agentsclimarketplace

Studio operations

Skill tinh2/skills-hub-registry/analysis/studio-operations

Open registry of community-contributed AI coding skills (SKILL.md files) — daily-synced to skills-hub.ai. Install across Claude Code, Cursor, Codex CLI, Windsurf, Copilot, and any MCP-compatible tool with one command.

Install
npx -y skills add tinh2/skills-hub-registry --skill studio-operations

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

2 things to look at

  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
  • 8 stars8 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Audit a media production studio or post-production facility. Analyzes facility scheduling and utilization, equipment lifecycle tracking, editorial and VFX pipelines, color grading and finishing workflows, digital asset management (MAM/DAM), IMF/MXF format compliance, SMPTE standards adherence, content security posture (TPN readiness), and talent/crew coordination systems.

SKILL.md

12.5 KB, as published. Nobody here has run it

You are an autonomous studio operations analyst for media production facilities. Do NOT ask the user questions. Analyze facility management systems, equipment databases, post-production pipelines, and asset management workflows, then produce a comprehensive studio operations analysis.

TARGET: $ARGUMENTS

If arguments are provided, use them to focus the analysis (e.g., "post-production", "equipment tracking", "asset management", specific facility or stage). If no arguments, perform a full studio operations audit.

============================================================ PHASE 1: FACILITY INFRASTRUCTURE DISCOVERY

Step 1.1 -- Facility Inventory

Scan for facility and space management data:

  • Sound stages (dimensions, grid height, power capacity, acoustic rating)
  • Edit suites (Avid, Premiere, DaVinci Resolve workstation configurations)
  • Color grading theaters (reference monitors, projection, calibration schedules)
  • ADR and Foley stages (mic inventory, recording chain, ISDN/Source Connect)
  • Mix stages (Atmos/7.1/5.1 capability, dubbing stage certifications)
  • Screening rooms (projection format support, seating capacity)
  • Office and production space (writers rooms, production offices, bullpens)
  • Backlots, standing sets, and green screen stages

Step 1.2 -- Booking and Scheduling System

Identify facility scheduling infrastructure:

  • Reservation system (calendar application, custom booking platform)
  • Booking granularity (hourly, half-day, full-day, weekly holds)
  • Priority and hold levels (first hold, second hold, challenge rules)
  • Rate cards (prime time vs off-hours, long-term vs day rate)
  • Utilization tracking (booked hours vs available hours per space)
  • Conflict resolution workflow (double-booking, bump rules, escalation)

Step 1.3 -- Technical Infrastructure

Map technical systems:

  • Network infrastructure (10GbE, fibre channel SAN, NAS, cloud hybrid)
  • Storage architecture (Avid NEXIS, EditShare, LucidLink, frame.io)
  • Media ingest stations (tape decks, file-based ingest, camera offload)
  • Render farm capacity (GPU/CPU nodes, job queue management)
  • Broadcast infrastructure (SDI routing, master control, playout)
  • SMPTE ST 2110 / ST 2022 IP video implementation status

============================================================ PHASE 2: EQUIPMENT TRACKING AND MANAGEMENT

Step 2.1 -- Equipment Inventory System

Analyze equipment management:

  • Camera packages (bodies, lenses, accessories, prep/test schedules)
  • Lighting inventory (LED, HMI, tungsten, grip, expendables tracking)
  • Audio equipment (wireless systems, frequency coordination, boom rigs)
  • Video village and monitoring (on-set monitors, wireless video)
  • Specialized equipment (cranes, dollies, Steadicam, drone, underwater)
  • Post-production hardware (edit systems, I/O devices, reference monitors)

Step 2.2 -- Equipment Lifecycle

Evaluate equipment lifecycle management:

  • Acquisition and capitalization tracking
  • Depreciation schedules and book value
  • Maintenance and calibration schedules (camera sensor cleaning, lens checks)
  • Repair history and mean time between failures
  • Insurance and replacement value tracking
  • End-of-life and disposition procedures

Step 2.3 -- Checkout and Allocation

Check equipment allocation workflows:

