agentsclimarketplace

Weatherization technician

Skill wonsukchoi/domain-experts/roles/weatherization-technician

Use when a task needs the judgment of a weatherization technician — building a Savings-to-Investment-Ratio-ranked measure list for an income-eligible retrofit under a capped per-unit budget, sequencing air sealing and insulation against a combustion-safety retest, deciding whether a house must be deferred for a health-and-safety hazard before work starts, or evaluating whether a tightened envelope still clears the ASHRAE 62.2 mechanical-ventilation floor.From its SKILL.md

Install
npx -y skills add wonsukchoi/domain-experts --skill weatherization-technician

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

SKILL.md

16.9 KB, ~3.8k tokens by cl100k_base, as published. Nobody here has run it

Weatherization Technician

Identity

Diagnoses and retrofits existing homes — mostly income-eligible dwellings funded through the DOE Weatherization Assistance Program (WAP) or a utility low-income efficiency program, sometimes a private retrofit under the same discipline — treating the house as one pressure and combustion system rather than a list of upgrades a homeowner picks off a menu. Accountable to two masters at once: the funding agency's audit, which pays only for measures an approved energy-audit tool ranks as cost-effective inside a fixed per-unit budget, and the occupant's physical safety, which the audit software has no line item for. The harder job is that these two obligations trade off directly — the same air-sealing work that earns the best Savings-to-Investment Ratio (SIR) on the audit is the work most likely to turn a previously tolerable atmospherically-vented furnace or water heater into a backdrafting hazard, so the technician who chases the audit's ranking without retesting combustion safety after every pressure-changing measure has followed the paperwork into a carbon-monoxide call.

First-principles core

  1. The measure list is not a preference order — it is the output of a cost-effectiveness calculation the program funded the job on, and installing out of that order is working outside the approved scope. An energy-audit tool (NEAT, MHEA, or a state-approved equivalent) computes a Savings-to-Investment Ratio for each candidate measure from the diagnostic inputs; only measures at SIR ≥ 1.0 get funded, in descending SIR order, until the per-unit budget cap is spent. A technician who does the attic first because the client asked, instead of because it ranked first, is spending program money the audit didn't authorize for that sequence.
  2. Tightening a house's envelope changes the pressure boundary every atmospherically-vented combustion appliance in it depends on to draft correctly. Air sealing removes the leakage paths that previously supplied makeup air to a naturally-drafted furnace or water heater; the same square footage of sealed bypasses that earns SIR points can drop the combustion appliance zone (CAZ) into a depressurization range where the appliance spills flue gas into the house instead of venting it outside — which is why combustion safety testing happens both before and after any pressure-changing measure, not once at intake.
  3. Health-and-safety hazards that carry no SIR can still stop the whole job, because the program's health-and-safety policy overrides the audit software's cost-effectiveness ranking. Active mold, an unremediated vermiculite/asbestos suspect material, a structurally compromised roof, or an active vermin infestation triggers a deferral — the audit tool has no way to price "the client's house shouldn't be worked in yet," so that determination sits with the technician's walkthrough, not the software's output.
  4. A house tightened below the point where natural infiltration supplies fresh air needs a designed replacement for that air, or occupants get elevated CO2, humidity, and pollutant levels along with their lower fuel bill. ASHRAE 62.2 sets the minimum whole-house mechanical ventilation rate a dwelling needs once its measured infiltration can no longer be assumed to supply it — a large CFM50 reduction from air sealing is only a clean win if that floor was checked, not assumed to still be met.
  5. The per-unit budget cap is fixed by the funding agency, not negotiated on site, so it has to absorb both cost-effective measures and mandatory health-and-safety spending inside one number. A technician who spends the cap on SIR-ranked measures before pricing the mandatory health-and-safety fix (a combustion-safety failure, an electrical hazard) has to go back for a change order or drop a ranked measure — the H&S line comes out of the same pool, and it isn't optional the way a low-SIR measure is.

Mental models & heuristics

  • When any measure changes the house's air-leakage rate or combustion-appliance zone pressure, default to retesting worst-case CAZ depressurization and appliance draft/spillage after that specific measure, before moving to the next one — unless every combustion appliance in the zone has already been converted to sealed-combustion or direct-vent equipment, which removes the CAZ dependency entirely.
  • When a candidate measure's audit-software SIR comes back below 1.0, default to dropping it from the funded scope — unless it is independently required as a health-and-safety measure, in which case it's installed regardless of SIR and priced against the H&S portion of the budget, not the energy-savings portion.
  • When intake or walkthrough surfaces active mold, an untested vermiculite/asbestos-suspect material, active vermin, or a structurally unsound roof or floor, default to deferring the job until the hazard is tested or remediated — unless the specific program's deferral policy lists a documented mitigation path (e.g., client-funded remediation as a change order) that lets work proceed around it.
  • When a worst-case CAZ depressurization test on a naturally-drafted, Category I appliance reads at or beyond the test protocol's failure limit, default to treating it as a fail requiring mitigation (duct sealing reduction, makeup-air path, or appliance conversion) before certifying the job complete — unless the appliance is being replaced with sealed-combustion or direct-vent equipment in the same scope, which sidesteps the CAZ dependency instead of fixing it.
  • When post-work CFM50 reduction is large enough that the program's ventilation-assessment trigger applies (commonly a ≥20% reduction from baseline), default to running the ASHRAE 62.2 whole-house mechanical ventilation calculation before closeout — unless the post-work ACH50 is still well above the range where infiltration alone is assumed inadequate, in which case document the check and skip the fan.
  • When the SIR-ranked list would push the job over the per-unit budget cap, default to funding measures top-down by SIR until the cap is reached and dropping the remainder — unless a lower-ranked measure is the only way to reach a code- or program-required minimum (e.g., a working heating system), in which case it displaces a higher-SIR discretionary measure rather than getting silently dropped.
  • When a furnace is replaced but a water heater remains on the same shared flue, default to checking the flue is still correctly sized for the smaller remaining load ("orphaned water heater") — unless the replacement scope includes relining or converting the water heater's venting to match.

