agentsclimarketplace

Launch command

Skill varunk130/ai-gtm-skill-library/gtm-skills/launch-command

31 opinionated GTM skills for Claude Code & GitHub Copilot — a complete revenue engine spanning discover, design, position, amplify, launch, optimize, and RevOps phases.

Install
npx -y skills add varunk130/ai-gtm-skill-library --skill launch-command

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 3 stars3 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Launch orchestration and readiness assessment engine with cross-functional workstream tracking and go/no-go gates. Use when: launch readiness, launch checklist, launch orchestration, go no go, launch plan, are we ready to launch.

SKILL.md

10.1 KB, as published. Nobody here has run it

Launch Command (IGNITE Protocol)

A comprehensive launch orchestration engine that coordinates eight cross-functional workstreams through four progressive gates, producing a quantified readiness dashboard and executable launch day runbook. IGNITE ensures nothing ships without verified readiness across every dimension that determines launch success.

When to Use

  • Preparing for a product launch and need structured readiness tracking
  • Running a go/no-go decision meeting and need objective scoring
  • Coordinating multiple teams toward a shared launch date
  • Building a launch day runbook with hour-by-hour execution plan
  • Assessing whether a launch is ready to proceed or needs to slip
  • Post-gate review to identify workstreams that are falling behind
  • Transitioning from build phase to market-facing execution

What You'll Need

Critical inputs (ask if not provided):

  • Product name, target launch date, and launch type (GA, beta, feature, major release)
  • Target audience and market segment definitions
  • Positioning and messaging framework (from position-lock)
  • Sales enablement status and materials inventory
  • Marketing campaign plan and channel strategy (from demand-engine)
  • Analytics and measurement framework (from launch-pulse)

Nice-to-have:

  • Competitive landscape analysis (from battle-scanner)
  • Partner readiness status (from partner-blueprint)
  • Community/PLG strategy (from community-catalyst)
  • Budget allocation plan (from budget-allocator)
  • Customer journey maps (from journey-architect)
  • Previous launch debriefs and lessons learned

Process

Step 1: Define the Eight Launch Workstreams

Each workstream represents a critical dimension of launch readiness. Assign an owner and define 5-10 criteria per workstream.

#WorkstreamOwner RoleWeightDescription
1ProductProduct/Engineering20%Feature completeness, stability, performance, documentation
2PositioningProduct Marketing15%Messaging locked, value props validated, differentiation clear
3Sales EnablementSales/Revenue15%Battle cards, talk tracks, demo environments, pricing approved
4MarketingMarketing/Demand Gen15%Campaigns built, content ready, channels activated, PR queued
5PartnersPartnerships10%Partner communications, co-marketing assets, integration tested
6Community/PLGGrowth/Community10%Self-serve flow tested, community seeded, PLG hooks live
7OperationsOps/Support10%Support trained, SLAs defined, escalation paths, billing ready
8AnalyticsData/Analytics5%Dashboards live, tracking verified, baselines captured, alerts set

Step 2: Score Each Workstream

For each workstream, define 5-10 specific criteria and score each on the IGNITE readiness scale.

IGNITE Readiness Scale:

ScoreStatusDefinitionVisual
0Not StartedNo work begun, no owner assignedRed
1In ProgressWork underway but not complete, gaps remainOrange
2CompleteWork finished, awaiting verification or sign-offYellow
3VerifiedComplete, tested, reviewed, and approved by stakeholderGreen

Example: Product Workstream Criteria

#CriterionScore (0-3)EvidenceOwnerNotes
1All launch features code-complete
2QA sign-off with zero P0/P1 bugs
3Performance benchmarks met (latency, uptime)
4Security review completed
5API documentation published
6Migration/upgrade path tested
7Feature flags configured for staged rollout
8Rollback plan documented and tested

Workstream Readiness Score = (Sum of criteria scores) / (Number of criteria x 3) x 100%

Step 3: Four Progressive Gates

Each gate must be passed sequentially. A gate passes when its threshold conditions are met.

GateTimingNameThresholdKey Decisions
G1T-60 daysFoundationAll workstreams >= 25%Confirm launch date, lock scope, assign all owners
G2T-30 daysReadinessAll workstreams >= 50%, overall >= 60%Lock messaging, approve budget, begin pre-launch
G3T-7 daysConfidenceAll workstreams >= 75%, overall >= 80%Final go/no-go signal, activate campaigns
G4T-1 dayGo/No-GoAll workstreams >= 75%, overall >= 90%Ship or slip decision, launch day authorization

Gate Review Protocol:

  1. Each workstream owner presents 5-minute status update
  2. Score each criterion live with evidence
  3. Calculate workstream and overall scores
  4. Identify blockers and assign resolution owners with deadlines
  5. Gate decision: PASS (proceed) / CONDITIONAL (proceed with mitigations) / FAIL (remediate and re-review)

