MANDATORY planning protocol. You MUST invoke this skill when turning a decided goal into an execution plan — breaking a project or feature into sequenced tasks, milestones, or a roadmap; "plan this out", "what's the build order", "break this into steps". Do NOT hand back a flat to-do list. Do NOT bury the riskiest work in the middle. Invoke BEFORE presenting any multi-step plan. Does NOT apply to estimating effort (use estimation) or choosing between approaches (use decision-analysis).From its SKILL.md

Install
npx -y skills add xD4O/praxis --skill project-planning

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

SKILL.md

4.3 KB, as published. Nobody here has run it

Project Planning Protocol

EXTREMELY_IMPORTANT: This is a MANDATORY protocol, not a suggestion. Follow every step. Do not skip steps. Do not combine steps. Do not summarize. Work through each gate in order.

A plan is not a list of things to do — it is a sequence chosen so that failure is cheap, progress is visible, and nothing starts before what it depends on exists. A flat to-do list ordered by what came to mind first is the failure this protocol prevents.

STEP 1 — Decompose into done-able tasks

Break the goal into tasks. Apply the test to EACH: "Can I write a testable done-criterion — a state someone else could confirm is reached?" ("done when a request to /login returns a session cookie"). A task you cannot write a done-criterion for is not a task yet — split it, or if it is an open question move it to an unknowns list and mark it for a spike.

STEP 2 — Make dependencies explicit

For each task, name what must already exist before it can start. This ordering is forced by the work, not by preference. A task with no stated dependency is either genuinely foundational (say so) or you have not looked hard enough (look again).

STEP 3 — Pull the riskiest task to the front

Name the single task with the most uncertainty or the highest cost-if-wrong — the one most likely to invalidate the rest of the plan. It goes FIRST, or a timeboxed spike for it does, so a wrong assumption is caught while it is cheap to fix. If your sequence puts it late, re-sequence it or state explicitly why it cannot move earlier.

STEP 4 — Group into demonstrable milestones

Group tasks into milestones. Each milestone must be a state you could SHOW someone — "a user can log in and see their orders" — never an internal-progress label like "phase 1" or "auth 50% done". A milestone with no observable deliverable is a schedule, not a plan.

STEP 5 — Report

PLAN: [goal]
├── Tasks: [task → done-criterion, one line each; unknowns flagged]
├── Dependencies: [what-blocks-what, or "foundational" where none]
├── Riskiest-first: [the task/spike sequenced first, and why it dominates]
├── Milestones: [each a demonstrable state, in order]
└── Confidence: [HIGH / MEDIUM / LOW]

Confidence: HIGH — tasks all done-able, dependencies clear, riskiest work de-risked early. MEDIUM — some tasks rest on unknowns now scheduled as spikes. LOW — the riskiest task cannot be pulled forward, or several tasks resist a done-criterion.

<HARD-GATE> Do NOT present the plan until: - Every task has a testable done-criterion, or is a named unknown routed to a spike - The single riskiest task is sequenced first (or spiked), with that choice stated - Every dependency is explicit — no task's prerequisites are left implied - Every milestone is a demonstrable state, not an internal-progress label

A flat task list with no done-criteria and no risk-driven ordering is a protocol violation, even if the user asked for "just the steps".

Red flags that this skill catches:

  • "I'll just list the obvious steps in order" — order by risk and dependency, not by recall. That reordering IS the plan.
  • "The done-criteria are obvious, I don't need to write them" — unwritten done-criteria are where 'I thought that was finished' comes from. Write them.
  • "We'll tackle the hard part once the easy parts are done" — that is exactly backwards; the hard part decides whether the easy parts were worth doing.
  • "Milestone 1 is 'set up the project'" — set up toward what demonstrable state? Name it. </HARD-GATE>

Handoff

Once the plan is accepted, hand each milestone to execution. If effort or dates are needed, run estimation on the task breakdown first; if a task is a named unknown, run its spike before committing the milestones that depend on it.