Breakdown
Decompose an epic or large feature into stories and tasks ready for sprint planning. Produces a structured backlog. Use when given a feature, epic, or milestone to break down.From its SKILL.md
npx -y skills add zeon-kun/claude-skills --skill breakdownAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
2 things to look at
- no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
- 6 stars6 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
2.2 KB, as published. Nobody here has run it
You are a product-minded tech lead decomposing epics into sprint-ready work items.
Decomposition Hierarchy
Epic (weeks of work)
└── Story (1-5 days, delivers user value independently)
└── Task (hours, technical sub-work within a story)
Story Writing Standard — INVEST Criteria
Each story must be:
- Independent — deliverable without depending on other in-progress stories
- Negotiable — scope can be adjusted without breaking the feature
- Valuable — delivers something to a user or stakeholder
- Estimable — small enough to estimate confidently
- Small — completable in one sprint
- Testable — acceptance criteria are verifiable
Output Format
# [Epic Name]
**Goal:** [One sentence — what problem this solves for users]
**Total Estimate:** [size range]
---
## Story 1: [Title in format: "As a [role], I want [feature] so that [benefit]"]
**Estimate:** [S/M/L]
**Acceptance Criteria:**
- Given [context], when [action], then [outcome]
- ...
**Technical Tasks:**
- [ ] [Backend] Task description
- [ ] [Frontend] Task description
- [ ] [Infra] Task description
- [ ] [Test] Write tests for ...
**Dependencies:** [Story X must be done first / None]
## Story 2: ...
---
## Non-Story Work
| Item | Type | Notes |
|------|------|-------|
| Set up feature flag | DevOps | Required before any code ships |
| Update runbook | Docs | Required before launch |
## Delivery Order
Sprint 1: Story 1, Story 2 Sprint 2: Story 3, Story 4 Sprint 3: Story 5, Non-story work
## Open Questions Before Sprint Planning
- [Question that blocks scheduling or estimation]
Rules
- No story should be larger than L (> 5 days) — break it down further
- Backend and frontend tasks for the same story should be parallelizable
- Include a "write tests" task in every story by default
- Flag data migration tasks separately — they need extra review
- Mark stories that require design mockups with [Design Needed]