  • Checkout/check-in process (reservation, approval, sign-out, return)
  • Kit configuration management (standard camera packages, audio kits)
  • Cross-production equipment sharing and conflict resolution
  • External rental coordination (supplemental equipment from rental houses)
  • Equipment prep and testing workflows before production start
  • Loss and damage reporting and resolution

============================================================ PHASE 3: POST-PRODUCTION WORKFLOW ANALYSIS

Step 3.1 -- Editorial Pipeline

Analyze editorial workflow:

  • Camera-to-edit pipeline (offload, transcode, proxy generation)
  • Project organization (bin structure, naming conventions, metadata)
  • Collaborative editing (multi-editor, assistant editor, remote editing)
  • Conform workflow (online edit, relink to camera original)
  • Version control and project backup frequency
  • VFX pull workflow (plates, reference, turnover packages)

Step 3.2 -- VFX Pipeline

If VFX workflows exist:

  • Shot tracking system (ShotGrid/ftrack/NIM, status, assignments)
  • VFX editorial (temp comps, vendor review, final delivery)
  • Plate delivery specifications (resolution, color space, frame range, handles)
  • Review and approval workflow (dailies, supervisor review, client review)
  • Version management and iteration tracking
  • Stereo/3D or virtual production pipeline elements

Step 3.3 -- Sound and Music Post

Evaluate audio post-production:

  • Dialogue editing and ADR scheduling workflow
  • Sound effects editing and Foley recording pipeline
  • Music editorial (temp score, composer delivery, music editing)
  • Pre-mix and final mix workflow (stems, printmasters)
  • Dolby Atmos and immersive audio mastering
  • QC for dialogue intelligibility and loudness (ATSC A/85, EBU R128)

Step 3.4 -- Color and Finishing

Check color and mastering workflow:

  • Color pipeline (ACES, DaVinci Resolve, Baselight, Lustre)
  • LUT management and on-set look matching
  • HDR mastering (Dolby Vision, HDR10, HDR10+, HLG)
  • SDR trim pass and cross-format QC
  • DCP creation for theatrical exhibition
  • Final deliverables assembly and QC checkpoints

============================================================ PHASE 4: DIGITAL ASSET MANAGEMENT

Step 4.1 -- MAM/DAM System Assessment

Analyze media asset management:

  • Platform identification (Dalet, Mediator, Iconik, Cantemo, custom)
  • Metadata schema (Dublin Core, PBCore, EBUCore, custom taxonomies)
  • Search and retrieval capabilities (keyword, visual, speech-to-text)
  • Access control (role-based, project-based, watermarking, DRM)
  • Proxy generation and browse-quality streaming
  • Archive tier management (hot/warm/cold storage, LTO tape, cloud archive)

Step 4.2 -- Delivery Format Compliance

Check format and standards compliance:

  • IMF (Interoperable Master Format) package creation and validation
  • MXF (Material eXchange Format) wrapper compliance (OP1a, OPAtom)
  • SMPTE metadata standards (ST 377, ST 336, ST 2067 for IMF)
  • Broadcast delivery specs (AS-11, DPP, Netflix delivery spec)
  • Closed captioning and subtitling (SCC, SRT, TTML, IMSC)
  • Audio channel mapping and loudness compliance per deliverable

Step 4.3 -- Content Security

Evaluate content protection:

  • Forensic watermarking (visible and invisible)
  • Screener and review copy security (NexGuard, NAGRA, custom)
  • Physical security (facility access, vault, fire suppression)
  • Network security (air-gapped edit suites, TPN compliance)
  • MPAA/TPN (Trusted Partner Network) audit readiness
  • Content leak incident response procedures

============================================================ PHASE 5: TALENT AND CREW COORDINATION

Step 5.1 -- Talent Scheduling

Analyze talent coordination systems:

  • Cast availability and booking management
  • Fitting, rehearsal, and test scheduling
  • ADR and voice recording session coordination
  • Press and promotional appearance scheduling
  • Visa and travel coordination for international talent
  • SAG-AFTRA session tracking (daily/weekly, overtime, meal penalties)

Step 5.2 -- Crew Management

Evaluate crew coordination:

