Launch command
Skill varunk130/ai-gtm-skill-library/gtm-skills/launch-command
31 opinionated GTM skills for Claude Code & GitHub Copilot — a complete revenue engine spanning discover, design, position, amplify, launch, optimize, and RevOps phases.
npx -y skills add varunk130/ai-gtm-skill-library --skill launch-commandAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 3 stars3 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
What its author says it does
Copied from the file, not written here
Launch orchestration and readiness assessment engine with cross-functional workstream tracking and go/no-go gates. Use when: launch readiness, launch checklist, launch orchestration, go no go, launch plan, are we ready to launch.
SKILL.md
10.1 KB, as published. Nobody here has run it
Launch Command (IGNITE Protocol)
A comprehensive launch orchestration engine that coordinates eight cross-functional workstreams through four progressive gates, producing a quantified readiness dashboard and executable launch day runbook. IGNITE ensures nothing ships without verified readiness across every dimension that determines launch success.
When to Use
- Preparing for a product launch and need structured readiness tracking
- Running a go/no-go decision meeting and need objective scoring
- Coordinating multiple teams toward a shared launch date
- Building a launch day runbook with hour-by-hour execution plan
- Assessing whether a launch is ready to proceed or needs to slip
- Post-gate review to identify workstreams that are falling behind
- Transitioning from build phase to market-facing execution
What You'll Need
Critical inputs (ask if not provided):
- Product name, target launch date, and launch type (GA, beta, feature, major release)
- Target audience and market segment definitions
- Positioning and messaging framework (from position-lock)
- Sales enablement status and materials inventory
- Marketing campaign plan and channel strategy (from demand-engine)
- Analytics and measurement framework (from launch-pulse)
Nice-to-have:
- Competitive landscape analysis (from battle-scanner)
- Partner readiness status (from partner-blueprint)
- Community/PLG strategy (from community-catalyst)
- Budget allocation plan (from budget-allocator)
- Customer journey maps (from journey-architect)
- Previous launch debriefs and lessons learned
Process
Step 1: Define the Eight Launch Workstreams
Each workstream represents a critical dimension of launch readiness. Assign an owner and define 5-10 criteria per workstream.
| # | Workstream | Owner Role | Weight | Description |
|---|---|---|---|---|
| 1 | Product | Product/Engineering | 20% | Feature completeness, stability, performance, documentation |
| 2 | Positioning | Product Marketing | 15% | Messaging locked, value props validated, differentiation clear |
| 3 | Sales Enablement | Sales/Revenue | 15% | Battle cards, talk tracks, demo environments, pricing approved |
| 4 | Marketing | Marketing/Demand Gen | 15% | Campaigns built, content ready, channels activated, PR queued |
| 5 | Partners | Partnerships | 10% | Partner communications, co-marketing assets, integration tested |
| 6 | Community/PLG | Growth/Community | 10% | Self-serve flow tested, community seeded, PLG hooks live |
| 7 | Operations | Ops/Support | 10% | Support trained, SLAs defined, escalation paths, billing ready |
| 8 | Analytics | Data/Analytics | 5% | Dashboards live, tracking verified, baselines captured, alerts set |
Step 2: Score Each Workstream
For each workstream, define 5-10 specific criteria and score each on the IGNITE readiness scale.
IGNITE Readiness Scale:
| Score | Status | Definition | Visual |
|---|---|---|---|
| 0 | Not Started | No work begun, no owner assigned | Red |
| 1 | In Progress | Work underway but not complete, gaps remain | Orange |
| 2 | Complete | Work finished, awaiting verification or sign-off | Yellow |
| 3 | Verified | Complete, tested, reviewed, and approved by stakeholder | Green |
Example: Product Workstream Criteria
| # | Criterion | Score (0-3) | Evidence | Owner | Notes |
|---|---|---|---|---|---|
| 1 | All launch features code-complete | ||||
| 2 | QA sign-off with zero P0/P1 bugs | ||||
| 3 | Performance benchmarks met (latency, uptime) | ||||
| 4 | Security review completed | ||||
| 5 | API documentation published | ||||
| 6 | Migration/upgrade path tested | ||||
| 7 | Feature flags configured for staged rollout | ||||
| 8 | Rollback plan documented and tested |
Workstream Readiness Score = (Sum of criteria scores) / (Number of criteria x 3) x 100%
Step 3: Four Progressive Gates
Each gate must be passed sequentially. A gate passes when its threshold conditions are met.
