Skill 2702207741-dev/agent-skills-pipeline/planning-workflow

Governed, replay-tested agent skills for Codex-style maintainer workflows.

Install
npx -y skills add 2702207741-dev/agent-skills-pipeline --skill planning-workflow

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Use when the user asks to plan a project, roadmap, migration, refactor, release, investigation, multi-step implementation, risky change, or execution sequence and needs phases, dependencies, risks, validation gates, rollback, owners, or next actions.

SKILL.md

14.6 KB, as published. Nobody here has run it

Planning Workflow

Overview

A good plan reduces risk without ceremony. Convert a goal into scope, phases, tasks, dependencies, gates, rollback, and next action.

When to Use

Use WhenDon't Use When
The user says "plan", "roadmap", "implementation plan", "migration plan", "release plan", or "break this down"One-step edit with no sequencing or rollback risk
Work spans multiple files, systems, sessions, days, data stores, or deploy stagesRequirements are too vague; use requirements-clarifier first
A risky change needs validation gates, rollback points, owner handoffs, or rolloutThe user asks to debug a concrete failure now; use systematic-debugging
The user wants phases, dependencies, task ordering, or an execution checklistThe user only asks for code review findings; use code-review-workflow
A migration, refactor, release, investigation, or roadmap must be executable before work startsThe user explicitly asks to skip planning and accepts unmanaged risk

Phase 0 Benchmark Decision

Type: Technique with planning judgment. Adopt Superpowers writing-plans: exact paths, bite-sized tasks, commands with expected output, no placeholders, self-review against the spec. Adopt GStack habits: challenge scope, identify architecture/test/performance/security gaps, keep unresolved decisions visible, and require gates for risky work. Omit save-to-doc, telemetry, browser, and commit rules.

Planning Gate

No clear goal/scope -> use requirements-clarifier.
No evidence/work surface -> add discovery before implementation.
No gate -> no "ready to execute" claim.
No rollback for risky work -> mark blocked or discovery-first.
Sensitive/destructive boundary -> load agent-security-guard.

The Process

goal -> evidence -> risk -> phases -> gates -> tasks -> review -> handoff

Step 1: Establish the Planning Frame

Expected Output: objective=<one sentence>, scope=<in>, non_goals=<out>, constraints=<list>, unknowns=<blocking|assumed|deferred>

Define what the plan may solve. Pull from the request, requirements, issue, design doc, diff, logs, or release goal.

git status --short
git rev-parse --show-toplevel
rg -n "requirement|acceptance|scope|non-goal|TODO|FIXME|migration|release|rollback|flag" .

Frame format:

Objective:
In scope:
Non-goals:
Constraints:
Known unknowns:

If fails:

  • Objective or scope is unclear -> use requirements-clarifier.
  • Scope covers unrelated systems -> split into separate plans.
  • One-step edit -> produce a short checklist, not a phased plan.

Step 2: Inventory Evidence and Work Surface

Expected Output: artifacts=<paths>, work_surface=<files|systems>, dependencies=<internal|external>, test_surfaces=<commands|manual>

Plan from evidence. Identify what exists, what changes, what depends on it, and how success is observed.

git diff --name-status
git diff --stat
rg --files
rg -n "describe\\(|it\\(|test\\(|pytest|playwright|cypress|go test|cargo test|health|metric|alert" .

Evidence table:

| Area | Evidence | Plan impact |
|------|----------|-------------|
| <module/system> | <file/log/doc> | <task/risk/gate> |

If fails:

  • No evidence -> add a discovery phase with explicit output.
  • Too much surface -> narrow to affected paths, APIs, data, and tests.
  • Test surface is missing -> plan verification before implementation.

Step 3: Classify Plan Shape and Risk

Expected Output: plan_type=<implementation|migration|refactor|release|investigation|roadmap>, risk=<low|medium|high>, mode=<checklist|phased|discovery>

Choose the smallest plan shape that controls risk.

SignalPlan shape
Single safe changeChecklist
Multiple files/dependenciesPhased implementation
Unknown root causeInvestigation plan
Data, schema, compatibility, rolloutMigration/release
Product scope or timelineRoadmap with decision gates
Security, secrets, tenant, payment, shell, destructive actionSafety-gated

Risk scale:

RiskMeaning
LowLocal, reversible, covered by fast checks
MediumCross-module, user-visible, or test gaps exist
HighData loss, security, money, downtime, migration, external dependency, irreversible action

If fails:

  • Risk is high and rollback is unknown -> add discovery and rollback design first.
  • Plan type is mixed -> split by independent outcomes.
  • Security boundary appears -> load agent-security-guard.

