agentsclimarketplace

Launch checklist

Skill tranhieutt/software_development_department/.claude/skills/launch-checklist

Generates a comprehensive software launch checklist covering technical readiness, customer communications, support, and go-live steps. Use when preparing for a product launch or when the user mentions launch checklist or go-live readiness.From its SKILL.md

Install
npx -y skills add tranhieutt/software_development_department --skill launch-checklist

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

SKILL.md

8.5 KB, ~1.8k tokens by cl100k_base, as published. Nobody here has run it

When this skill is invoked:

Explicit invocation only: This skill should only run when the user explicitly requests it with /launch-checklist. Do not auto-invoke based on context matching.

  1. Read the argument for the launch date or dry-run mode. Dry-run mode generates the checklist without creating sign-off entries.

  2. Gather project context:

    • Read CLAUDE.md for tech stack, release surfaces, and team structure
    • Read the latest milestone in production/milestones/
    • Read any existing release checklist in production/releases/
    • Read any launch, support, or communications notes in docs/launch/, docs/runbooks/, or production/releases/ if they exist
  3. Scan codebase health:

    • Count TODO, FIXME, HACK comments and their locations
    • Check for any console.log, print(), or debug output left in production code
    • Check for placeholder assets or copy (search for placeholder, temp_, WIP_)
    • Check for hardcoded test/dev values (localhost, test credentials, debug flags)
  4. Generate the launch checklist:

# Launch Checklist: [Product Title]
Target Launch: [Date or DRY RUN]
Generated: [Date]

---

## 1. Code Readiness

### Build Health
- [ ] Clean build or release artifact generated for all target surfaces
- [ ] Zero release-blocking compiler or linter errors
- [ ] All unit tests passing
- [ ] All integration tests passing
- [ ] End-to-end or smoke tests passing for critical user journeys
- [ ] Schema migrations tested with rollback or recovery plan
- [ ] Release version correctly set and tagged in source control
- [ ] Performance and reliability benchmarks within agreed targets

### Code Quality
- [ ] TODO count: [N] (zero required for launch, or documented exceptions)
- [ ] FIXME count: [N] (zero required)
- [ ] HACK count: [N] (each must have documented justification)
- [ ] No unintended debug output in production code
- [ ] No hardcoded dev/test values
- [ ] All feature flags reviewed for launch defaults
- [ ] Error handling covers all critical paths
- [ ] Crash reporting and structured logging integrated and verified
- [ ] Dependency vulnerabilities triaged and accepted risk documented

### Security and Privacy
- [ ] No exposed API keys or credentials in source or build artifacts
- [ ] Authentication, authorization, and input validation verified on public endpoints
- [ ] Network communication secured (TLS, signed webhooks, secret rotation as applicable)
- [ ] Abuse protection, rate limiting, or bot controls enabled where required
- [ ] Privacy policy and data handling compliance verified
- [ ] Backup and restore path validated for stateful systems

---

## 2. Product Readiness

### Functional Scope
- [ ] All launch-scope features implemented or explicitly deferred
- [ ] Critical user journeys tested end-to-end
- [ ] Admin, support, and internal operational workflows verified
- [ ] Billing, notifications, integrations, and webhooks tested if applicable
- [ ] Data import/export, retention, or deletion flows verified if applicable
- [ ] Release notes and known issues drafted

### UX, Content, and Localization
- [ ] All placeholder copy and visuals replaced
- [ ] All user-facing text proofread
- [ ] No hardcoded strings (all externalized for localization)
- [ ] All supported languages translated and verified
- [ ] Text fits UI in all supported languages
- [ ] Help content, onboarding, and empty states reviewed
- [ ] Customer-facing documentation links are current

---

## 3. Quality Assurance

### Testing
- [ ] Full regression test suite passed
- [ ] Zero Sev1 (Critical) bugs open
- [ ] Zero Sev2 (High/Major) bugs open, or documented exceptions with owner approval
- [ ] Smoke test passed in staging or release candidate environment
- [ ] User acceptance or stakeholder sign-off captured
- [ ] Edge cases tested (no network, expired session, low storage, rate limits, retries)
- [ ] Backup/restore or disaster recovery drill completed if applicable