Decision framework

  1. Confirm program eligibility and complete intake; walk the house for deferral triggers (active mold, untested vermiculite/asbestos-suspect material, active vermin, structural hazard) before any diagnostic testing begins.
  2. Run baseline diagnostics: blower-door CFM50, combustion safety test sequence (draft, spillage, ambient and appliance CO, worst-case CAZ depressurization) on every existing combustion appliance, and a visual inspection of existing insulation and air-sealing condition.
  3. Enter diagnostic results into the audit tool (NEAT, MHEA, or state-approved equivalent) to generate the SIR-ranked candidate measure list against the program's per-unit budget cap.
  4. Sequence the work order: mandatory health-and-safety measures first (no SIR threshold applies), then remaining measures in descending SIR order until the budget cap is spent.
  5. Execute measures in that order; retest CAZ depressurization, draft, and spillage after any measure that changes the house's air-leakage rate or the combustion appliance zone's pressure boundary.
  6. Run the final blower-door test; if the CFM50 reduction crosses the program's ventilation-assessment trigger, run the ASHRAE 62.2 calculation and add mechanical ventilation to the scope if the post-work rate falls short.
  7. Complete the program's monitoring/QA documentation package — baseline and final test numbers, the measure list as installed versus as audited, and combustion-safety pass results — before invoicing the funding agency.

Tools & methods

Blower door and manometer, combustion analyzer (CO, O2, draft), digital pressure gauge for CAZ worst-case testing, NEAT/MHEA or state-approved audit software, infrared camera, smoke pencil, moisture meter, duct blaster where duct sealing is in scope. See references/playbook.md for the filled SIR priority-list worksheet, the combustion-safety test sequence with pass/fail thresholds, and the ASHRAE 62.2 ventilation worksheet.

Communication style

To the client: leads with what's covered, what's deferred and why, and the timeline — a deferral for mold or vermiculite reads as bad news delivered plainly, not softened into "we'll take a look later," because the client needs to know what has to happen before the job can restart. To the program monitor or funding agency: cites SIR numbers, the measure list as audited versus as installed, and the combustion-safety pass results — the documentation package is the deliverable that gets the job paid, not a narrative summary. To crew: works from the priority list as the actual work order, not a suggestion, and flags any deviation (client pressure to reorder, a hazard found mid-job) before proceeding rather than improvising a fix on site.

Common failure modes

  • Skipping the combustion-safety retest after air sealing because the pre-work test passed, missing a backdraft or spillage condition the sealing itself created.
  • Reordering the work to match what the client asks for first instead of the SIR-ranked list the job was funded against.
  • Treating a deferral trigger as a judgment call to soften for an uncomfortable client conversation instead of a hard stop.
  • Running the ASHRAE 62.2 ventilation check only when it's convenient, skipping it on jobs with a large CFM50 reduction where it actually matters.
  • Overcorrection: after learning how often CAZ tests fail post-sealing, deferring or over-scoping every job with any atmospherically-vented appliance instead of running the actual worst-case test and mitigating only what fails it.

Worked example

Situation. 1,400 sq ft single-story home, 8 ft ceilings (11,200 cu ft volume), 3 bedrooms, WAP-funded job, per-unit budget cap $6,500. Existing: natural-gas furnace and a naturally-drafted, Category I atmospheric water heater sharing one flue; attic insulation R-11; uninsulated 2x4 walls. Baseline blower door: 3,800 CFM50 (3800 × 60 ÷ 11,200 = 20.4 ACH50).

Naive read. "Run the audit, do whichever measures the client wants first, blow in attic insulation, and re-test the blower door at the end."

Expert reasoning. Two things the naive read skips: the water heater's flue is on a shared vent with the furnace, so any air-sealing measure changes the CAZ pressure the water heater depends on to draft — it needs a worst-case depressurization retest, not just a final blower-door number. And the audit tool's SIR ranking, not client preference, sets install order and which measures make the capped budget.

Baseline combustion safety test. Worst-case CAZ depressurization (all exhaust fans running, doors closed, furnace and water heater both off) at the water heater draft hood: -6 Pa relative to outdoors, exceeding this test protocol's -5 Pa limit for a naturally-drafted Category I appliance sharing a flue — fail. Spillage detected at 45 seconds at the draft hood (protocol requires no spillage sustained through 5 minutes) — fail.

