Icsme workflow
Skill brycewang-stanford/Awesome-Journal-Skills/ICSME-Skills/skills/icsme-workflow
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill icsme-workflowAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when planning an IEEE ICSME project timeline from venue and track choice through abstract registration, paper submission, the early-decision cut and author-response rebuttal, notification, IEEE Xplore camera-ready, the ROSE-Festival artifact evaluation, and presentation, with backward-planning offsets for a maintenance/evolution paper and honest handling of the single-annual-round calendar.
SKILL.md
5.6 KB, ~1.2k tokens by cl100k_base, as published. Nobody here has run it
ICSME Workflow
Use this as the project-management skill for an ICSME submission. Replace every date with the current official timetable and work backwards from the EasyChair abstract cutoff — which precedes the paper deadline. ICSME runs a single annual research round with no journal-style Major Revision: a paper is accepted or rejected in one cycle, so front-load the evidence and plan the author-response rebuttal, not a revise-and-resubmit.
ICSME is an IEEE conference with no standing editor-in-chief and no APC: proceedings go to IEEE Xplore and the cost model is registration. Rotating leadership is the per-edition General and Program Co-Chairs (ICSME 2026 committee roster 待核实 on the access date); re-check the organizing-committee page rather than carrying names forward. ICSME 2026 is the 42nd edition in Benevento, Italy (University of Sannio), 14-18 September 2026, co-located with SCAM and VISSOFT.
Milestones
- Venue and track fit: confirm ICSME over ICSE/FSE/SANER/MSR and pick the track — research,
Journal-First, Registered Reports, RENE, NIER, tool-demo, or industry (
icsme-topic-selection). - Evidence lock: freeze research questions, subject systems and their change history, baselines, statistics, threats, and the artifact contents.
- Abstract registration: submit real title, abstract, authors, and topics by the earlier abstract deadline (ICSME 2026: 27 Feb 2026).
- Paper submission: upload the anonymized PDF and data-availability statement (ICSME 2026: 6 Mar 2026).
- Early-decision cut: at the response period's start, some papers are already Accept or Reject; the rest are "Response Recommended" (ICSME 2026 early decisions: 3 May 2026).
- Author response: if invited, answer the PC's specific questions with existing evidence.
- Notification: final accept/reject (ICSME 2026: 29 May 2026); archive reviews and the response.
- Acceptance: prepare the IEEE Xplore camera-ready, submit to the ROSE-Festival artifact track for IEEE badges, register, and present.
Backward plan from the paper deadline
| Weeks out (heuristic) | Maintenance/evolution milestone |
|---|---|
| 10+ | Research questions fixed; subject systems and their change-history window chosen |
| 8 | Mining / data collection complete; repository SHAs and extraction dates logged |
| 6 | Analysis done; effect sizes and tests computed; threats drafted alongside results |
| 4 | Full draft in IEEEtran conference format; artifact assembled and anonymized |
| 3 | Internal mock review by a maintenance-empiricist reader |
| 2 | Threats hardened, related-work delta sharpened, 10-page budget met |
| 1 | Anonymity sweep on PDF and artifact; data-availability statement final |
| 0 | Abstract registered by its earlier cutoff, then paper + artifact link on EasyChair |
These offsets are planning heuristics only — anchor every one to the current Important Dates page, never to a previous cycle's calendar.
The single-round calendar reality
ICSME runs one annual research round; the author-response rebuttal is the only mid-cycle lever, and there is no Major Revision to fall back on. Planning consequences:
- A rejected paper waits a full year at ICSME. Before idling, check whether a sibling (SANER, ICSE, FSE) has a nearer deadline, or whether the work is better routed to TSE/EMSE and returned later via the Journal-First track.
- A not-yet-finished study may fit Registered Reports (protocol reviewed first) rather than being rushed into the research track and rejected on thin evidence.
- A replication or negative result has a dedicated home in RENE — do not force it into the research track where novelty framing will hurt it.
Failure modes by stage
- Mining still running at week 4 forces last-minute analysis nobody has audited — the classic soundness reject for an evolution study.
- Naming your own subject system or public corpus breaks double-anonymity when the artifact is left to the final week.
- Skipping the mock review forfeits the one chance to hear "your baseline maintainer study is confounded" from a friend instead of a reviewer.
- Treating the author response as a debate wastes the single rebuttal ICSME gives you; answer the PC's specific questions with evidence, not argument.
Coordination notes
- Assign one owner for the data-availability / artifact and another for the anonymity sweep; shared ownership is how both slip under double-anonymity.
- Archive the exact submitted PDF and artifact; the response period must quote the paper precisely and stay anonymous.
- The ROSE-Festival artifact submission is a separate, post-acceptance deadline shared with SCAM and VISSOFT — calendar it apart from the camera-ready.
Output format
[Current stage] idea / evidence / abstract / submitted / response period / accepted
[Track] research / journal-first / registered report / RENE / NIER / tool-demo / industry
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <page budget / anonymity / evidence / threats / artifact / presentation>
[Owner map] <task -> person or role>
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.