agentsclimarketplace

Icse workflow

Skill brycewang-stanford/Awesome-Journal-Skills/ICSE-Skills/skills/icse-workflow

Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill icse-workflow

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

Use when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection.

SKILL.md

5.6 KB, ~1.3k tokens by cl100k_base, as published. Nobody here has run it

ICSE Workflow

An ICSE campaign is a ten-month pipeline with one entrance. The 2027 cycle (checked 2026-07-08 against the official dates pages) runs a single submission cycle — a change from the two-cycle 2025/2026 model — so a missed June deadline costs a full year, and the calendar below is the whole game.

The 2027-cycle master calendar

Date (all AoE where applicable)MilestoneYour workstream
Jun 23, 2026Abstract (mandatory)Real title + abstract frozen
Jun 30, 2026Full paper deadline10+2 IEEE PDF, artifact link live
Jul–Aug 2026Reviews writtenPrepare response infrastructure; rest
Sep 2026Author response windowCriterion-mapped replies (icse-author-response)
Oct 20, 2026Decisions: Accept / Major Revision / RejectBranch: celebrate / sprint / reroute
Nov 17, 2026Major Revision dueFour-week revision sprint
Dec 18, 2026Final MR decisionsTerminal for the cycle
Early 2027 (待核实)Artifact evaluation windowBadge submission (icse-artifact-evaluation)
待核实Camera-ready due+1 page allowance, IEEE production
Apr 25 – May 1, 2027ICSE in Dublin (core Apr 28–30)Talk, artifact, networking plan

Artifact-evaluation and camera-ready dates for 2027 were not posted at check time; the 2026 edition ran artifact registration/submission in early January, which is the planning anchor until real dates appear.

Working backward from June 30

A credible empirical-SE paper cannot be compressed into deadline month, because its long poles — subject recruitment, benchmark construction, multi-week tool runs, qualitative coding with a second rater — do not parallelize late. Plan backward:

Jun 30  freeze: PDF + anonymized replication package
Jun 16  full internal mock review against the four criteria
Jun 02  results complete; threats-to-validity written from real limitations
May 05  evaluation running at scale; paper skeleton has real numbers
Apr 07  study design locked (RQs, baselines, metrics, subjects); pilot done
Mar 2026 and earlier: idea vetted with icse-topic-selection; related work swept

The two dates authors most often plan around wrongly: the abstract deadline is mandatory (June 23 — a week before the paper, not a formality), and the response window is September, which lands in teaching-start season for most groups — reserve the days now.

Role assignments that prevent deadline-week chaos

  • Evidence owner — benchmarks, baselines, statistics; owns Jun 2 freeze.
  • Artifact owner — replication package, anonymization, availability statement; owns the link that goes in the paper.
  • Prose owner — the 10-page budget, the threats section, the criterion self-audit.
  • Process owner — HotCRP fields, conflicts, abstract registration, calendar of every date above in the group calendar with AoE conversions.

One person can hold two hats; no hat may be unheld.

Branch plans after October 20

  • Accept: artifact-evaluation submission (badges are opt-in and post-acceptance), camera-ready with the extra page, Dublin logistics.
  • Major Revision: the November sprint is pre-planned before October — which experiments could be extended, which machines are free in November. Groups that first think about feasibility on notification day lose a week of the four.
  • Reject: reroute within weeks, not months. FSE and ASE deadlines typically land in spring/summer, ISSTA in autumn/winter; TSE/TOSEM/EMSE take extended versions year-round, and a journal acceptance can return to the ICSE stage via journal-first (2027 window: papers accepted Oct 11, 2025 – Oct 10, 2026 at TSE/TOSEM/EMSE). Check each venue's live dates — sibling calendars move annually.

Cadence between milestones

The calendar above names endpoints; groups that hit them run a steady between-milestone cadence: a weekly claims-vs-evidence review from April (which headline claim is still unevidenced, who unblocks it), a biweekly package build so the artifact never diverges more than two weeks from the paper, and a standing "deadline minus 14" rehearsal where the current draft is mock-reviewed against the four criteria by someone outside the author list. The mock review is the cheapest Major-Revision insurance available: it finds the missing-baseline and boilerplate-threats objections while there is still a month to fix them rather than four weeks in November.

Cycle-volatility warnings

  • The single-cycle structure itself is the newest variable: 2025/2026 ran two cycles, 2027 runs one. Verify the cycle count first each year, because it changes every downstream date and the rerouting math.
  • Response format, artifact deadlines, camera-ready dates, and registration rules were all unposted for 2027 at check time — 待核实 before promising them to coauthors.
  • Do not let old two-cycle advice ("resubmit to cycle 2") leak into planning; that lane does not exist in 2027.

Output format

[Cycle position] months to next ICSE deadline; feasible? yes/no
[Backward plan] dated milestones from today to freeze
[Owners] evidence / artifact / prose / process
[Branch readiness] MR sprint pre-plan? reroute venue + date named?
[Calendar risks] deadlines colliding with teaching/travel; AoE conversions done

What ships with it

Read from the repository

Just SKILL.md. No reference files, no scripts.

Keep looking

Skills are one crate of 328,039. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.