agentsclimarketplace

Acl review process

Skill brycewang-stanford/Awesome-Journal-Skills/ACL-Skills/skills/acl-review-process

Journal-specific Claude Code/Codex skill packs covering mainstream journals — AER, QJE, Nature, Cell, 管理世界, 经济研究 & 200+ more — your fast track to getting published. | 覆盖主流期刊的 Claude Code/Codex 期刊技能包,从选题、识别策略到表格规范与审稿回复全流程,助你快速发论文。

Install
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill acl-review-process

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

Use when reasoning about how an ACL paper travels through ACL Rolling Review and conference commitment, covering reviewer and area-chair roles, meta-reviews, the commitment decision by senior area chairs and program chairs, Findings versus main-conference outcomes, ethics review escalation, and resubmission strategy across cycles.

SKILL.md

6.1 KB, as published. Nobody here has run it

ACL Review Process

Use this to model where an ACL paper actually is and who decides what next. ACL decoupled reviewing from the conference: ARR produces the review package; the conference consumes it. Confirm current mechanics at aclrollingreview.org/reviewing, since cycle structure has changed repeatedly (most recently to 10-week cycles in 2025).

The pipeline, stage by stage

  1. ARR cycle intake: submission on OpenReview to a dated cycle (e.g., ARR January 2026); checks for format, Limitations, checklist, anonymity.
  2. Review: at least three reviewers score and write reviews.
  3. Author response + discussion: authors reply; reviewers discuss and may update reviews (see acl-author-response).
  4. Meta-review: the action editor / area chair synthesizes reviews into a meta-review with a recommendation. Notably, ARR senior area chairs do not make accept/reject recommendations — that authority sits with the venue.
  5. Commitment: authors choose whether and where to send the finished package — ACL, or another *ACL venue accepting that cycle.
  6. Venue decision: the conference's senior area chairs and program chairs read reviews + meta-review and decide: main conference, Findings, or reject.
  7. Ethics branch: papers flagged during review go to an ethics committee, which can require revisions or recommend rejection on ACL Code of Ethics grounds independent of technical merit.

Who decides what

ActorControlsCannot do
ReviewerReview text, scores, discussion updatesAccept or reject anything
AC / action editorMeta-review, review-issue handlingBind the conference's decision
AuthorResponse, revision, where/whether to commitChange reviews after the cycle closes
Venue SACs + PCsMain/Findings/reject from the ARR packageRe-run the reviewing itself
Ethics committeeEthics-based conditions or rejectionJudge technical contribution

Outcomes and what they mean

  • Main conference: full acceptance with a presentation slot.
  • Findings of ACL: peer-reviewed, Anthology-published acceptance for solid work that missed the main-program bar; typically without a main-stage oral. Citation-wise Findings papers perform respectably — treat it as a real publication decision, not a consolation to appeal.
  • Reject at commitment: the ARR reviews remain attached to the paper's history; a stronger resubmission through a later cycle is the designed path.

Reading your review package strategically

  • Weigh the meta-review over individual scores: it is the document venue chairs actually read.
  • A package with one detailed negative review and a meta-review that endorses the objection rarely survives commitment — fix the objection in a new cycle instead of shopping the package to another venue unchanged.
  • Conversely, mediocre scores with a meta-review noting resolved concerns can be worth committing: the venue decision is made on the whole record.
  • A meta-review score at the floor triggers the resubmission constraint: within six months, only a wholesale revision avoids desk rejection.

Venue-shopping within the ARR ecosystem

The same review package can be committed to exactly one venue at a time, but a rejected or withheld package can target a later conference (EMNLP, EACL, NAACL, AACL) whose commitment window accepts that cycle. Sequence deliberately: each conference publishes which ARR cycles it accepts, and reviews age — a package built on a two-cycle-old baseline set gets punished at commitment.

Anatomy of one 10-week cycle

week 0      submission deadline (AoE)
weeks 1-2   desk checks; reviewer + AC assignment
weeks 3-5   reviewing
week 5      reviews released -> author response (a few days)
week 6      reviewer discussion; reviews may be updated
weeks 7-8   meta-review written
~week 10    package complete -> commitment window for eligible venues

Offsets drift by cycle; the January 2026 cycle ran Jan 5 → reviews by early March → ACL 2026 commitment March 14. Always re-derive from the current dates page.

Reading reviewer language for what it predicts

  • "The contribution is unclear" from two reviewers predicts a meta-review hedge — fix framing in the response, not just individual complaints.
  • "Missing citation X, Y, Z" alone rarely sinks a paper; the same list attached to "novelty over X is marginal" usually does.
  • A confident low-score review with factual errors is the best target for a review-issue flag plus a surgical rebuttal.
  • Uniform middling scores with short reviews often mean poor reviewer fit; at commitment, venue chairs weigh the meta-review's own reading more — make sure the response arms the AC with the paper's best case.

Confidentiality and conduct boundaries

  • Review content is confidential to the cycle; quoting reviews publicly (even anonymized) before decisions violates ARR expectations.
  • Contacting reviewers or guessing identities is out of bounds; all communication flows through the OpenReview thread and the AC.
  • Authors are bound by the ACL code of ethics throughout — including in how the author response characterizes reviewers' competence.
  • Deadlines inside the cycle (response, discussion) are short and rarely extended; plan around them rather than requesting exceptions.

Output format

[Stage] cycle-intake / under review / response / meta-review / commit-window / venue decision / ethics review
[Package strength] <meta-review thrust + score pattern>
[Commit recommendation] commit to ACL / hold for revision / target sibling venue
[Ethics exposure] <flag risk and mitigation>
[Next actor to influence] <reviewer via discussion / AC via response / venue via commitment note>

Keep looking

Skills are one crate of 328,083. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.