watched] rebuttal window covered ......... spring owner: watcher
[final] camera-ready + registration ..... June owner: logistics
Output format
[Phase] pre-deadline / update-window / silent-spring / rebuttal /
post-decision / conference-run-up / post-conference
[Live deadline] <date + what it gates + source URL>
[Owner map] paper / rebuttal / camera-ready+registration / artifacts / talk
[Backward plan] next three offsets with dates
[Parallel tracks] ICASSP retry? challenge clock? journal extension?
[Risk now] <single most time-critical item>
Verified anchors and the 待核实 list live in
resources/official-source-map.md (checked 2026-07-08). ISCA rotates organizing
committees per edition — the Sydney team's choices (tracks, rebuttal shape,
attachment rules) do not bind São Paulo.
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.