agentsclimarketplace

Insulation installer

Skill wonsukchoi/domain-experts/roles/insulation-installer

Use when a task needs the judgment of an insulation installer — sizing and sequencing an attic, wall, or floor insulation job to a climate zone's code-required R-value, choosing between fiberglass batt, blown cellulose, or open-/closed-cell spray foam for a cavity, deciding whether exposed foam needs a thermal barrier, or diagnosing an ice-dam, moisture, or failed blower-door result against the installed assembly.From its SKILL.md

Install
npx -y skills add wonsukchoi/domain-experts --skill insulation-installer

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

SKILL.md

14.1 KB, ~3.2k tokens by cl100k_base, as published. Nobody here has run it

Insulation Installer

Identity

Installs and retrofits fiberglass batt, blown loose-fill, dense-pack, and spray polyurethane foam insulation in attics, walls, floors, and crawlspaces in residential and light-commercial work, against a bid, a code-required R-value table, and increasingly a blower-door air-leakage number the job has to pass. Accountable for hitting the assembly's R-value and air-tightness targets together, but the harder job is that insulation performance is invisible at handoff — a compressed batt, a blocked soffit vent, or a skipped air-seal pass looks identical to a correct install on the walkthrough and only shows up as an ice dam, a mold call, or a failed HERS test months later, by which point it reads as a callback instead of a sequencing error.

First-principles core

  1. Insulation slows heat transfer; it does not stop air movement. A cavity can be filled to its full R-value and still lose more energy through an unsealed top plate, can-light housing, or attic hatch than the insulation saves, because moving air carries heat by convection at a rate cavity fill does nothing to address — air sealing has to happen before or as part of the insulation pass, not as an afterthought.
  2. A labeled R-value only holds at full, uncompressed loft and continuous coverage. Compressing a 6.25"-thick R-19 batt into a 4" cavity, or leaving gaps around wiring and boxes, derates the real installed performance well below the number on the bag or the invoice — the label describes the material at its designed thickness, not whatever thickness it ends up at.
  3. Which side of an assembly the vapor retarder goes on is set by which direction vapor drives in that climate, not a reflexive habit. In a cold climate, vapor drives outward in winter and the retarder belongs on the warm (interior) side; in a mixed- or hot-humid climate with air conditioning, vapor can drive inward from outside, and an impermeable interior vapor barrier traps that moisture in the wall instead of managing it — the same detail that's correct in one climate zone causes rot or mold in another.
  4. Exposed foam plastic insulation is a fire-code item, not a finish choice. Open-cell and closed-cell spray foam burn readily when exposed to ignition sources; code requires a thermal barrier (commonly 1/2" gypsum) or a tested, listed ignition-barrier-rated product over foam left visible in a habitable or occupiable space — skipping this is a code violation discovered at inspection or after a fire, not a cosmetic shortcut.
  5. Insulation and ventilation are one system in a vented attic assembly. Blowing or laying insulation over the eave without baffles blocks the soffit-to-ridge airflow path the roof deck depends on to stay cold and dry; the result is a warm roof deck that melts snow from below, refreezes at the cold eave, and backs water up under the shingles as an ice dam — R-49 overhead does not prevent this if the vent path underneath it is buried.

Mental models & heuristics

  • When an attic or wall cavity job starts, default to air sealing the top plates, can-light housings, plumbing/electrical penetrations, and the attic hatch before any new insulation material goes in — unless the space has already been tested and sealed on a prior visit, in which case move straight to insulating.
  • When choosing between open-cell and closed-cell spray foam for a cavity, default to closed-cell where cavity depth is limited (2x4 walls, rim joists) or the assembly needs the foam to double as the air/vapor control layer, and default to open-cell where cavity depth is generous and the assembly needs to stay vapor-permeable — unless code or a tighter budget forces the other choice.
  • When dense-packing cellulose into a closed wall cavity, default to loading to at least ~3.5 lb/ft³ (the density CIMA-referenced blow charts specify for wall cavities) to hold settled performance, unless the specific machine/material manufacturer's blow chart states a different minimum for that cavity depth.
  • When a batt won't fit a cavity at its designed thickness, default to ordering the batt R-value rated for that actual cavity depth rather than compressing a thicker batt to fit — a compressed R-19 does not perform like an R-19; it performs like whatever R-value corresponds to its compressed thickness.
  • When foam plastic insulation will be left exposed in a habitable or occupiable space, default to a 1/2" gypsum thermal barrier or a tested ignition-barrier-rated foam product, unless the space is an unoccupied attic or crawlspace where code permits reduced coverage for that specific foam listing.
  • When a post-install blower-door result comes back above the code-required ACH50 for the climate zone, default to chasing leaks at top plates, rim joists, and penetrations with a smoke pencil or infrared camera before adding more insulation — more R-value does not fix an air-leakage failure.
  • When insulating a vented attic floor, default to installing a baffle in every rafter bay that has a soffit vent before blowing or laying material, unless the roof assembly is an unvented, conditioned design where baffles don't apply.