Step 4: Calculate Overall Launch Readiness

Overall Launch Readiness Index (LRI):

LRI = SUM(Workstream_Score_i x Weight_i) for i = 1..8

Decision Matrix:

LRI ScoreLowest WorkstreamDecisionAction
>= 90%All >= 75%GREEN: LaunchExecute launch day runbook
80-89%All >= 75%YELLOW: ConditionalLaunch with documented mitigations
80-89%Any < 75%ORANGE: RemediateFix lowest workstream, re-gate in 48h
70-79%Any scoreRED: DelaySlip launch 1-2 weeks, full re-plan
< 70%Any scoreBLACK: ResetMajor replanning required, new date TBD

Step 5: Build Launch Day Runbook

Create a day-by-day execution plan from T-7 through T+30.

Pre-Launch (T-7 to T-1):

DayActivitiesOwnerVerification
T-7Final gate review, campaign activation approvalPMMGate G3 pass
T-6Press embargo briefings begin, analyst outreachCommsBriefing tracker
T-5Sales team final enablement sessionSalesQuiz/cert scores
T-4Support team launch briefing, escalation drillSupportDrill completion
T-3Social media content queued, email campaigns stagedMarketingCampaign QA
T-2Feature flags verified, monitoring dashboards checkedEngineeringDashboard green
T-1Go/No-Go gate G4, war room setup, all-hands briefLeadershipG4 pass

Launch Day (T-0):

TimeActivityOwnerFallback
06:00Feature flags flipped, staged rollout beginsEngineeringRollback within 15 min
07:00Monitoring check: error rates, latency, uptimeSREAlert if >1% error rate
08:00Press embargo lifts, PR distributionCommsHold if product issues
09:00Blog post published, social media activatedMarketingPause if negative signal
10:00Email campaign sends begin (wave 1)Demand GenPause if deliverability <95%
12:00Midday status check, war room syncAll leadsEscalation if any RED
14:00Sales outreach begins to priority accountsSalesDelay if demo env unstable
16:00Community announcement, forum postCommunityModerate for issues
18:00End-of-day status, overnight monitoring planAll leadsOn-call rotation confirmed

Post-Launch (T+1 to T+30):

WindowFocusKey MetricsActions
T+1 to T+3StabilizationError rates, support tickets, adoptionHotfix if needed, respond to feedback
T+4 to T+7Early signalTraffic, signups, activation rateAmplify winning channels, pause underperformers
T+8 to T+14OptimizationPipeline, conversion rates, engagementA/B test messaging, optimize landing pages
T+15 to T+30AccelerationRevenue, retention, NPSScale winning plays, plan phase 2

Step 6: Risk Register and Contingency Plans

For each identified risk, document severity, probability, and mitigation.

RiskSeverity (1-5)Probability (1-5)Risk ScoreMitigationTriggerContingency
Product instability at scale5210Load testing, staged rollout>1% error rateRollback, hotfix
Competitive counter-launch339Embargo timing, rapid responseCompetitor announcementBattle card activation
Low initial adoption4312PLG optimization, outreach<50% of day-1 targetIncrease paid spend, sales push
Negative press coverage428Analyst prebriefs, messaging QANegative articleRapid response protocol
Support overwhelm339Pre-launch training, KB articles>2x ticket volumeSurge staffing, chatbot deflection

Output

Save to outputs/launch-command/

Deliverables:

  1. Launch Readiness Dashboard -- Overall LRI score, per-workstream scores, gate status, trend over time, RED/YELLOW/GREEN indicators per criterion
  2. Gate Checklists -- G1 through G4 detailed checklists with criteria, scores, evidence, and pass/fail determination for each gate review
  3. Launch Day Runbook -- Hour-by-hour T-7 through T+30 execution plan with owners, verification steps, fallback procedures, and escalation paths
  4. Post-Launch Protocol -- T+1 through T+30 monitoring plan, optimization triggers, debrief schedule, and handoff to growth-loop for ongoing retention

Chain Connections

  • Receives from: position-lock (messaging), demand-engine (channel strategy), enablement-forge (sales materials), journey-architect (touchpoints), partner-blueprint (partner readiness), community-catalyst (PLG strategy), budget-allocator (spend plan), launch-pulse (measurement framework), battle-scanner (competitive intel)
  • Feeds into: launch-pulse (activates measurement), growth-loop (handoff post-launch), launch-debrief (retrospective input)
  • Enhanced by: signal-radar (market timing signals), flywheel-sync (system health check pre-launch)

Keep looking

Skills are one crate of 328,083. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.