Weekly report
Skill TheCraigHewitt/cowork-starter-pack/skills/weekly-report
Seven universal skills, context file templates, global instructions, and a curated prompt library for Claude Co-work.
npx -y skills add TheCraigHewitt/cowork-starter-pack --skill weekly-reportAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
What its author says it does
Copied from the file, not written here
Produces a weekly report summarizing what happened this week — completed work, what stalled, decisions made, next week's priorities. Pulls from calendar, messaging, and any work logs in the project folder. Use when the user asks for a weekly report, Friday recap, weekly review, or end-of-week summary. Best run as a scheduled task late Friday afternoon.
SKILL.md
4.5 KB, as published. Nobody here has run it
Weekly Report
Turn a week of meetings, messages, and scattered notes into a one-page recap the user can send to themselves, a manager, or a team — without spending 45 minutes writing it.
Before starting
- Read
context/about-me.md— who is this report for, what does the user own? - Read
context/preferences.md— what format does the user want? Who is the audience? - Read
context/voice.md— for any narrative prose in the report. - Check
/output/for last week's report — continuity matters. Did last week's priorities get done?
What to produce
A markdown file saved to /output/weekly-report-{YYYY-MM-DD}.md, covering Monday through today (or a 7-day window if today isn't Friday).
Four sections:
- What moved this week — 3–6 bullets. The wins, the meaningful progress, the decisions made. Specific. No vague "worked on X" — say what shipped, what got decided, what changed.
- What stalled or slipped — 1–4 bullets. Honest. Don't cover things up. If something was on last week's list and didn't happen, say so and say why.
- Decisions & notable changes — decisions taken this week that someone might want to know about later. One line each. (This section feeds a decision log over time.)
- Next week's focus — 3 priorities, ranked. Each with one sentence of why.
Inputs
- Calendar from the last 7 days
- Messages / Slack DMs from the last 7 days
- Last week's weekly report (if exists) — for continuity
- Any
/output/files created this week — these are the trail of work done - Any decision-journal entries in the project folder (if used)
How it works
- Pull the week's calendar — identify meetings that produced outputs (reviews, 1-1s, decisions)
- Pull message/Slack history — look for commitments made, decisions mentioned, items closed
- Scan
/output/for files created/modified this week — this is the actual work trail - Compare to last week's "Next week's focus" — did those priorities move?
- Draft the four sections
- If the user specified an audience in
preferences.mdorabout-me.md, tune the tone to that audience - Save the file, tell the user one-line what was notable
What not to do
- Do not list every meeting. Only meetings that produced something.
- Do not pad. If the week was quiet, the report is short. A two-paragraph weekly report is better than a fake one-pager.
- Do not editorialize beyond what the evidence supports. "Team morale is high" is not something you can know from the data.
- Do not skip the "stalled" section because it's uncomfortable. That section is the whole point.
Example output structure
# Weekly Report — Week of 2026-04-14 to 2026-04-18
## What moved
- Shipped the Q2 planning doc; got sign-off from all three department heads
- Closed Northwind contract — signature on file, kickoff scheduled 4/28
- Hired new ops manager (starts 5/5) — offer accepted Wednesday
- Finished vendor migration to new payroll provider; first run clean
## What stalled
- Pricing review pushed to next week — blocked on finance model from Alex
- Board deck outline is still not started; needs 2 hours I haven't made
## Decisions & notable changes
- Decided to delay the Q3 hiring wave by one month (signal from April sales pipeline)
- Switched weekly reporting cadence from Monday to Friday (this report is the first)
- Approved the $18K spend on new analytics stack
## Next week's focus
1. Pricing review — unblock the finance model Monday morning. This is the #1 item on the quarterly plan.
2. Board deck — block 2 hours Tuesday. Draft is due Thursday.
3. Onboard new ops manager — calendar holds and 30/60/90 plan ready before 5/5.
Customization notes
- For a team report. Add a fifth section: "Team highlights" — named callouts of who shipped what. Use sparingly; too many names and it reads like a bureaucratic formality.
- For a self-only report. Add a sixth section: "Energy & load" — one line on how the week felt. This is for future-you reading back in three months.
- For manager reports. Tighten "What stalled" to include what you're doing about it, not just what's stuck.