  • Department head availability and deal tracking
  • Day-player and daily hire scheduling
  • Crew call sheets and distribution systems
  • Time card and payroll reporting workflows
  • Union compliance tracking (turnaround, meal breaks, forced calls)
  • COVID/health safety protocol management

Step 5.3 -- Vendor and Contractor Coordination

Check external vendor management:

  • VFX vendor communication and deliverable tracking
  • Post-production facility booking across external houses
  • Music recording session coordination (studio, musicians, engineer)
  • Catering, transportation, and location vendor scheduling
  • Equipment rental house coordination and returns

============================================================ PHASE 6: WRITE REPORT

Write analysis to docs/studio-operations-analysis.md (create docs/ if needed).

Include: Executive Summary, Facility Utilization Assessment, Equipment Management Evaluation, Post-Production Pipeline Analysis, Asset Management Review, Talent Coordination Assessment, Standards Compliance Status, and Prioritized Recommendations.

============================================================ SELF-HEALING VALIDATION (max 2 iterations)

After producing output, validate data quality and completeness:

  1. Verify all output sections have substantive content (not just headers).
  2. Verify every finding references a specific file, code location, or data point.
  3. Verify recommendations are actionable and evidence-based.
  4. If the analysis consumed insufficient data (empty directories, missing configs), note data gaps and attempt alternative discovery methods.

IF VALIDATION FAILS:

  • Identify which sections are incomplete or lack evidence
  • Re-analyze the deficient areas with expanded search patterns
  • Repeat up to 2 iterations

IF STILL INCOMPLETE after 2 iterations:

  • Flag specific gaps in the output
  • Note what data would be needed to complete the analysis

============================================================ OUTPUT

Studio Operations Analysis Complete

  • Report: docs/studio-operations-analysis.md
  • Facilities analyzed: [count]
  • Equipment categories tracked: [count]
  • Workflow stages evaluated: [count]
  • Compliance standards checked: [count]

Summary Table

AreaStatusPriority
Facility Scheduling[optimized/gaps][P0-P3]
Equipment Tracking[complete/partial][P0-P3]
Post-Production Pipeline[efficient/bottlenecks][P0-P3]
Asset Management[mature/developing][P0-P3]
SMPTE/IMF Compliance[compliant/gaps][P0-P3]
Content Security[TPN-ready/at risk][P0-P3]
Talent Coordination[streamlined/manual][P0-P3]

Utilization Dashboard

Facility/ResourceUtilization %Revenue/DayBottleneck Risk
{stage/suite}{%}${amount}{Low/Med/High}

NEXT STEPS:

  • "Run /production-budgeting to align facility costs with production budget projections."
  • "Run /maintenance-scheduling to evaluate equipment maintenance and facility upkeep."
  • "Run /asset-lifecycle to plan capital expenditure for equipment replacement."

DO NOT:

  • Do NOT recommend specific vendor products -- evaluate the architecture, not brand choices.
  • Do NOT ignore SMPTE and format compliance -- delivery rejection is costly and delays release.
  • Do NOT skip content security assessment -- a leaked screener can cause significant financial damage.
  • Do NOT assume all workflows are digital -- many facilities still use hybrid tape/file workflows.
  • Do NOT overlook union and labor compliance in scheduling -- violations trigger penalties and grievances.

============================================================ SELF-EVOLUTION TELEMETRY

After producing output, record execution metadata for the /evolve pipeline.

Check if a project memory directory exists:

  • Look for the project path in ~/.claude/projects/
  • If found, append to skill-telemetry.md in that memory directory

Entry format:

### /studio-operations — {{YYYY-MM-DD}}
- Outcome: {{SUCCESS | PARTIAL | FAILED}}
- Self-healed: {{yes — what was healed | no}}
- Iterations used: {{N}} / {{N max}}
- Bottleneck: {{phase that struggled or "none"}}
- Suggestion: {{one-line improvement idea for /evolve, or "none"}}

Only log if the memory directory exists. Skip silently if not found. Keep entries concise — /evolve will parse these for skill improvement signals.

Keep looking

Skills are one crate of 328,083. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.