agentsclimarketplace

Sop dev work breakdown

Skill ygavrilov/plugin-personal-os/skills/sop-dev-work-breakdown

SOP to break approved scope into an executable Work Breakdown Document — a Foundation block plus Feature vertical slices (DB to API to UI), with task owners, blocked-by/blocks dependencies, critical path, and a parallelism map. Use when a worker is delegated a dev planning task, or asked to "break down the work", "produce a WBD", "sequence the critical path", "map parallel work". SDLC Phase 3. Best run by the lead tier.From its SKILL.md

Install
npx -y skills add ygavrilov/plugin-personal-os --skill sop-dev-work-breakdown

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

2 things to look at

  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

0.9 KB, as published. Nobody here has run it

SOP: break scope into a Work Breakdown Document (Foundation + Feature vertical slices + critical path + parallelism map).

Follow procedure.md exactly.

Read PROJECT_CONTEXT.md and the approved ADD first. Nothing outside Phase-1 scope may appear in the WBD. Output goes into the target repo. Single-worker leaf SOP — does not fan out. Best run by the lead tier.

Keep looking

Skills are one crate of 608,666. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.