Handoff
Skill BlueprintOS/analysis-to-delivery/skills/user-invoked/handoff
通用需求到开发设计工作流 — 26 个独立可组合 skill,跨行业(医药/SaaS/移动),3 个完整示例,5 个 CI workflow,Mermaid/Drawio 流程图工具链,VSCode 集成
npx -y skills add BlueprintOS/analysis-to-delivery --skill handoffAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 24 stars24 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
What its author says it does
Copied from the file, not written here
代码交接文档 — 整理本项目已完成的全部设计文档、待办事项、已知风险、后续工作建议。设计阶段收尾、向实施团队或编码 skill 正式交接时调用本 skill 生成 HANDOVER.md。
SKILL.md
3.2 KB, as published. Nobody here has run it
Handoff — 代码交接
Contract
- 输入: P0=0 的 QA 审计报告,已完成的全部设计文档,已知风险与待办
- 输出:
HANDOVER.md - 门控: 交接文档含已完成文档清单、待办、风险、后续建议;接收方已确认收到
- Required rules:
stage-gate,doc-numbering,context-pointer,goal-boundary - Required paths:
knowledge-path,tech-stack-path,compliance-path,doc-naming-path - 下一步:
/using-superpowers或交接给开发团队
适用场景
- QA 审计通过(P0=0)
- 准备把设计交付给编码 skill(如
wms-code-implementation)或开发冲刺
流程步骤
1. 整理已完成文档
列出本项目已交付的设计文档:
## 已完成文档
| 编号 | 文档 | 路径 | 状态 |
|---|---|---|---|
| 01 | 业务需求文档 BRD | `01-业务需求文档 BRD.md` | ✅ |
| 02 | 功能规格说明书 FSD | `02-功能规格说明书 FSD.md` | ✅ |
| 03 | 数据模型设计 | `03-数据模型设计.md` | ✅ |
| 04 | 合规评审 | `04-合规评审.md` | ✅ |
| 05 | 产品需求文档 PRD | `05-PRD.md` | ✅ |
| 06 | 开发设计说明书 | `06-开发设计说明书.md` | ✅ |
| 07 | 测试用例设计 | `07-测试用例设计.md` | ✅ |
| 08 | 设计回测报告 | `08-设计回测报告.md` | ✅ |
| 09 | QA 审计报告 | `09-QA审计报告.md` | ✅ |
| - | AGENTS.md | `AGENTS.md` | ✅ |
2. 整理待办事项
按 P0/P1/P2 列出:
## 待办事项
### P0(必须后续处理)
- [ ] ...
### P1(建议后续处理)
- [ ] ...
### P2(可选)
- [ ] ...
3. 整理已知风险与限制
## 已知风险与限制
| 风险 | 影响 | 缓解 | 责任方 |
|---|---|---|---|
| ... | ... | ... | ... |
4. 后续工作建议
- 进入实施:推荐
/using-superpowers走 5 步实施子流程 - 或转交编码 skill:如
wms-code-implementation - 或直接进入开发冲刺:按 PRD §九 上线计划推进
5. 触发
- 转交编码 skill → 在项目根放
HANDOVER.md - 或直接进入开发冲刺 → 把 HANDOVER.md 链接发到团队群
输出
HANDOVER.md
调用的 rule
rules/stage-gate— 阶段 9 门控rules/doc-numbering— HANDOVER 不受编号约束
结束条件
- HANDOVER.md 含 4 节(已完成/待办/风险/后续)
- 接收方(编码 skill / 开发团队)已确认收到
反模式
- ❌ HANDOVER 写"已交付" — 必须含 4 节(已完成/待办/风险/后续),缺一不可
- ❌ 待办事项不给责任方 — 每条 TODO 必须有责任人 + 预期完成时间
- ❌ 已知风险无缓解建议 — 每条风险必须配缓解 + 触发条件
- ❌ 后续工作无优先级 — 必须分 P0/P1/P2,接收方才知道先做什么
- ❌ 不写验收清单(已交付 vs 验收) — 必须含"接收方验收 Checklist" 段
- ❌ HANDOVER 占编号(写 10-HANDOVER) — HANDOVER 不受编号约束,严禁占位