Construction build and test
Skill yamatatsu/claude-aidlc/skills/construction-build-and-test
Generate build instructions and comprehensive test strategy for all units.From its SKILL.md
npx -y skills add yamatatsu/claude-aidlc --skill construction-build-and-testAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
2.7 KB, as published. Nobody here has run it
AI-DLC: Build and Test (Construction)
ultrathink
Generate comprehensive build and test instructions for all units. This stage runs once after all units complete code generation.
Prerequisites Check
- Read
aidlc-docs/aidlc-state.md— verify Code Generation is complete for ALL units - If any unit incomplete: Inform user which units need code generation. STOP.
- Log stage start in
aidlc-docs/audit.md
Execution
Follow build-and-test-detail.md:
Analysis
- Analyze testing requirements — determine appropriate strategy:
- Unit tests (already generated per unit)
- Integration tests (between units/services)
- Performance tests (if NFR requirements defined)
- E2E tests, contract tests, security tests (as needed)
Generate Instructions
- Build instructions →
aidlc-docs/construction/build-and-test/build-instructions.md- Prerequisites, dependencies, build steps, verification, troubleshooting
- Unit test instructions →
aidlc-docs/construction/build-and-test/unit-test-instructions.md - Integration test instructions →
aidlc-docs/construction/build-and-test/integration-test-instructions.md - Performance test instructions (if applicable) →
aidlc-docs/construction/build-and-test/performance-test-instructions.md - Additional tests (as needed):
- contract-test-instructions.md
- security-test-instructions.md
- e2e-test-instructions.md
Summary
- Generate test summary →
aidlc-docs/construction/build-and-test/build-and-test-summary.md
Completion
- Update
aidlc-state.md— mark Build and Test complete - Present comprehensive results:
- Build status
- Test results per category
- Generated files list
- WAIT for user approval: "Ready to proceed to Operations stage?"
- Log in audit.md
Reference Files
Critical Rules
- This runs ONCE for ALL units (not per-unit)
- Code Generation must be complete for ALL units before starting
- Generate appropriate test types based on project complexity
- Append to audit.md — never overwrite