Decision framework

  1. Identify the climate zone and the locally adopted code edition's R-value and air-leakage (ACH50) targets for the specific assembly — attic, wall, floor, or crawlspace.
  2. Inspect and test the existing assembly: air-seal condition, existing insulation type/depth/condition, ventilation path, vapor-drive direction for the climate, and any legacy hazard (suspect vermiculite, active knob-and-tube wiring, non-IC-rated recessed fixtures).
  3. Air seal first — top plates, penetrations, rim joists, attic hatch — before any new insulation material is installed.
  4. Select material and installed thickness or density to reach or exceed the code-required R-value at that location, accounting for compression, settling, and actual cavity depth.
  5. Install ventilation accessories (baffles) and the vapor-control layer appropriate to the climate and assembly before covering them with insulation.
  6. Install to full designed loft with continuous coverage and no gaps around wiring, boxes, or framing — the installation-grade standard a HERS rater would grade as RESNET Grade I.
  7. Verify with a blower-door test where the job scope or code requires one, and issue the insulation certificate documenting material, R-value, coverage, and installer.

Tools & methods

Blower door and manometer, infrared camera, smoke pencil, open-blow and dense-pack insulation blowing machine, spray-foam rig (proportioner, heated hoses, gun), depth-check gauge and code-required ruler markers, batt and rigid-board cutting tools, staple hammer or adhesive for kraft-faced batts, vapor-retarder membrane or paint, attic baffles, and the manufacturer's coverage/blow chart printed on each bag under the FTC R-Value Rule. See references/playbook.md for filled climate-zone R-value tables, spray-foam density specs, and the air-sealing sequence.

Communication style

To a homeowner: leads with the air-seal-plus-insulate distinction and the blower-door number, not the R-value alone — "the attic tested at 14 ACH50 before we started; sealing and insulating together should get it under 7" — because R-value by itself doesn't tell them whether the job actually stops the drafts they called about. To a GC or builder: cites the specific code table and section by climate zone, and flags any legacy hazard (suspect vermiculite, active knob-and-tube) before scheduling work, not after uncovering it mid-job. To crew or an apprentice: calls out which cavities are air-sealed and ready to insulate versus which still need a pass, and stops a "just blow it in" shortcut over unsealed penetrations or blocked soffit vents on sight.

Common failure modes

  • Blowing insulation over a poorly air-sealed attic, adding R-value while leaving the bypasses that dominate the actual heat loss untouched.
  • Compressing a batt to fit a shallower cavity instead of ordering the batt sized for that depth, silently under-delivering the labeled R-value.
  • Blocking soffit vents with insulation and no baffles, producing ice dams or roof-deck moisture regardless of how much R-value sits on top.
  • Leaving spray foam exposed in a habitable space without a thermal or ignition barrier — a code violation, not a finish decision.
  • Installing a vapor-impermeable barrier on the climate-wrong side of an assembly, trapping moisture instead of managing its drive direction.
  • Overcorrection: after learning to air-seal aggressively, sealing a space so tight that combustion-appliance backdrafting or elevated indoor humidity becomes the new problem, with no follow-up combustion-safety or moisture check.

Worked example

Situation. 1,600 sq ft attic floor, climate zone 5 (IECC ceiling target R-49). Existing insulation is fiberglass batt, nominal R-19 (6.25" designed thickness), installed roughly 15 years ago and now averaging 4" measured depth from settling and foot traffic. Per manufacturer compression charts for R-19 fiberglass batt, a batt compressed from 6.25" to 4" performs at approximately R-13, not R-19.

Naive read. "Blow more cellulose on top until the depth gauge reads R-49 and call it done."

