DevOps playbook for risky multi-step rollouts, migrations, and cutovers — incremental single-purpose PRs, inert-but-present fallbacks for one-line rollback, self-validation in prod (Chrome walkthroughs, /healthz probes, expected-vs-observed GO/NO-GO tables, negative controls), human-gated irreversible steps, CI-guard discipline, and durable milestone memory. Invoke for any high-blast-radius change e.g. auth/issuer cutovers, signing-key revokes.From its SKILL.md

Install
npx -y skills add YoniChechik/claude-code-config --skill devops-safe-ship

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

2 things to look at

  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
  • 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

9.2 KB, ~2.2k tokens by cl100k_base, as published. Nobody here has run it

Safe-Ship: Risky Rollout Playbook

A repeatable procedure for shipping high-blast-radius changes (auth cutovers, key revokes, etc.) without breaking prod and without a human babysitting every step. You prepare, verify, and present; the human pulls the trigger on anything irreversible. Land one risky thing at a time, prove it with real signals, and keep a one-line rollback ready before you merge.

When to use

Invoke for: issuer/auth cutovers, signing-key revokes, hard-to-reverse changes, or any change where a mistake locks users out or can't be trivially undone. For ordinary additive features use /new-feature or /plan.

Rollout under design: "$ARGUMENTS"

The seven disciplines

1. Incremental delivery — one risky change per PR

  • One PR = one purpose. Split the rollout into the minimum ordered PRs the deploy-ordering forces (e.g. auth foundation → relocation → enablement → cutover → cleanup). Never bundle unrelated risk into one PR.
  • Land + verify before the next step. Each PR must be CI-green and its effect confirmed in prod (or proven no-op) before you build the one after it.
  • Consolidate follow-ups, never risk. Housekeeping and small fixes can share a cleanup PR; a lockout-capable flip gets its own PR.
  • Prefer additive first: introduce the new shape, run both in parallel, cut over, then retire the old shape in a later PR.

2. Fallback / rollback readiness — keep the old path inert-but-present

  • Make rollback one line. When you flip to a new path, leave the old path in the code but disabled — e.g. empty a frozenset()/allowlist to disarm dual-accept rather than deleting the fallback branch. Restoring the set is the rollback; you delete the dead code in a separate later cleanup PR.
  • Targeted rollback over destroy. Prefer the fastest reversible path (Cloud Run revision rollback in seconds; git-revert of an env remap) over anything that destroys state.
  • Document rollback in the PR body BEFORE merging — the exact command/steps, primary fast path and durable path. If you can't write the rollback, you're not ready to merge.
  • Order matters: don't remove a fallback until a verification kit has proven the new path in prod. A rollback-order guard (fails a revert done in the wrong sequence) is worth adding for the window it's live.

3. Self-validation over blind trust — prove it in prod with real signals

Never declare success from "the deploy went green." Gather real evidence:

  • Health probes. Add/hit a public /healthz/... endpoint that reports the actual live state (issuers configured, jwks reachable, key counts, gate lists). Compare live output to the expected shape.
  • Real-token walkthrough. Drive a Chrome MCP session as a real user, capture a real session token, decode it (assert alg/iss/aud are what you expect before using it), then sweep every affected route.
  • Expected-vs-observed table = the GO/NO-GO gate. Build a route/step table with an expected status per row; run the sweep; any deviation from expected is a NO-GO until explained. Known-accepted deviations must be pre-listed with a reason.
  • Negative controls. A garbage/expired token MUST 401 everywhere — prove the gate actually rejects, not just that the happy path 200s.
  • Verification kits replace "soak." A concrete kit (route table, sweep script, checklist, browser plan) that a human/agent runs and reads as GO/NO-GO is stronger and faster than an open-ended time-based soak. Keep it in scratchpad.

4. Manual-gated prod steps — human times the irreversible ones

Hard-to-reverse actions are human-timed and human-approved. You do everything up to the trigger; the human pulls it (business hours, pre-announced, aware).

