Icalp workflow
Skill brycewang-stanford/Awesome-Journal-Skills/ICALP-Skills/skills/icalp-workflow
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill icalp-workflowAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when planning an ICALP (EATCS) campaign backward from its single annual February deadline, through abstract registration, the anonymous submission, the Track B rebuttal window, the April notification, and the LIPIcs camera-ready and presentation, and when coordinating a full-version (arXiv/ECCC) release alongside the anonymous submission.
SKILL.md
4.6 KB, ~1.1k tokens by cl100k_base, as published. Nobody here has run it
ICALP Workflow
Run the ICALP year backward from the single annual February deadline. ICALP posts one research-paper deadline per year across its two tracks, so unlike a multi-deadline venue there is no "next cycle in a few months" — a missed February means a full year lost. The calendar below is the ICALP 2026 (53rd, Royal Holloway) cycle, verified 2026-07-09; reopen the live Important Dates page and the correct track's HotCRP deadline before trusting any date.
The one-cycle calendar (ICALP 2026 anchor)
[early February] Abstract registration (2026: 3 Feb, AoE) — title/abstract/authors/conflicts
[~3 days later] Full submission (2026: 6 Feb, AoE) — anonymized 15-page PDF + appendix
[late March] Track B rebuttal (2026: 21-24 Mar) — Track B only; Track A no general rebuttal
[late April] Notification (2026: 20 Apr)
[spring] Camera-ready in LIPIcs (lipics-v2021); exact date 待核实 per cycle
[July] Conference (2026: 7-10 Jul, workshops 6 Jul), Royal Holloway
Backward plan from the February deadline
- T-12 to T-8 weeks: prove the theorems. ICALP results are proofs, and a proof is not "almost done" until it is written in full — budget for the gap between "I believe it" and "it is on paper."
- T-6 weeks: decide the track (
icalp-topic-selection) and settle the model and theorem statements; these anchor the whole paper. - T-4 weeks: draft the 15-page body and the full proofs in the appendix / full version in
parallel; the body sketches, the appendix proves (
icalp-supplementary). - T-2 weeks: anonymize for lightweight double-blind, rewrite self-citations in third person, and prepare (but do not necessarily post) the arXiv/ECCC full version.
- T-1 week: register the abstract; run
icalp-submissionon the near-final PDF. - Deadline day: submit to the correct track's HotCRP server well before the AoE cutoff; flag student-only authorship if eligible.
The Track B rebuttal (know if it applies to you)
The tracks diverge after submission:
- Track A: no general rebuttal. Authors are contacted only if reviewers find a correctness issue to resolve. Plan as if there is no author interaction.
- Track B: a rebuttal window (2026: 21-24 March) where authors view initial reviews and
respond. Reserve those days; see
icalp-author-response.
Do not assume both tracks behave alike, and do not count on a rebuttal for a Track A paper.
Coordinating the full version
- A full version on arXiv/ECCC/HAL is standard and encouraged — it is how the community checks proofs the 15-page body only sketches. But during review, keep it from breaking anonymity (do not cite "our arXiv paper"); a separately hosted full version that a determined reviewer could find is acceptable under the lightweight regime, but do not advertise it.
- Post or update the public full version around notification/camera-ready, and make the LIPIcs version and the arXiv version consistent.
After notification
- Accept: move to
icalp-camera-ready— reformat tolipics-v2021, restore author names and acknowledgements (de-anonymize), and hit the LIPIcs production deadline. Arrange for at least one author to present. - Reject: no appeal. Use
icalp-topic-selection's routing table — a strong result may fit STOC/FOCS/SODA/LICS or a journal on a nearer calendar; incorporate the reviews before resubmitting.
Milestone checklist
[ ] Track chosen and correct HotCRP server identified
[ ] Theorems fully proved (not just believed)
[ ] Abstract registered before the earlier February cutoff
[ ] 15-page body + complete appendix/full-version proofs
[ ] Lightweight double-blind sweep passed
[ ] Track B: rebuttal window reserved (Track A: none expected)
[ ] On accept: LIPIcs camera-ready + presenter arranged
Output format
[Cycle target] ICALP <year>, Track A / Track B
[Countdown] weeks to the February deadline; abstract-registration date
[Current stage] proving / drafting / anonymizing / submitted / rebuttal (B) / notified / camera-ready
[Track-specific] Track B rebuffer window reserved? / Track A correctness-contact readiness
[Next actions] <ordered, with dates tied to the single annual deadline>
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.