Tasker
Decompose an Umbraco upgrade architecture plan into developer-ready tasks with acceptance criteria, effort estimates, dependencies, and workstream assignments. Use this skill when someone needs to break down an upgrade plan into tickets, work items, or tasks for a dev team. Also trigger when someone asks to "create tickets", "break this into tasks", "generate work items", "make this actionable for the team", or "create a task board" from an Umbraco upgrade plan. Outputs in multiple formats: markdown, CSV (for Jira/Azure DevOps import), and structured JSON.From its SKILL.md
npx -y skills add smithdak/umbraco-upgrade --skill taskerAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
9.8 KB, as published. Nobody here has run it
Umbraco Upgrade Tasker (15 → 17)
Convert an architecture plan into discrete, assignable, dev-ready tasks that a team can pick up and execute without needing to understand the full upgrade context.
When to Use
- After the architect skill has produced a migration plan
- When a tech lead needs to populate a project board
- When work needs to be distributed across a team
- As the final step in the agent orchestration pipeline
Inputs
- Architecture plan JSON from
umbraco-upgrade-architect(preferred) - OR: architecture plan markdown
- OR: audit findings + manual plan description
- Team context: size, roles, sprint length (optional, for sprint planning)
Core Principles
Each task must be independently understandable by a developer who hasn't read the full plan. This means:
- Self-contained context: The task description explains WHY this change is needed, not just WHAT to do
- Specific file references: Where possible, list the exact files that need to change
- Acceptance criteria: Clear, testable conditions for "done"
- Migration recipe reference: Link to the specific playbook recipe so the dev has step-by-step guidance
- Dependencies are explicit: If task B requires task A, say so clearly
Workflow
Step 1: Load the Plan
Read the architecture plan (JSON or markdown). Extract:
- All work items from each phase
- The dependency chain between phases
- Risk levels and effort estimates
- Workstream assignments
Step 2: Decompose Work Items into Tasks
Each work item from the plan may become one or more tasks. The decomposition rules:
1:1 mapping (work item = task) when:
- The work is small (XS or S effort)
- It touches a single area
- One developer can complete it independently
1:N decomposition (work item → multiple tasks) when:
- The work item spans multiple files/projects
- It mixes code changes with configuration changes
- It has distinct "implement" and "verify" steps
- Different team members would work on different parts
Task Decomposition Rules
For each finding category, use these decomposition patterns:
Recompile tasks:
- Single task: "Recompile [component] against U17 packages"
- Include: which projects, expected outcome, how to verify
Find-and-Replace tasks:
- Single task per pattern type (group similar changes)
- Include: regex pattern, file glob, before/after example
- AC: "grep returns zero results for old pattern"
Refactor tasks:
- One task per logical unit of change
- Include: specific recipe reference from migration playbook
- Include: relevant test coverage expectations
- AC: "code compiles + unit tests pass + manual verification of [specific behavior]"
Rebuild tasks:
- Break into: research/spike → implement → integrate → test
- Each sub-task is independently assignable
- Flag rebuild tasks with "LARGE — may need refinement" if > L effort
Configure tasks:
- One task per configuration area
- Include: exact JSON/XML to add/change
- AC: "application starts successfully with new configuration"
Verify tasks:
- Pair with related code/config tasks
- Include: specific test scenarios to run
- AC: detailed test script or checklist
Step 3: Assign Workstreams
Every task gets a primary workstream:
| Workstream | Roles | Typical Tasks |
|---|---|---|
| backend | .NET developers | C# changes, API updates, data access |
| backoffice | Frontend / Umbraco developers | Lit components, extension updates |
| devops | DevOps / infrastructure | CI/CD, Docker, deployment config |
| qa | QA / testers | Regression testing, content verification |
| admin | Tech lead / PM | License migration, decision-making |
Step 4: Build Dependency Graph
Map task dependencies:
- Phase-level: Phase N tasks generally depend on Phase N-1
- Task-level: Some tasks within a phase have internal dependencies
- Parallel opportunities: Identify tasks that can run in parallel across workstreams
Express as:
TASK-001 → TASK-005 (TASK-005 requires TASK-001 complete)
TASK-002 ∥ TASK-003 (can run in parallel)
Step 5: Generate Output
Produce tasks in three formats:
