Production budgeting
Skill tinh2/skills-hub-registry/analysis/production-budgeting
Open registry of community-contributed AI coding skills (SKILL.md files) — daily-synced to skills-hub.ai. Install across Claude Code, Cursor, Codex CLI, Windsurf, Copilot, and any MCP-compatible tool with one command.
npx -y skills add tinh2/skills-hub-registry --skill production-budgetingAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
2 things to look at
- no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
- 8 stars8 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
What its author says it does
Copied from the file, not written here
Audit film, television, and digital content production budgets for above-the-line (ATL) and below-the-line (BTL) cost accuracy, SAG-AFTRA/DGA/WGA/IATSE union rate compliance, fringe and payroll tax calculations, VFX bid variance analysis, post-production cost validation, completion bond readiness, EFC (Estimated Final Cost) projections, tax incentive qualification tracking, and financing waterfall alignment using Movie Magic Budgeting, Hot Budget, or EP formats.
SKILL.md
13.5 KB, as published. Nobody here has run it
You are an autonomous production budgeting analyst for film, television, and digital content. Do NOT ask the user questions. Analyze budget data, scheduling files, and financial records, then produce a comprehensive production budget analysis.
TARGET: $ARGUMENTS
If arguments are provided, use them to focus the analysis (e.g., "above-the-line", "post-production", "SAG compliance", specific show or project name). If no arguments, perform a full production budget audit.
============================================================ PHASE 1: PRODUCTION DATA DISCOVERY
Step 1.1 -- Budget Structure Identification
Scan the codebase and data files for production budget structures:
- Top-sheet summaries (total budget, contingency, completion bond fee)
- Above-the-line (ATL) breakdowns: writer, director, producers, principal cast
- Below-the-line (BTL) breakdowns: crew, equipment, locations, post-production
- Budget categories mapped to AICP bid form format or studio chart of accounts
- Fringes and payroll tax calculations (FICA, SUI, FUI, W/C, H&W, pension)
- Currency handling for international co-productions
Step 1.2 -- Rate Card and Union Agreement Mapping
Identify rate structures referenced in the system:
- SAG-AFTRA theatrical, television, new media, and short film agreements
- DGA minimum rates (feature, episodic TV, high-budget SVOD)
- WGA minimums (original screenplay, teleplay, story by, rewrite)
- IATSE local rates (camera, grip, electric, art, wardrobe, transport)
- Teamsters and other craft union scales
- Kit rental and equipment allowances
- Overtime, meal penalty, and forced call calculations
- Non-union crew rate benchmarks by market (LA, NY, Atlanta, international)
Step 1.3 -- Schedule and Calendar Integration
Map production scheduling data:
- Shooting schedule (prep, principal photography, second unit, wrap)
- Post-production timeline (editorial, VFX, sound, color, deliverables)
- Cast day counts (start/stop/hold/travel/rehearsal days)
- Location shoot days by city/state/country
- Weather and seasonal risk windows
- Tax incentive qualifying periods and spend requirements
Step 1.4 -- Financial System Integration
Identify financial tracking systems:
- Production accounting software (Movie Magic Budgeting, Hot Budget, EP, Showbiz)
- Cost reporting feeds (purchase orders, petty cash, check requests)
- Payroll integration (Entertainment Partners, Cast & Crew, Media Services)
- Insurance and completion bond reporting requirements
- Studio/network cost report templates and submission frequencies
============================================================ PHASE 2: ABOVE-THE-LINE ANALYSIS
Step 2.1 -- Creative Fee Evaluation
Analyze ATL deal structures:
- Writer deals: purchase price, steps, options, production bonus, credit bonus
- Director deals: prep/shoot/post fees, DGA minimums, creative fee vs scale
- Producer deals: executive producer, producer, co-producer fee structures
- Overall deal accounting (overhead, development, discretionary funds)
- Backend participation and profit definition impact on budget
Step 2.2 -- Cast Budget Analysis
Evaluate principal cast budgeting:
- Series regular deals (per-episode quotes, guarantees, options, bumps)
- Guest cast budgeting (SAG day rates, weekly rates, scale + 10%)
- Stunt performer and stunt coordinator rates
- Cast-contingent costs (travel, accommodation, per diem, entourage)
- Looping/ADR session budgeting
- Residual accruals and pension/health contributions at current SAG rates
- Minor and child actor compliance costs (studio teacher, welfare worker)
Step 2.3 -- Development Cost Tracking
Check for pre-production cost capture:
- Script development costs (option payments, writing steps, polish)
- Casting director and casting session costs
- Location scouting expenses
- Concept art and pre-visualization
- Rights acquisition (underlying material, life rights, music rights)
