agentsclimarketplace

Vcsdd git integration

Skill sc30gsw/vcsdd-claude-code/skills/vcsdd-git-integration

Use this skill when committing VCSDD pipeline artifacts to git. Provides conventional commit message format, phase tag patterns, and atomic staging strategies.From its SKILL.md

Install
npx -y skills add sc30gsw/vcsdd-claude-code --skill vcsdd-git-integration

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.

SKILL.md

1.8 KB, as published. Nobody here has run it

VCSDD Git Integration

When to Activate

  • Running /vcsdd-commit command
  • Creating phase-completion commits
  • Tagging pipeline milestones

Commit Message Format

vcsdd(<phase>): <feature-name> - <phase-description>

Phase: <phase-id>
Feature: <feature-name>
Sprint: <N>
Gate: <PASS|FAIL|SKIP>
Beads: <bead-ids-affected>
Iteration: <N>

Artifacts:
- specs/behavioral-spec.md [modified]
- evidence/sprint-1-red-phase.log [added]

Traceability:
- REQ-001 -> TEST-001 -> IMPL-001 [green]
- REQ-002 -> TEST-002 [red, pending implementation]

Git Tag Format

vcsdd/<feature>/phase-1a    # Spec crystallization complete
vcsdd/<feature>/phase-1c    # Spec gate passed
vcsdd/<feature>/phase-2a    # Red phase complete
vcsdd/<feature>/phase-2b    # Green phase complete
vcsdd/<feature>/phase-3-i1  # Adversary review iteration 1
vcsdd/<feature>/phase-6     # Convergence achieved

Atomic Staging

Stage all VCSDD artifacts atomically:

git add -- .vcsdd/index.json .vcsdd/history.jsonl .vcsdd/active-feature.txt .vcsdd/features/<name>/ [phase-scoped source/test/spec files]
git commit -m "vcsdd(2b): my-feature - implementation (green phase)"
git tag vcsdd/my-feature/phase-2b

Only stage files that belong to the active feature and current phase. If unrelated dirty files exist, stop and require a manual review instead of widening the stage set.

Auto-Commit Safety Rules

Auto-commit (VCSDD_AUTO_COMMIT=true) refuses to commit if:

  • Unrelated dirty files exist in worktree
  • Phase transition is invalid
  • No phase change detected since last commit

Keep looking

Skills are one crate of 613,757. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.