5a. Markdown Task List
Use the task template at assets/task-template.md (local to this skill directory). For each task:
### TASK-XXX: [Title]
**Phase:** [N] — [Phase Name]
**Workstream:** [backend | backoffice | devops | qa | admin]
**Effort:** [XS | S | M | L | XL]
**Risk:** [LOW | MEDIUM | HIGH]
**Depends On:** [TASK-YYY, TASK-ZZZ] or None
**Source Findings:** [CS-001, CS-005]
**Playbook Reference:** migration-playbook.md#[section]
#### Context
[WHY this change is needed — 2-3 sentences a dev can read to understand the purpose]
#### What to Do
[Specific instructions — files to change, patterns to search, code to update]
#### Files Affected
- `src/path/to/file.cs` (line ~42)
- `src/path/to/other-file.cs`
#### Acceptance Criteria
- [ ] [Specific, testable criterion]
- [ ] [Another criterion]
- [ ] Code compiles without errors
- [ ] Existing tests pass
#### PR Description Template
What: [One-line summary] Why: [Breaking change reference] How: [Approach taken] Testing: [How this was verified] Related: TASK-XXX
5b. CSV for Project Management Import
Generate a CSV compatible with Jira/Azure DevOps/Linear import:
ID,Title,Description,Type,Priority,Effort,Workstream,Phase,Dependencies,Acceptance Criteria,Labels
TASK-001,"Update target framework to .NET 10","...","Task","Critical","S","devops","Phase 1","","Solution builds on .NET 10","umbraco-upgrade,framework"
Use scripts/generate-tasks.py (local to this skill directory) for CSV generation:
python3 scripts/generate-tasks.py tasks.json --format csv --output tasks.csv
python3 scripts/generate-tasks.py tasks.json --format azdo --output tasks-azdo.csv
python3 scripts/generate-tasks.py tasks.json --format jira --output tasks-jira.csv
5c. JSON (Structured)
{
"task_metadata": {
"project_name": "string",
"total_tasks": 0,
"total_effort_days": { "min": 0, "max": 0 },
"generated_date": "ISO-8601"
},
"tasks": [
{
"id": "TASK-001",
"title": "string",
"phase": 1,
"phase_name": "Framework & Infrastructure",
"workstream": "devops",
"effort": "S",
"effort_hours": { "min": 1, "max": 4 },
"risk": "LOW",
"depends_on": [],
"source_findings": ["PROJ-001"],
"playbook_ref": "migration-playbook.md#1",
"context": "string",
"instructions": "string",
"files_affected": ["src/MyProject/MyProject.csproj"],
"acceptance_criteria": ["Solution builds targeting net10.0"],
"labels": ["umbraco-upgrade", "framework"],
"pr_template": "string"
}
],
"dependency_graph": {
"TASK-001": { "depends_on": [], "blocks": ["TASK-005", "TASK-006"] },
"TASK-005": { "depends_on": ["TASK-001"], "blocks": [] }
},
"workstream_summary": {
"backend": { "task_count": 0, "total_effort_hours": { "min": 0, "max": 0 } },
"backoffice": { "task_count": 0, "total_effort_hours": { "min": 0, "max": 0 } },
"devops": { "task_count": 0, "total_effort_hours": { "min": 0, "max": 0 } },
"qa": { "task_count": 0, "total_effort_hours": { "min": 0, "max": 0 } },
"admin": { "task_count": 0, "total_effort_hours": { "min": 0, "max": 0 } }
},
"sprint_suggestions": [
{
"sprint": 1,
"theme": "Foundation",
"tasks": ["TASK-001", "TASK-002", "TASK-003"],
"parallel_tracks": [
{ "workstream": "devops", "tasks": ["TASK-001"] },
{ "workstream": "admin", "tasks": ["TASK-002"] }
]
}
]
}
Step 6: Save Outputs
Save to:
upgrade-tasks/tasks.md— full markdown task listupgrade-tasks/tasks.csv— importable CSVupgrade-tasks/tasks.json— structured JSONupgrade-tasks/dependency-graph.md— visual dependency map
Agent Mode Instructions
When running as the tasker agent:
- Accept the architecture plan JSON from the architect agent
- Read the migration playbook at the plugin's
references/migration-playbook.md(two directories up:../../references/migration-playbook.md) for migration recipes to reference in tasks - Generate all three output formats
- Include sprint suggestions if team context is provided
- Output files to the workspace directory
Effort → Hours Mapping
| Size | Hours (min) | Hours (max) | Typical Work |
|---|---|---|---|
| XS | 0.25 | 0.5 | Config change, single find-replace |
| S | 0.5 | 4 | Small refactor, single file update |
| M | 4 | 16 | Multi-file refactor, API migration |
| L | 16 | 40 | Component rebuild, complex migration |
| XL | 40 | 80+ | Full rewrite (e.g., AngularJS → Lit) |
Tips
- Number tasks sequentially within phases: TASK-101, TASK-102 (Phase 1), TASK-201, TASK-202 (Phase 2), etc.
- Always include a "Verify [area]" task after code change tasks — testing is work too
- Group find-and-replace tasks together when the same developer would do them in one sitting
- For XL tasks (rebuilds), add a "Spike: Research approach for [component]" task first
- CSV format should match the team's actual PM tool — ask about custom fields if needed
- Sprint suggestions assume 2-week sprints unless told otherwise