agentsclimarketplace

Finish phase

Skill threehillpath/marvin-sdd-archived/skills/finish-phase

Commit, push, open a PR to the implementation branch, and move a phase issue to In ReviewFrom its SKILL.md

Install
npx -y skills add threehillpath/marvin-sdd-archived --skill finish-phase

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

2 things to look at

  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
  • 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

2.9 KB, as published. Nobody here has run it

Close out a completed phase: commit staged work, push, open a PR to the correct base branch, and move the issue to In Review.

The PR target is determined automatically from the current branch name:

  • feature/plan-XXXXX-N → PR targets feature/plan-XXXXX (implementation branch)
  • feature/plan-XXXXX → PR targets main (use /finish-impl instead for this case)

Before starting: Read .claude/plan-workflow-config.yml for project configuration (repo, owner). Read ../SHARED/GLOSSARY.md for branch and status conventions.

Arguments

  • $0 — Phase issue number (the [PLAN-XXXXX-N] issue)

Steps

1. Fetch phase context

gh issue view $0 --repo <repo> --json number,title,body

Extract the PLAN-XXXXX-N identifier and phase title to use in the commit message and PR.

2. Review current state

git status
git diff --stat HEAD

Show the output. If the working tree is clean and nothing is staged, stop — there is nothing to commit. Ask the user if they meant a different issue or branch.

3. Check branch and determine PR target

git branch --show-current

If on main or master, stop and warn.

Resolve the PR base branch from the current branch:

marvin pr base "$(git branch --show-current)"

If marvin exits with code 2, surface to the user: "Configuration missing — run /configure-plan-plugin first." If marvin exits with code 1 (branch does not match a known pattern), ask the user which branch to target before proceeding.

Read the base field from the JSON output to use as the PR target.

4. Confirm before committing

Present a summary of what will be committed and the proposed commit message. Do not stage or commit without explicit user confirmation.

Proposed commit message format:

[PLAN-XXXXX-N] <phase title>

5. Stage and commit

git add <confirmed files>
git commit -m "[PLAN-XXXXX-N] <phase title>"

6. Push

git push -u origin <branch>

7. Create PR

Read ../SHARED/PR_TEMPLATE.md and use the Phase PR template.

gh pr create --repo <repo> \
  --title "[PLAN-XXXXX-N] <Phase Title>" \
  --base <pr-target> \
  --body "<PR body>"

The PR body must include Closes #$0 to auto-close the phase issue on merge.

8. Move issue to In Review

marvin board move $0 in-review

If marvin exits with code 2, surface to the user: "Configuration missing — run /configure-plan-plugin first."

9. Confirm

Report: commit hash, branch, PR URL, issue #$0 moved to In Review.

If more phases remain: "Next: merge this PR, then /implement-phase <next-phase-issue-number>" If this was the last phase: "Next: merge this PR, then /finish-impl <impl-plan-issue-number>"

Keep looking

Skills are one crate of 607,533. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.