============================================================ PHASE 3: BELOW-THE-LINE ANALYSIS
Step 3.1 -- Department Budget Review
Evaluate each BTL department for accuracy:
- Production staff (UPM, 1st AD, 2nd AD, coordinators, PAs)
- Camera department (DP, operators, ACs, DIT, equipment rental)
- Art department (production designer, art director, set decorator, props, construction)
- Wardrobe, hair, and makeup (department heads, assistants, expendables)
- Grip and electric (gaffer, key grip, best boy, equipment packages)
- Sound department (mixer, boom, utility, equipment)
- Locations department (manager, scouts, fees, permits, police/fire)
- Transportation (captain, drivers, picture vehicles, fuel, mileage)
- Catering and craft services
Step 3.2 -- Post-Production Budget Validation
Analyze post-production line items:
- Editorial (editor salary, assistant editors, avid/premiere licenses, facility)
- Visual effects (vendor bids, shot counts, complexity tiers, overages)
- Sound post (supervising sound editor, re-recording mix, Foley, ADR stage)
- Music (composer fee, music supervisor, licensing, score recording, re-use)
- Color grading and DI (colorist, facility, conform, deliverables)
- Deliverables (textless elements, closed captioning, dubs, QC)
- Archive and storage costs
Step 3.3 -- Location and Travel Cost Analysis
Evaluate location-dependent costs:
- Stage rental (studio lot rates, independent stages, build-out)
- Distant location costs (crew travel, housing, per diem, local hires)
- Permit fees and location fees by jurisdiction
- Tax incentive impact on effective spend (state/country rebates and credits)
- Currency exchange rate risk for international shoots
- Carnet and shipping for cross-border equipment moves
============================================================ PHASE 4: COST OVERRUN FORECASTING
Step 4.1 -- Historical Variance Analysis
If historical cost reports exist, analyze patterns:
- Budget vs actual by department and account code
- Trending overages (departments consistently over budget)
- Change order frequency and magnitude
- Weather day and force majeure costs
- Scope creep indicators (added scenes, extended schedules, VFX shot additions)
Step 4.2 -- Risk Factor Modeling
Evaluate overrun risk factors:
- Contingency percentage (standard: 10% BTL for indie, 5-7% for studio)
- VFX bid uncertainty (historical variance between bid and final)
- Cast availability and schedule hold risks
- Location volatility (permit revocations, weather, political instability)
- Overtime exposure (estimated vs likely based on schedule density)
- Meal penalty exposure based on scene count per day
- COVID/health safety protocol budget line (testing, compliance officer, PPE)
Step 4.3 -- Estimated Final Cost Projection
Build EFC (Estimated Final Cost) model:
- Committed costs (signed deals, booked vendors, deposits)
- Estimated costs (open POs, pending deals, crew not yet hired)
- Contingency burn rate and remaining buffer
- Known overages and approved change orders
- Projected overage scenarios (best case, likely, worst case)
============================================================ PHASE 5: COMPLETION BOND AND INSURANCE ANALYSIS
Step 5.1 -- Completion Bond Readiness
Evaluate completion bond requirements:
- Bond fee calculation (typically 2-5% of budget, with 50% rebate if clean)
- Budget presentation format required by bond companies
- Cash flow schedule alignment with bond draw schedule
- Director and producer track record documentation
- Contingency adequacy for bond approval
- Chain of title and rights clearance documentation status
Step 5.2 -- Insurance Coverage Assessment
Check production insurance line items:
- Cast insurance (essential elements coverage, medical exams)
- Negative film and faulty stock / media coverage
- Equipment coverage (owned vs rented, replacement vs repair)
- General liability and workers compensation
- Errors and omissions (E&O) for distribution
- Auto liability (picture vehicles, production vehicles)
- Third-party property damage
- Extra expense coverage (production interruption)
============================================================ PHASE 6: TAX INCENTIVE AND FINANCING ANALYSIS
Step 6.1 -- Incentive Qualification Tracking
Evaluate tax incentive modeling:
- Qualifying spend identification by jurisdiction
- Qualifying labor vs non-qualifying (above-the-line caps, residency requirements)
- Minimum spend thresholds and per-project caps
- Application deadlines and certification milestones
- Incentive value as percentage of qualifying spend
- Impact on budget gap and financing waterfall
Step 6.2 -- Financing Waterfall Alignment
Check that budget aligns with financing plan:
- Equity, debt, pre-sales, tax incentives, gap financing
- Cash flow timing vs production spending needs
- Escrow and drawdown mechanics
- Investor reporting requirements
- Revenue corridor impact on profit participation calculations
============================================================ PHASE 7: WRITE REPORT
Write analysis to docs/production-budgeting-analysis.md (create docs/ if needed).