| Gate | Timing | Name | Threshold | Key Decisions |
|---|---|---|---|---|
| G1 | T-60 days | Foundation | All workstreams >= 25% | Confirm launch date, lock scope, assign all owners |
| G2 | T-30 days | Readiness | All workstreams >= 50%, overall >= 60% | Lock messaging, approve budget, begin pre-launch |
| G3 | T-7 days | Confidence | All workstreams >= 75%, overall >= 80% | Final go/no-go signal, activate campaigns |
| G4 | T-1 day | Go/No-Go | All workstreams >= 75%, overall >= 90% | Ship or slip decision, launch day authorization |
Gate Review Protocol:
- Each workstream owner presents 5-minute status update
- Score each criterion live with evidence
- Calculate workstream and overall scores
- Identify blockers and assign resolution owners with deadlines
- Gate decision: PASS (proceed) / CONDITIONAL (proceed with mitigations) / FAIL (remediate and re-review)
Step 4: Calculate Overall Launch Readiness
Overall Launch Readiness Index (LRI):
LRI = SUM(Workstream_Score_i x Weight_i) for i = 1..8
Decision Matrix:
| LRI Score | Lowest Workstream | Decision | Action |
|---|---|---|---|
| >= 90% | All >= 75% | GREEN: Launch | Execute launch day runbook |
| 80-89% | All >= 75% | YELLOW: Conditional | Launch with documented mitigations |
| 80-89% | Any < 75% | ORANGE: Remediate | Fix lowest workstream, re-gate in 48h |
| 70-79% | Any score | RED: Delay | Slip launch 1-2 weeks, full re-plan |
| < 70% | Any score | BLACK: Reset | Major replanning required, new date TBD |
Step 5: Build Launch Day Runbook
Create a day-by-day execution plan from T-7 through T+30.
Pre-Launch (T-7 to T-1):
| Day | Activities | Owner | Verification |
|---|---|---|---|
| T-7 | Final gate review, campaign activation approval | PMM | Gate G3 pass |
| T-6 | Press embargo briefings begin, analyst outreach | Comms | Briefing tracker |
| T-5 | Sales team final enablement session | Sales | Quiz/cert scores |
| T-4 | Support team launch briefing, escalation drill | Support | Drill completion |
| T-3 | Social media content queued, email campaigns staged | Marketing | Campaign QA |
| T-2 | Feature flags verified, monitoring dashboards checked | Engineering | Dashboard green |
| T-1 | Go/No-Go gate G4, war room setup, all-hands brief | Leadership | G4 pass |
Launch Day (T-0):
| Time | Activity | Owner | Fallback |
|---|---|---|---|
| 06:00 | Feature flags flipped, staged rollout begins | Engineering | Rollback within 15 min |
| 07:00 | Monitoring check: error rates, latency, uptime | SRE | Alert if >1% error rate |
| 08:00 | Press embargo lifts, PR distribution | Comms | Hold if product issues |
| 09:00 | Blog post published, social media activated | Marketing | Pause if negative signal |
| 10:00 | Email campaign sends begin (wave 1) | Demand Gen | Pause if deliverability <95% |
| 12:00 | Midday status check, war room sync | All leads | Escalation if any RED |
| 14:00 | Sales outreach begins to priority accounts | Sales | Delay if demo env unstable |
| 16:00 | Community announcement, forum post | Community | Moderate for issues |
| 18:00 | End-of-day status, overnight monitoring plan | All leads | On-call rotation confirmed |
Post-Launch (T+1 to T+30):
| Window | Focus | Key Metrics | Actions |
|---|---|---|---|
| T+1 to T+3 | Stabilization | Error rates, support tickets, adoption | Hotfix if needed, respond to feedback |
| T+4 to T+7 | Early signal | Traffic, signups, activation rate | Amplify winning channels, pause underperformers |
| T+8 to T+14 | Optimization | Pipeline, conversion rates, engagement | A/B test messaging, optimize landing pages |
| T+15 to T+30 | Acceleration | Revenue, retention, NPS | Scale winning plays, plan phase 2 |
Step 6: Risk Register and Contingency Plans
For each identified risk, document severity, probability, and mitigation.
| Risk | Severity (1-5) | Probability (1-5) | Risk Score | Mitigation | Trigger | Contingency |
|---|---|---|---|---|---|---|
| Product instability at scale | 5 | 2 | 10 | Load testing, staged rollout | >1% error rate | Rollback, hotfix |
| Competitive counter-launch | 3 | 3 | 9 | Embargo timing, rapid response | Competitor announcement | Battle card activation |
| Low initial adoption | 4 | 3 | 12 | PLG optimization, outreach | <50% of day-1 target | Increase paid spend, sales push |
| Negative press coverage | 4 | 2 | 8 | Analyst prebriefs, messaging QA | Negative article | Rapid response protocol |
| Support overwhelm | 3 | 3 | 9 | Pre-launch training, KB articles | >2x ticket volume | Surge staffing, chatbot deflection |
Output
Save to outputs/launch-command/
Deliverables:
- Launch Readiness Dashboard -- Overall LRI score, per-workstream scores, gate status, trend over time, RED/YELLOW/GREEN indicators per criterion
- Gate Checklists -- G1 through G4 detailed checklists with criteria, scores, evidence, and pass/fail determination for each gate review
- Launch Day Runbook -- Hour-by-hour T-7 through T+30 execution plan with owners, verification steps, fallback procedures, and escalation paths
- Post-Launch Protocol -- T+1 through T+30 monitoring plan, optimization triggers, debrief schedule, and handoff to growth-loop for ongoing retention
Chain Connections
- Receives from: position-lock (messaging), demand-engine (channel strategy), enablement-forge (sales materials), journey-architect (touchpoints), partner-blueprint (partner readiness), community-catalyst (PLG strategy), budget-allocator (spend plan), launch-pulse (measurement framework), battle-scanner (competitive intel)
- Feeds into: launch-pulse (activates measurement), growth-loop (handoff post-launch), launch-debrief (retrospective input)
- Enhanced by: signal-radar (market timing signals), flywheel-sync (system health check pre-launch)