Cvpr workflow
Skill brycewang-stanford/Awesome-Journal-Skills/CVPR-Skills/skills/cvpr-workflow
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill cvpr-workflowAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when planning a CVPR submission campaign end to end, covering the November abstract/paper/supplement deadline chain, coauthor reviewer-duty scheduling, the January rebuttal sprint, February decisions, camera-ready and June conference logistics, and the resubmission ladder across ICCV, ECCV, and the next CVPR.
SKILL.md
6.7 KB, ~1.6k tokens by cl100k_base, as published. Nobody here has run it
CVPR Workflow
CVPR is an annual machine with one intake: in the 2026 cycle, abstracts November 6, papers November 13, supplements November 20, rebuttal late January, decisions February 20, conference June 3–7 in Denver. This skill turns that spine into a project plan with owners, because CVPR deadline weeks are lost to coordination failures more often than to science failures.
Campaign calendar (2026-cycle anchors)
| When | Milestone | Owner discipline |
|---|---|---|
| T–10 weeks (early Sep) | Freeze scope: claims, benchmarks, baselines | PI + first author sign one paragraph |
| T–8 weeks | Experiment matrix running; recipe ledger live | Every table row has a config |
| T–6 weeks | First full draft; flip-test the figures | Co-authors annotate, don't rewrite |
| T–4 weeks (early Oct) | OpenReview profiles audited for every author | One named owner; new coauthors close the list |
| T–1 week (Nov 6) | Abstract registered; profiles valid | Desk-reject exposure if missed |
| Nov 13 | Paper + CRF submitted | Freeze 24h early; upload before the panic hour |
| Nov 20 | Supplement uploaded | Videos/code packaged per cvpr-supplementary |
| Dec – Jan 12 | Coauthors deliver their assigned reviews | Late reviews endanger your paper |
| Jan 22–29 | Reviews land; one-page rebuttal | Pre-book this week; nobody travels |
| Jan 30 – Feb 5 | Discussion (no author access) | Resist mailing the AC |
| Feb 20 | Decisions | Both branches pre-planned |
| Spring (待核实) | Camera-ready + dataset release due | See cvpr-camera-ready |
| Jun 3–7 | Conference (workshops 3–4, main 5–7 in 2026) | Poster/talk/travel logistics |
The two windows people fail to defend
Deadline fortnight (early November). The supplement trailing the paper by a week tempts teams to leave packaging "for week two" — then week two evaporates into video rendering and code scrubbing. Rule: the supplement plan (what goes in, who builds it) is written before the paper deadline; week two only executes it.
Rebuttal week (late January). Seven days, one page, all reviewers at once. Assign roles when reviews drop, not after a day of group grief:
# rebuttal-roles.yaml — filled within 12 hours of review release
reader: # summarizes all reviews neutrally, one page, no rebuttals yet
runner: # owns the 1-2 small requested experiments; hard stop at day 5
writer: # owns the single page; everyone else feeds bullets
adjudicator: # PI decides which objections get space, which get one line
deadline: # internal freeze 24h before OpenReview close
Reviewer duty as a planned workload
Submitting enrolls qualifying authors into a 25k-reviewer pool, and undelivered or irresponsible reviews can desk-reject every paper the offender authored (verified 2026 enforcement). Treat December–January reviewing as a scheduled deliverable: at submission time, list which coauthors are likely reviewers, block their calendar for review weeks, and have the group's senior authors sanity-check first-time reviewers' drafts against the official reviewer guidelines.
Multi-paper coordination
Most labs submit several papers into the same November wall, which multiplies the process risks nonlinearly:
- Shared coauthors, shared exposure: one person's undelivered January review endangers every paper they touch; the duty ledger must be lab-level, not paper-level.
- Conflict hygiene: OpenReview conflicts must be complete across all submissions; a stale institution on one profile pollutes assignments for the whole batch.
- Compute contention: rebuttal-week reserve GPU allocations collide when three papers each promised "small requested experiments"; pre-negotiate priority order.
- Internal review: schedule lab-mates' cross-reads at T–10, not T–2 — at T–2 everyone is defending their own draft.
The resubmission ladder
At a 25.42% acceptance rate, the rational plan covers rejection before it happens. The CV calendar offers a clean ladder — CVPR (Nov) → ICCV (spring deadline, odd years) / ECCV (spring deadline, even years) → WACV/3DV or back to CVPR. Rules for climbing:
- Bank the reviews: fix every factual objection before the next deadline; reviewer
pools overlap across CVF venues and repeat objections read badly (triage method in
cvpr-review-process). - Mind the dual-submission windows: the CVPR attestation covered Nov 13 – Feb 20 in 2026; the next venue's window must not overlap a paper still under CVPR review.
- Re-check freshness: three months of arXiv can obsolete a comparison table; budget a baseline-refresh pass, not just an edit pass.
Deadline fortnight, day by day
The last two weeks compress badly when run ad hoc. A schedule that has survived contact with real teams:
- T–14 to T–10: results freeze for the main table. New numbers after this go to the supplement or the rebuttal, not the body.
- T–10 to T–7: full-draft pass; run the figure flip test with an outsider; final baseline-freshness check against the leaderboard.
- T–7 (abstract day): register the abstract, verify every profile renders as complete when logged out of the authors' accounts, lock the author list.
- T–6 to T–3: claim-calibration pass (
cvpr-writing-style), bibliography venue verification (cvpr-related-work), CRF mandatory sections drafted. - T–2: full mechanical sweep from
cvpr-submission; internal freeze. - T–1: upload; re-download; cold read. Nobody edits after upload day.
- T to T+7 (supplement week): execute — do not design — the supplement plan; identity-scan code and videos; upload at T+5, not T+7, to survive a failed render.
Cycle-status note
As of 2026-07-08, CVPR 2026 has concluded and the CVPR 2027 cycle (Seattle, reported around June 20–24, 2027) had published no CFP or deadlines. Every date above is a 2026-cycle anchor for planning shape only — reopen cvpr.thecvf.com the moment your team commits, because the deadline chain (and things like the CRF) can change between editions.
Output format
[Campaign stage] scoping / building / deadline-fortnight / in-review / rebuttal / decided
[Calendar] next 3 milestones with dates and owners
[Duty ledger] reviewing coauthors + calendar blocked: yes/no
[Risk register] top 3 (missed-profile, supplement drift, rebuttal roles, …)
[Plan B] next venue + its verified deadline
[Cycle check] current-year pages reopened on: <date>
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.