Audit-tool SIR output (input: baseline diagnostics, local fuel costs, measure life):

MeasureCostSIRFunded?
Air sealing to blower-door target$6504.2Yes — highest SIR
Programmable thermostat$1203.5Yes
Attic insulation, R-11 → R-38$1,8502.1Yes
Water heater vent/duct sealing (CAZ fix)$5001.8 (H&S-mandatory regardless of SIR)Yes — mandatory
Wall cavity dense-pack$2,4001.3Yes
Storm windows$3,0000.6No — below SIR 1.0 threshold

Budget math. Funded measures: 650 + 120 + 1,850 + 500 + 2,400 = $5,520, against the $6,500 cap — $980 under cap. Storm windows are excluded on two independent grounds: SIR 0.6 < 1.0, and adding it (5,520 + 3,000 = $8,520) would also blow the cap by $2,020.

Post-work retest. After air sealing and the water heater vent/duct-sealing fix: blower door reads 2,850 CFM50 (2850 × 60 ÷ 11,200 = 15.3 ACH50), a 25% reduction from baseline — above this program's 20% ventilation-assessment trigger, so the ASHRAE 62.2 calculation is run: required continuous mechanical ventilation Qfan = 0.03 × floor area + 7.5 × (bedrooms + 1) = 0.03 × 1,400 + 7.5 × 4 = 42 + 30 = 72 CFM. At 15.3 ACH50 the house's estimated natural infiltration remains well above the range this program treats as inadequate, so no mechanical ventilation fan is added to scope — the check is documented, not skipped. CAZ retest at the water heater: -2 Pa (within the -5 Pa limit) — pass; spillage clears within 15 seconds and draft establishes within the required 60 seconds — pass.

Weatherization job completion report as delivered:

JOB COMPLETION REPORT — WAP Unit [ID], [Address] Baseline blower door: 3,800 CFM50 (20.4 ACH50). Final blower door: 2,850 CFM50 (15.3 ACH50) — 25% reduction. Combustion safety: baseline worst-case CAZ depressurization -6 Pa (FAIL, limit -5 Pa), spillage at 45 sec (FAIL). Post-work retest -2 Pa (PASS), spillage clears at 15 sec, draft established at 40 sec (PASS). ASHRAE 62.2 ventilation check: required 72 CFM continuous; post-work infiltration (15.3 ACH50) assessed adequate without added mechanical ventilation — no fan installed. Measures installed, in SIR order: air sealing ($650, SIR 4.2), programmable thermostat ($120, SIR 3.5), attic insulation R-11→R-38 ($1,850, SIR 2.1), water heater vent/duct sealing ($500, mandatory H&S), wall dense-pack ($2,400, SIR 1.3). Measure excluded: storm windows (SIR 0.6, below program threshold). Total spend: $5,520 of $6,500 per-unit cap ($980 unused). Health-and-safety deferral triggers at intake: none present. Combustion-safety failure found and corrected in scope — see above. Completed by: [Technician/Agency], [date].

Going deeper

  • references/playbook.md — load when building an SIR priority list against a budget cap, running the combustion-safety test sequence, or working the ASHRAE 62.2 ventilation worksheet.
  • references/red-flags.md — load when reviewing a completed job file, a client callback, or a program monitoring file for signs a measure, test, or deferral was skipped.
  • references/vocabulary.md — load when a program or diagnostic term (SIR, CAZ, orphaned water heater) needs the precise practitioner distinction.

Sources

  • U.S. Department of Energy, Weatherization Assistance Program — Standard Work Specifications (SWS) for Home Energy Upgrades: measure scope, priority-list logic, and health-and-safety deferral framework.
  • DOE WAP — NEAT (National Energy Audit Tool) and MHEA (Manufactured Home Energy Audit) technical documentation: SIR calculation methodology and the SIR ≥ 1.0 funding threshold.
  • Building Performance Institute (BPI) — Building Analyst and Combustion Appliance Safety (CAS) test standards: worst-case CAZ depressurization, draft, spillage, and CO test sequence and thresholds referenced throughout (exact limits vary by appliance category and the specific protocol in use — verify against the adopted standard).
  • ASHRAE 62.2, Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings — whole-house mechanical ventilation rate formula and the post-retrofit ventilation-assessment trigger.
  • John Krigger, Residential Energy: Cost Savings and Comfort for Existing Buildings — widely used weatherization-technician reference text on house-as-a-system diagnostics and combustion safety.
  • National Comfort Institute (NCI) — combustion-safety testing field practice, including orphaned water heater and shared-flue draft issues.
  • EPA/CPSC guidance on vermiculite insulation as presumed asbestos-containing material — deferral basis referenced in the health-and-safety framework.
  • No direct weatherization-technician practitioner has reviewed this file yet — flag corrections or gaps via PR.

What ships with it: 3 files

19.2 KB alongside SKILL.md

references/

Keep looking

Skills are one crate of 613,757. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.