Otto
A curated collection of agent skills
npx -y skills add tjmaynes/skills --skill ottoAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 3 stars3 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
What its author says it does
Copied from the file, not written here
Use for significant coding work that should move from idea to approved design, approved implementation plan, and automated build execution. Do not use for read-only review, quick one-file edits, direct bug fixes with an obvious patch, exploratory questions, or tasks where the user only wants planning.
SKILL.md
8.7 KB, as published. Nobody here has run it
Otto
Inspired by established agentic design/planning/build workflows.
Otto is a unified workflow with three artifacts in sequence:
design.mdplan.mdbuild.md
Default output path:
.agents/tasks/<YYYY-MM-DD>-<feature-short-name>/
Logic Flow
flowchart TD
A[User request] --> B[Explore repository context]
B --> C{Scope fits one task?}
C -- No --> D[Decompose into smaller task]
D --> B
C -- Yes --> E[Design stage]
E --> F[Write design.md]
F --> G{User approves design?}
G -- No --> E
G -- Yes --> H[Plan stage]
H --> I[Write plan.md]
I --> J[Score Design+Plan Confidence]
J --> K{User approves plan?}
K -- No --> H
K -- Yes --> L{Confidence >= 95% and no hard-fails?}
L -- Yes --> M[Ask autobuild prompt]
L -- No --> N[Autobuild unavailable; continue gated mode]
M --> O[Branch, commit design+plan, push]
N --> O
O --> P{Pre-build gate passes?}
P -- No --> Q[Block build and resolve]
Q --> O
P -- Yes --> R[Build stage]
R --> S[Score Build Confidence]
S --> T{Build Confidence >= 90%?}
T -- No --> U[Manual phase-by-phase mode]
T -- Yes --> V[Automated phase execution]
U --> W[Execute phase with fresh validation]
V --> W
W --> X{Validation passes?}
X -- No --> Y[Pause, fix or clarify]
Y --> W
X -- Yes --> Z[Update plan.md and build.md]
Z --> AA[Commit and push phase]
AA --> AB{More phases?}
AB -- Yes --> S
AB -- No --> AC[Final summary]
Hard Gates
- Never start Build until Design and Plan are approved.
- Never start Build until branch, commit, and push gates pass.
- Never bypass quality validation for a completed phase.
- Never continue automated build execution when build validation fails or request clarity is missing.
Workflow
Stage 1: Design
Before starting Design, read:
- Explore codebase context (files, docs, recent commits, conventions).
- Assess whether the request must be decomposed before design.
- Ask one clarifying question at a time.
- Propose 2-3 approaches with tradeoffs and a recommendation.
- Present design sections incrementally and collect approval.
- Write
design.mdat the run path. - Run a self-review pass (ambiguity, contradictions, placeholders, scope).
- Ask user to approve final
design.md.
Design output must include:
- Goal
- Success criteria
- Constraints
- Scope / non-goals
- Chosen approach and alternatives considered
- Architecture and component boundaries
- Data flow
- Error handling
- Test strategy
- Risks and mitigations
- Planning inputs
Stage 2: Plan
Before starting Plan, read:
- Use approved
design.mdas source of truth. - Detect stack, quality tools, and validation commands from repo docs first.
- Fill only plan-blocking gaps with targeted questions.
- Research current practices when local docs and code patterns are insufficient.
- Explore codebase patterns, integration points, and local technical debt.
- Assess whether bootstrap or refactor phases are required.
- Define architecture, data flow, contracts, and error handling.
- Produce phase-based plan with dependencies, estimates, and Definition of Done.
- Detail code deltas and test-first task structure.
- Score Design+Plan Confidence.
- Write
plan.md, self-review it, and ask user for approval.
Plan requirements:
- Phase list with estimates and dependencies
- Architecture and implementation decisions
- Research findings when external or version-sensitive guidance was needed
- Integration points and affected files
- Bootstrap/refactor phases when required
- Task checklist per phase
- Test-first steps per task
- Validation commands per phase
- Phase status fields that can be updated during Build
- Checkpoint notes for context management
Planning protocol details live in PLANNING-PROTOCOL.md.
Confidence Model
Otto tracks two confidence scores.
A) Design+Plan Confidence
Purpose: governs whether Autobuild mode can be offered.
- Combined method: hard-fails + rubric scoring.
- Compute at:
- end of Design
- end of Plan
- If hard-fail exists, confidence cannot reach 95%.
Threshold behavior:
- If
>=95%and no hard-fails, ask exactly:Confidence is X%. Do you want to run in autobuild mode?
- If
<95%, state explicitly that Autobuild is unavailable below threshold.
Rubric details live in CONFIDENCE-RUBRIC.md.
B) Build Confidence
Purpose: hard gate for build execution readiness.
- Compute immediately before build kickoff and before each phase.
- If
<90%: do not run automated build execution. Fall back to manual phase-by-phase mode. - If
>=90%: automated phase execution is allowed.
Branch / Commit / Push Gate (Required Before Build)
After user approves plan.md, Otto must automatically:
- Verify GitHub CLI access with
gh auth statuswhen the repository is hosted on GitHub. - Inspect repository identity with
gh repo view --json nameWithOwner,urlwhen available. - Create or switch to branch
<feature-short-name>. - Ensure
design.mdandplan.mdexist in run directory. - Commit those files with:
chore: add initial design.md and plan.md files for feature "<feature-short-name>"
- Push the branch to remote and set upstream.
- Confirm remote branch visibility with
gh repo vieworgit ls-remote --heads origin <feature-short-name>.
Use git CLI for local branch, commit, and push operations. Use gh for GitHub repository lookup, authentication checks, PR/issue lookup, and remote confirmation.
If any of these fail, Build is blocked until resolved.
Stage 3: Build
Build executes the approved plan.md and writes evidence to build.md.
Before starting Build, read:
Execution Policy
- Preferred mode: automated phase execution.
- Run sequentially by default.
- For clearly independent tasks/phases, require parallel execution.
- Pause only when:
- validation fails
- ambiguity blocks safe execution
- user clarification is required
- repository, branch, or dependency state is unsafe
Per-Phase Protocol
For each phase:
- Read phase scope, dependencies, tasks, Definition of Done, and validation commands.
- Run critical plan review for the phase.
- Confirm Build Confidence
>=90%. - Mark the phase in progress in
plan.md. - Execute task checklist in dependency order.
- Enforce test-first order for every code-changing task.
- Run fresh validation evidence for tests, lint, format, and type/build checks.
- Update
plan.mdafter validation passes. - Append phase outcome and evidence to
build.md. - Commit phase changes with a conventional commit message.
- Push the branch and confirm remote visibility.
- Continue automatically only if validation passed and Build Confidence remains
>=90%.
Before running validation, read scripts/README.md if the stack is unclear or the default validator does not match the repository.
Build Log Must Capture
- Timestamped phase summary
- Build mode and Build Confidence score
- Commands executed for verification
- Validation pass/fail results
- Files changed
- Commit message(s)
- Push result
- Open issues / follow-up actions
Script Resources
scripts/validate-phase.sh: validates linter, formatter, type checks, and tests for common stacks.scripts/README.md: script usage and expected behavior.
Safety Rules
- No destructive git operations unless explicitly requested by user.
- No skipped validations for “small” changes.
- No build continuation after failed validation without remediation.
- No hidden assumptions: surface blockers immediately.
Completion
The workflow is complete when:
- All planned phases are done.
- Validation passes for each completed phase.
build.mdis complete and current.- User receives a concise summary of results, risks, and next steps.