Atc workflow
Skill brycewang-stanford/Awesome-Journal-Skills/ATC-Skills/skills/atc-workflow
Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill atc-workflowAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Use when planning an ATC (ACM SIGOPS Annual Technical Conference, formerly USENIX ATC) campaign end to end — running the year backward from the early-June deadline through the two review rounds, the rebuttal, conditional-acceptance shepherding, the post-acceptance artifact evaluation, and the ACM Open Access camera-ready for the November Hong Kong conference.
SKILL.md
5.4 KB, ~1.2k tokens by cl100k_base, as published. Nobody here has run it
ATC Workflow
Plan the campaign backward from the deadline. ATC 2026 — the first ACM SIGOPS edition of the former USENIX ATC — runs on a calendar and a review structure that both changed in the transition: an early-June 2026 submission deadline (AoE; 1 vs. 10 June unresolved across renderings — 待核实), a two-round, extended-abstract review, conditional acceptance with shepherding, a separate artifact-evaluation track, and the conference in Hong Kong, 15-18 November 2026. Reopen the SIGOPS call for the exact dates before committing to any of the offsets below.
The arc (backward from the deadline)
[T-0 Submission] paired upload: 2-page extended abstract + full paper on atc26.hotcrp.com
[Round one] two reviewers judge each extended abstract; below-bar papers cut early
[Round two] 3-4 reviewers read the full paper of survivors
[Rebuttal] ~1 page: correct factual misreadings; note prior-submission changes if any
[Decision] conditional accept / reject
[Shepherding] a PC shepherd signs off required revisions before final acceptance
[Artifact evaluation] separate post-acceptance AEC track -> Available / Functional / Reproduced
[Camera-ready] de-anonymize, satisfy shepherd, ACM Open Access metadata + production checks
[Nov 15-18] present at the Hong Kong conference; talk video/slides per the venue norm
Backward plan from the June deadline
- T-10 to T-8 weeks: lock the system and freeze the experiments. On a systems paper the testbed
and measurements are the long pole; leave prose churn for later. Pin environments now
(
atc-reproducibility) — provenance cannot be reconstructed at the deadline. - T-6 weeks: full-paper draft complete against
atc-writing-style; baselines and honest costs in place peratc-experiments. - T-3 weeks: write and stress-test the two-page extended abstract — the round-one decision surface. Have someone read only the abstract and tell you the problem, contribution, testbed, and result. If they cannot, fix it.
- T-2 weeks: build the anonymized, runnable artifact and the claim-to-experiment map.
- T-1 week: double-blind sweep on the final PDF, abstract, and artifact; fill HotCRP fields and conflicts; confirm the exact AoE deadline day.
- T-0: upload both the extended abstract and the paper; re-download and read cold.
Between submission and decision
- Round one is silent from your side — there is no action between upload and the round-one cut; the abstract is your entire round-one argument. Do not start major new experiments hoping to swap in a stronger paper mid-cycle.
- If you advance to round two, prepare for the rebuttal: keep a running list of the measurements
and clarifications a skeptical reviewer would ask for, so the ~1-page window is spent well
(
atc-author-response).
After a conditional accept
- Treat the shepherd's required revisions as binding. Make each change or explicitly justify declining it; the shepherd holds final acceptance until satisfied.
- Start the artifact-evaluation package immediately: the AEC track has its own post-acceptance
deadline, independent of the camera-ready (
atc-artifact-evaluation). De-anonymize and archive the artifact in a DOI-issuing repository for the Available badge. - Prepare the camera-ready: de-anonymize the paper, fold in the shepherd's changes, and complete
ACM Open Access metadata (
atc-camera-ready). Budget for the transition APC (subsidized for 2026; exact figure per the ACM/SIGOPS terms).
Calendar reconnaissance
[Deadline] confirm the exact early-June AoE day on the SIGOPS call (1 vs 10 June — 待核实)
[Conference] Hong Kong (Hyatt, Shatin), Nov 15-18, 2026 — plan travel/visa early for HK
[Rotation] under SIGOPS, ATC rotates Asia/Europe/North America; next-year location differs
[Artifact] find the AEC submission date on the call for artifacts (separate from camera-ready)
[Backup] if rejected, line up OSDI/NSDI/EuroSys/FAST dates via atc-topic-selection
Reverify each cycle
- The exact deadline day, notification/rebuttal dates, and camera-ready date.
- Whether the two-round extended-abstract model and the reviewer counts persist.
- Artifact-evaluation timing and the badge set; the Deployed Systems lane (待核实).
- ACM Open Access / APC terms; template file (USENIX vs. ACM) (待核实).
Output format
[ATC workflow stage] planning / drafting / abstract-hardening / submitted / round two / rebuttal / shepherding / artifact / camera-ready
[Critical path] the long-pole task (usually testbed + measurements, then the extended abstract)
[Deadline set] submission (early June AoE), rebuttal, shepherd sign-off, artifact, camera-ready
[Next action] the single most schedule-critical step, with a date
[Risk] the item most likely to slip (provenance pinning / abstract self-containment / shepherd changes)
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.