Step 4: Decompose into Phases with Entry and Exit Criteria

Expected Output: phases=<ordered table>, entry=<criteria>, exit=<criteria>, gate=<verification>

A phase is not a topic. It needs a start reason and done proof.

| Phase | Goal | Entry criteria | Work | Exit criteria | Gate |
|-------|------|----------------|------|---------------|------|
| 0 Discovery | <unknown resolved> | <needed context> | <reads/probes/spike> | <decision/evidence> | <review/check> |
| 1 Build | <behavior> | <contract ready> | <tasks> | <tests pass> | <command> |

Rules:

  • Use discovery phase for unknowns that would change architecture or scope.
  • Put irreversible work after a checkpoint.
  • Keep each phase shippable, reversible, or marked not shippable.
  • Do not mix unrelated outcomes in one phase.

If fails:

  • Phase has no exit criteria -> add status, test, artifact, decision, or visible proof.
  • Phase depends on a later phase -> reorder or split.
  • Exit criteria require unavailable signals -> use observability-workflow.

Step 5: Map Dependencies, Risks, Gates, and Rollback

Expected Output: risk_table=<risk/mitigation/gate>, validation=<commands>, rollback=<points>

Every risky plan needs proof and an undo/stop path.

| Risk | Trigger | Mitigation | Gate | Rollback |
|------|---------|------------|------|----------|
| <risk> | <when it appears> | <prevention> | <proof> | <undo/stop> |

Check: data loss, schema drift, auth/tenant leak, secrets, shell/destructive command, downtime, performance, compatibility, flaky tests, external service, migration order, manual steps, stale assumptions.

Validation gates must name exact evidence:

Gate: `python -m pytest tests/path -q` -> selected tests pass.
Gate: staging health check returns 200 for `/health`.
Gate: migration dry run reports `0 destructive changes`.

If fails:

  • Risk lacks mitigation -> add task or reduce scope.
  • Gate says "verify manually" -> specify what to click, inspect, or observe.
  • Rollback impossible -> mark high risk and require approval before execution.

Step 6: Define Concrete Tasks and Sequencing

Expected Output: tasks=<ordered checklist>, parallel=<yes|no>, commands=<with expected output>, owner=<agent|user|external>

Tasks are execution units. They must name files, action, expected result, and verification.

Task format:

- [ ] P1.T1 <imperative task title>
  - Files: <exact paths or "discover in P0.T1">
  - Do: <specific change or investigation>
  - Verify: `<command>` -> <expected output>
  - Depends on: <task id|none>

Sequencing rules:

  • Write or identify tests before implementation when behavior changes.
  • For migrations, stage expand -> backfill -> switch -> contract unless local pattern differs.
  • Group tasks by dependency, not by file type.
  • Mark parallel lanes only when they share no write targets or ordering dependency.

If fails:

  • Task says "handle edge cases" or "add tests" -> replace with exact cases or test files.
  • File path is unknown -> make discovery a task, not a guess.
  • Two tasks can conflict on the same file -> sequence them or merge them.

Step 7: Review the Plan Before Execution

Expected Output: review=<pass|revise|blocked>, gaps=<list>, confidence=<low|medium|high>

Run self-review before claiming readiness.

Review checks:

  • Coverage: every requirement maps to a phase/task/gate.
  • Placeholder scan: no TBD, TODO, "later", "appropriate", "etc.", "similar to".
  • Consistency: task names, paths, APIs, and types agree across phases.
  • Tests: success, failure, boundary, regression, and security cases exist when relevant.
  • Risk: high-risk actions have rollback and gate.
  • Staleness: plan matches current branch, diff, and artifact state.
rg -n "TBD|TODO|later|appropriate|etc\\.|similar to|handle edge|add tests" .
git status --short

If fails:

  • Missing coverage -> add or revise tasks.
  • Placeholder remains -> replace with exact action, file, command, or decision.
  • Confidence is low on high-risk work -> use cross-model-verification.

Step 8: Handoff Execution and Update Loop

Expected Output: ready=<yes|with-assumptions|blocked>, next_action=<task id>, update_rule=<when plan changes>, residual=<risks>

End with an executable, updateable plan.