### Accessibility and Compliance
- [ ] Accessibility basics covered for target surfaces
- [ ] Consent, privacy, and legal notices reviewed
- [ ] Audit logging or regulated workflow checks verified if required
- [ ] App store or platform policy requirements met, if applicable

### Performance and Reliability
- [ ] Response time or startup time within budget
- [ ] Memory and CPU usage within budget
- [ ] Queue lag, background jobs, and async workflows within targets
- [ ] No sustained error-rate spikes during release candidate soak window
- [ ] Capacity and scaling assumptions reviewed for launch traffic

---

## 4. Distribution and Customer-Facing Assets

### Release Assets
- [ ] Changelog complete and proofread
- [ ] Release notes complete and customer-appropriate
- [ ] Version numbers aligned across app, API, docs, and packaging
- [ ] Download links, package names, or deployment targets finalized

### Launch Communications
- [ ] Status page messaging prepared
- [ ] Customer announcement drafted
- [ ] In-app banner, modal, or changelog entry prepared if needed
- [ ] Support macros / FAQ updated
- [ ] Sales, customer success, and internal stakeholders briefed

### Public Metadata
- [ ] Marketing site or product page copy updated
- [ ] Screenshots or release visuals current
- [ ] Pricing, packaging, and plan entitlements verified
- [ ] App store listing metadata current, if applicable

---

## 5. Infrastructure

### Production Readiness
- [ ] Production infrastructure provisioned and sized for launch
- [ ] Database backups configured and restore tested
- [ ] CDN, cache invalidation, and asset delivery configured where applicable
- [ ] Feature flag rollout strategy documented
- [ ] Secrets and access reviews completed
- [ ] Deployment and rollback runbooks current

### Analytics and Monitoring
- [ ] Analytics pipeline verified and receiving expected events
- [ ] Crash reporting active and dashboard accessible
- [ ] Monitoring dashboards live for core technical and business metrics
- [ ] Alerts configured for critical thresholds
- [ ] Incident escalation path and owners documented

---

## 6. Support and Operations

### Team Readiness
- [ ] On-call schedule set for first 72 hours post-launch
- [ ] Incident response playbook reviewed by the team
- [ ] Hotfix pipeline tested
- [ ] Communication plan for launch issues documented
- [ ] Support team briefed on known issues and escalation path

### Launch Day Plan
- [ ] Go-live sequence documented step by step
- [ ] Rollback decision criteria documented
- [ ] War room or launch channel established
- [ ] Launch monitoring dashboard bookmarked by all leads
- [ ] Checkpoint times defined for launch-day review

---

## Go / No-Go Decision

**Overall Status**: [READY / NOT READY / CONDITIONAL]

### Blocking Items
[List any items that must be resolved before launch]

### Conditional Items
[List items that have documented workarounds or accepted risk]

### Sign-Offs Required
- [ ] Product Owner - Scope and customer readiness
- [ ] Engineering Lead - Technical health and stability
- [ ] QA Lead - Quality and test coverage
- [ ] Release Manager - Deployment and rollback readiness
- [ ] Security / Compliance Owner - Security and data handling
- [ ] Support Lead - Support and incident readiness
  1. Save the checklist to production/releases/launch-checklist-[date].md, creating directories as needed.

  2. Output a summary to the user: total items, blocking items count, conditional items count, departments with incomplete sections, and the file path.

Protocol

  • Question: Reads launch date or dry-run argument; gathers context from CLAUDE.md and milestone files
  • Options: Skip
  • Decision: Skip - checklist is generated; Go/No-Go is advisory
  • Draft: Summary statistics shown before saving
  • Approval: "May I write to production/releases/launch-checklist-[date].md?"

Output

Deliver exactly:

  • Checklist file saved to production/releases/launch-checklist-[date].md
  • Summary: total items / blocking count / conditional count / incomplete departments
  • Verdict: GO / CONDITIONAL GO / NO-GO with blocking items listed

What ships with it

Read from the repository

Just SKILL.md. No reference files, no scripts.

Keep looking

Skills are one crate of 326,852. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.