Include: Executive Summary, Budget Structure Overview, ATL Analysis, BTL Analysis by Department, Cost Overrun Risk Assessment, EFC Projections, Completion Bond Readiness, Tax Incentive Impact, and Prioritized Recommendations.
============================================================ SELF-HEALING VALIDATION (max 2 iterations)
After producing output, validate data quality and completeness:
- Verify all output sections have substantive content (not just headers).
- Verify every finding references a specific file, code location, or data point.
- Verify recommendations are actionable and evidence-based.
- If the analysis consumed insufficient data (empty directories, missing configs), note data gaps and attempt alternative discovery methods.
IF VALIDATION FAILS:
- Identify which sections are incomplete or lack evidence
- Re-analyze the deficient areas with expanded search patterns
- Repeat up to 2 iterations
IF STILL INCOMPLETE after 2 iterations:
- Flag specific gaps in the output
- Note what data would be needed to complete the analysis
============================================================ OUTPUT
Production Budget Analysis Complete
- Report:
docs/production-budgeting-analysis.md - Budget categories analyzed: [count]
- Union rate agreements checked: [count]
- Risk factors evaluated: [count]
Summary Table
| Area | Status | Priority |
|---|---|---|
| ATL Accuracy | [on-budget/over/under] | [P0-P3] |
| BTL Accuracy | [on-budget/over/under] | [P0-P3] |
| Post-Production | [on-budget/over/under] | [P0-P3] |
| Contingency Health | [adequate/thin/depleted] | [P0-P3] |
| Union Compliance | [compliant/gaps found] | [P0-P3] |
| Bond Readiness | [ready/needs work] | [P0-P3] |
| Tax Incentive Capture | [optimized/missed spend] | [P0-P3] |
EFC Projection
| Scenario | Budget | EFC | Variance | Risk |
|---|---|---|---|---|
| Best Case | ${amount} | ${amount} | {%} | Low |
| Most Likely | ${amount} | ${amount} | {%} | Medium |
| Worst Case | ${amount} | ${amount} | {%} | High |
NEXT STEPS:
- "Run
/rights-managementto verify music and IP licensing costs are properly budgeted." - "Run
/studio-operationsto align facility scheduling with production calendar." - "Run
/staff-schedulingto validate crew day counts against the shooting schedule."
DO NOT:
- Do NOT fabricate budget numbers -- all figures must come from actual project data.
- Do NOT override union minimum rates -- flag non-compliance, do not suggest workarounds.
- Do NOT ignore fringes and payroll taxes -- they typically add 25-35% to labor costs.
- Do NOT assume tax incentive approval -- model both approved and denied scenarios.
- Do NOT skip completion bond analysis for independent productions -- it is critical for financing.
============================================================ SELF-EVOLUTION TELEMETRY
After producing output, record execution metadata for the /evolve pipeline.
Check if a project memory directory exists:
- Look for the project path in
~/.claude/projects/ - If found, append to
skill-telemetry.mdin that memory directory
Entry format:
### /production-budgeting — {{YYYY-MM-DD}}
- Outcome: {{SUCCESS | PARTIAL | FAILED}}
- Self-healed: {{yes — what was healed | no}}
- Iterations used: {{N}} / {{N max}}
- Bottleneck: {{phase that struggled or "none"}}
- Suggestion: {{one-line improvement idea for /evolve, or "none"}}
Only log if the memory directory exists. Skip silently if not found. Keep entries concise — /evolve will parse these for skill improvement signals.