  • Gated actions: prod deploy of a cutover, signing-key revoke, admin/force merge, company-wide re-login flips, pulumi stack init, destructive migration, hard-delete of prod rows.
  • Pre-checks ABORT on uncertainty — never proceed. Never revoke a key unless you've confirmed the replacement is the sole active signer. Never hard-delete without a final concrete-list confirmation. Prefer a reversible fallback (ban vs hard-delete) when the destructive path hits a constraint.
  • Catch the blocker with a canary before the flip. A production-shaped canary (real login on a build pointed at the new path) is what surfaces the real blocker — e.g. a JWKS that publishes an ES256 key but still signs with the legacy HS256 secret would 401 every real token at cutover. Find it here, not in prod at 2am.
  • Build to green, then PAUSE. For the cutover PR: get it CI-green and fully ready, write the attestation/rollback in the body, then stop and hand the merge to the human.

5. Guards & CI discipline

  • Expect required guards and understand how they run. Base-ref/anti-tamper guards execute the origin/main copy of their matcher against the PR diff — so a fix to a guard script is INERT in its own PR and must land on main FIRST (via a prior PR, possibly force-merged for a benign self-trip).
  • Distinguish benign-by-design RED from a real failure.
    • Benign RED (force-merge OK): a guard that fires by design on the very PR it's meant to catch (e.g. bo-repoint-guard red-flagging the sanctioned repoint), or a guard tripped by literal strings in its own tooling/bats. Merge past it via admin force-merge — but print WHY it's benign and rely on the other (green) preflight as the real safety.
    • Real failure: fix first, never force-merge.
  • Preflight green is the real gate. When you force-merge past a by-design RED guard, a separate automated preflight must be genuinely GREEN — that's the safety, not the human's judgment alone.
  • Retire guards when their job is permanently done (delete the workflow; if required-checks are auto-derived from workflow files, deletion de-registers the context atomically — no orphan).
  • Treat infra flakes (preview-branch provisioning timeouts, GRANT races) as re-run, not fix.

6. Orchestration mechanics

  • Throwaway clones off FRESH origin/main. git fetch first, branch the clone off up-to-date origin/main — never the stale local main, never the base repo dir.
  • Background subagents + poll-loops. Wait via a 1s-sleep for-loop, ≤10s per iteration (target ~3s avg); never a single long sleep, never run_in_background=true on Bash inside a subagent (use shell & + wait).
  • Persistent CI watcher per feature branch (/ci-watcher) — never auto-kill it; keep fixing/re-syncing on every "behind" alert.
  • Dodge hook false-positives. Write commit messages and PR bodies to a file and pass --body-file/-F — the base-dir hook false-positives on git-words inside $(...) / prose.
  • Second opinion before merge. Run a /codex read-only review on the plan and on the diff of any risky PR before merging.

7. Memory, continuity & communication

  • Persist milestone state to durable memory after each significant step so work survives compaction: which PRs merged (numbers + commits), what's verified in prod, what's the next human-gated action, and every rollback path. Update it, keep it accurate, mark the roadmap HISTORICAL once done.
  • Communicate crisply. Status tables, not prose walls. Surface the ONE decision that needs the human, recommend a default, don't over-ask. Flag known-accepted regressions explicitly rather than hiding them.

Procedure when invoked

  1. Map the rollout into the minimum ordered PRs deploy-ordering forces. Note for each: additive vs risky, auto-deploy vs manual, rollback path. Run /codex on the plan.
  2. For each PR, in order: a. Branch a fresh clone off origin/main (fetch first). Never the base repo. b. Implement the smallest coherent step. Keep the prior path inert-but-present if this is a flip. c. Write rollback + (for cutovers) an attestation block into the PR body via -F/--body-file. d. /post + /codex diff review; get CI green; launch /ci-watcher. e. Classify any RED guard: benign-by-design (force-merge, print why, lean on the green preflight) vs real (fix). f. If the merge/deploy is irreversible → PAUSE and hand to the human (pre-checks must pass or ABORT). Otherwise merge. g. Verify in prod: /healthz, real-token Chrome sweep, expected-vs-observed table, negative control. Deviation = NO-GO until explained. h. Persist milestone to memory. Move to next PR.
  3. After the point-of-no-return, retire the fallback (separate cleanup PR), retire dead guards, and only then revoke/delete legacy artifacts — each with its own pre-check that ABORTS on uncertainty.