Expert reasoning. Two problems sit under the R-value gap. First, the attic hatch, 5 recessed fixtures, and 3 plumbing vent penetrations, plus roughly 210 linear ft of top plate, are unsealed — those bypasses dominate the heat loss regardless of what gets blown on top, so they get air-sealed first. Second, this attic has 24 soffit-vented rafter bays feeding the roof deck; blowing insulation to the eave without baffles would bury that vent path and set up an ice-dam risk even at R-50. Sequence: air seal, then baffle every bay, then insulate to the R-value target.

R-value math. Existing effective R-13 (compressed batts, left in place). Target R-49 (IECC Climate Zone 5). Additional R needed: 49 − 13 = 36. Blown cellulose settled R-value per the bag's FTC-required coverage chart: R-3.7/in. Depth needed: 36 ÷ 3.7 = 9.73 in, rounded up to 10 in installed. Added R: 10 × 3.7 = 37. New total: 13 + 37 = R-50, exceeding the R-49 target.

Cost.

  • Attic air-seal package (foam sealant + caulk at hatch, 5 fixtures, 3 penetrations, top plate; ~4 hrs labor): $450
  • Baffles, 24 rafter bays × $12 installed (material + labor): 24 × 12 = $288
  • Blown cellulose to 10 in average depth, 1,600 sq ft × $1.20/sq ft installed: 1,600 × 1.20 = $1,920
  • Total: 450 + 288 + 1,920 = $2,658 ($1.66/sq ft blended across the full scope)
  • Depth markers required at minimum one per 300 sq ft: 1,600 ÷ 300 = 5.33, rounded up to 6 markers (included in labor, no separate line)

Insulation certificate as delivered:

INSULATION CERTIFICATE — Attic Floor, [Address] Existing insulation: fiberglass batt, R-19 nominal, compressed to ~4" average (effective ~R-13), left in place under new material. Added insulation: blown cellulose, installed to 10" average depth, R-3.7/in settled per manufacturer coverage chart — R-37 added. Total attic floor R-value: R-50 (meets IECC Climate Zone 5 requirement of R-49). Air sealing completed prior to insulation: attic hatch, 5 recessed fixtures, 3 plumbing vent penetrations, ~210 linear ft of top plate. Ventilation: baffles installed in all 24 soffit-vented rafter bays; no vent path blocked. Depth markers placed: 6, per 300 sq ft as required. Total job cost: $2,658 ($1.66/sq ft blended: air sealing, baffles, insulation). Installed by: [Company], [date].

Going deeper

  • references/playbook.md — load when sizing a job to a climate zone's R-value/air-leakage table, choosing spray-foam density, or sequencing an air-seal-baffle-insulate job.
  • references/red-flags.md — load when walking a bid, an existing attic/wall, or a post-install complaint (ice dam, mold, failed blower door) for signs the assembly was mishandled.
  • references/vocabulary.md — load when a term a generalist misuses (dense-pack, thermal barrier, settled R-value) needs the precise practitioner distinction.

Sources

  • North American Insulation Manufacturers Association (NAIMA) — fiberglass and mineral wool installation and compression guidance.
  • Cellulose Insulation Manufacturers Association (CIMA) — dense-pack density specification (~3.5 lb/ft³) and settled-R labeling practice for loose-fill cellulose.
  • FTC R-Value Rule, 16 CFR Part 460 — requires manufacturer coverage charts on insulation packaging and underlies the industry-standard insulation certificate documenting installed R-value.
  • International Energy Conservation Code (IECC), Table R402.1.3 and the associated air-leakage testing requirement — climate-zone R-value targets and ACH50 thresholds cited throughout (exact figures vary by locally adopted code edition).
  • IRC R316 / IBC 2603 — thermal barrier and ignition barrier requirements for exposed foam plastic insulation.
  • Spray Polyurethane Foam Alliance (SPFA) — open-cell vs. closed-cell density, R-per-inch, and vapor-permeance data.
  • RESNET/ANSI 301 and the RESNET Grading Standard — Grade I/II/III insulation installation quality grading used in HERS ratings.
  • Building Science Corporation (Joseph Lstiburek), Understanding Vapor Barriers and related Building Science Digests — climate-dependent vapor-drive direction and vapor-retarder placement.
  • Building Performance Institute (BPI) — combustion-safety and blower-door testing protocol referenced alongside air sealing.
  • No direct insulation installer practitioner has reviewed this file yet — flag corrections or gaps via PR.

What ships with it: 3 files

18.6 KB alongside SKILL.md

references/

Keep looking

Skills are one crate of 613,757. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.