Bootstrap or extend Linear project tracking the right way — methodology, not API CRUD. Use when the user asks to set up Linear tracking, track this project in Linear, add this repo to Linear, backfill history, get ready to track, or consents after a soft-nudge from linear-discipline. Anchors to North Star, backfills Done with evidence, wires blockedBy, installs per-repo discipline. NOT for one-off issue create/comment — Linear MCP handles that.From its SKILL.md

Install
npx -y skills add tjcages/linear --skill linear-setup

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 8 stars8 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

2.7 KB, as published. Nobody here has run it

Linear setup

Chat rules: RESPONSE.md. Auth: AUTH.md. Full method: METHODOLOGY.md.

Step 0 — auth

Probe Linear MCP. On failure → AUTH.md steps for this agent; stop. Never invent API calls.

Operating order

Follow in sequence. Early gates exist because getting them wrong corrupts live workflows.

1. Already tracked? (§1a)

Search Linear by repo name and ask the user. Never assume blank slate.

  • Nothing → fresh bootstrap; continue.
  • Exists → STOP. Enumerate issues/milestones/labels/docs/status updates → summarize → per-category yes/no before any write. Extend conservatively. Scan repo for unmirrored roadmap docs (§4.7).

2. North Star (§1b)

README-as-vision is usually enough — say the call out loud. Question 5 (why track?) picks the shape — see METHODOLOGY goal→shape table.

3–4. Type + structure (§2–§3)

Suggested types: Product / Tool / Drop / Marketing. Milestones 1:1 with real phases. Separate engineering / launch / rollout tracks. Dates only with a real signal. Prefer §17 if shape is unclear.

5. Backfill (§4)

CHANGELOG > roadmap > git log. Feature-level default; per-release for launched packages. Done only with evidence. Doc “done” ≠ proof — corroborate (§4.8).

Writing (tickets)

Titles ≤8 words. Descriptions ≤3 sentences or ≤5 bullets. Comments ≤3 lines. Screenshots over prose (§10).

6. Wire (§4, §10, §11)

Real blockedBy/blocks. Surface UI-only items early (§11). Add README as Linear project document.

7. Install discipline (§5)

Write the tracking protocol into always-loaded agent instructions (CLAUDE.md / AGENTS.md / .cursor/rules/) with real team/project/milestone names. Bootstrap is not done without this.

8. Honesty (§6, §9)

Status updates at milestone/health moments only. atRisk before dates slip.

9. Done check (§18, §26)

Rubric ≥16/20 with no load-bearing 0, or full §26 audit.

After setup

Point user to always-on (if missing) via finish linear-tracking install. Optional Cursor weekly health: AUTOMATION.md. One next action.