Objective:
Scope/non-goals:
Assumptions:
Phases:
Tasks:
Gates:
Rollback:
Open decisions:
Next action:
Status: ready=<yes|with-assumptions|blocked>

Update rule:

After each gate, update: completed, evidence, changed assumptions, new risks, next action.
If a gate fails, stop execution and revise the plan before continuing.

If fails:

  • Next action is vague -> pick the first task id and exact command/action.
  • ready=yes has open blockers -> change to ready=blocked.
  • Work is ready for code changes -> use git-workflow-for-agents.

Bad/Good Planning Patterns

Pattern 1: Milestone Without Exit Criteria

Bad:

Phase 1: Build backend.

Good:

Phase 1 exits when `POST /reports` returns 201, persists one row, and `pytest tests/reports -q` passes.

Pattern 2: Risk Without Rollback

Bad:

Run migration in production after tests pass.

Good:

Run dry-run, snapshot tables, deploy expand-only schema, verify old/new callers, then switch reads.

Pattern 3: Task Without Verification

Bad:

- [ ] Add validation and update UI.

Good:

- [ ] P2.T3 Add duplicate-name validation in `src/forms/project.ts`.
  - Verify: `npm test -- project-form.test.ts` -> duplicate name shows field error and submit is blocked.

Rationalization Table

RationalizationWhy it fails
"The plan can be high level"High-level plans hide files, tests, dependencies, and rollback.
"We'll figure tests out later"Test design changes sequencing and sometimes architecture.
"It's just a refactor"Refactors still break behavior, data shape, performance, and imports.
"Rollback is obvious"Rollback is real only when named and possible after each gate.
"Discovery is not progress"Discovery prevents committing to the wrong architecture or scope.
"Parallel work is faster"Parallel tasks sharing files or assumptions conflict.

Red Flags

  • You are planning before objective, scope, and non-goals are explicit.
  • A phase has no entry criteria, exit criteria, or validation gate.
  • A task lacks exact files, action, verification, or dependency.
  • Plan contains TBD, TODO, "later", "appropriate", "etc.", or "similar".
  • High-risk work has no rollback point.
  • Migration work lacks expand/backfill/switch/contract thinking.
  • Tests are deferred until after implementation without reason.
  • Manual verification lacks specific observable steps.
  • Plan says ready while blockers or unresolved decisions remain.

Common Pitfalls

SymptomRoot causeFix
Plan is long but not executableIt describes themes, not tasksConvert themes to task id, files, action, verify, dependency
Work starts then scope changesRequirements were not clarifiedUse requirements-clarifier before sequencing
Phase never finishesExit criteria are subjectiveAdd observable artifact, test, status, metric, or decision
Risk appears during executionDependencies and failure modes were not mappedAdd risk table before tasks
Rollback failsUndo path was assumedDefine checkpoint, dry run, backup, feature flag, or revert point
Parallel tasks collideShared files or assumptions were ignoredSequence conflicting tasks or assign one owner
Review rejects planPlaceholders and unverified assumptions remainRun Step 7 review and fix gaps before handoff

Verification Checklist

  • Description triggers on project, roadmap, migration, refactor, release, investigation, multi-step implementation, and risky change planning.
  • Objective, scope, non-goals, constraints, and unknowns are explicit.
  • Evidence and work surface are inspected before sequencing.
  • Plan shape and risk level are named.
  • Phases have entry criteria, exit criteria, dependencies, and gates.
  • Risks include mitigation, validation, and rollback.
  • Tasks include exact files or discovery tasks, action, verification, and dependencies.
  • Commands include expected output or manual checks name evidence.
  • Placeholder scan and coverage review are complete.
  • Handoff includes ready=yes, ready=with-assumptions, or ready=blocked and a concrete next action.

Interaction with Other Skills

Related SkillTriggerHandoff
requirements-clarifierGoal, scope, criteria, or constraints are vagueGet build-ready contract before planning
test-design-workflowBehavior changes need test strategyProvide criteria, phases, risks, test surfaces
systematic-debuggingInvestigation plan starts from an unreproduced failureReproduce and isolate before implementation tasks
observability-workflowGates need logs, metrics, traces, alerts, or health checksDefine signals as gates
agent-security-guardSecrets, auth, tenant, shell, payment, privacy, or destructive actions appearAdd safety gate before execution
cross-model-verificationPlan is high-risk, disputed, or low-confidenceRequest independent review of gaps and assumptions
git-workflow-for-agentsPlan execution changes filesManage branch, staging, commits, sync, PR hygiene
code-review-workflowPlan/implementation is ready for reviewUse criteria, tasks, gates as review baseline