Solution framing

Skill RobinGru/AgentSkillForge/skills/solution-framing

Portable, reusable instruction packages for AI coding assistants.

Install
npx -y skills add RobinGru/AgentSkillForge --skill solution-framing

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Establish a defensible direction for an unclear or consequential software decision before implementation. Use when goals, boundaries, interfaces, ownership, risks, or non-goals need an explicit decision record.

The file declares its own license as Apache-2.0. That is the author’s claim about this one file, and it is not the same thing as the license GitHub reports for the repository, which is listed with the other numbers below.

SKILL.md

4.3 KB, as published. Nobody here has run it

Solution framing

Turn an uncertain technical request into a bounded decision that another person or agent can inspect and act on. The result is a decision brief, not an implementation plan disguised as discovery.

Use this skill when

Use this skill when one or more of these conditions apply:

  • The requested outcome or expected behavior is ambiguous.
  • The work crosses system boundaries, interfaces, or ownership lines.
  • Several feasible directions have materially different costs or risks.
  • Choosing the wrong direction would make later work expensive to undo.
  • Constraints, non-goals, risks, or acceptance checks are absent.

Do not use this skill when

Do not use this skill for a fully specified local change, a typo or isolated configuration value, a request with an accepted decision brief, or a code review with a known change set. Route a performance symptom without a baseline to a performance investigation instead.

Operating rules

  • Inspect available project facts before asking for information.
  • Label each important statement as observed, provided, assumed, or unknown.
  • Ask only for information that can change the decision or prevent unsafe work.
  • Prefer a reversible, smaller direction when it satisfies the stated need.
  • Do not present an assumption, estimate, or unrun check as facts.
  • Do not begin implementation until the handoff outcome permits it.

Workflow

1. Frame the problem

State the requested change without prescribing a solution. Identify the affected users or systems, the observed starting condition, and the desired end condition. If any of these are unknown, record that uncertainty.

Exit: a one-paragraph problem statement that can be disproved or refined.

2. Bound the decision

List in-scope work, excluded work, hard constraints, reversible assumptions, blockers, and affected interfaces. Use risk-and-reversibility.md to assess whether a missing fact blocks progress or can remain an assumption.

Exit: a bounded decision surface with explicit ownership and dependencies.

3. Compare options when needed

Compare only genuinely viable options. Use criteria that arise from the problem, such as safety, compatibility, migration cost, reversibility, operational burden, or time to confirm key facts. An option may be rejected without a full comparison when it violates a hard constraint.

Exit: a concise comparison or a reason why only one viable direction exists.

4. Decide in a brief

Create the decision brief using solution-brief-template.md. Every required heading must be present. Link facts to the choice, separate assumptions from facts, and state how acceptance will be demonstrated. Consult decision-record.md for field definitions.

Exit: a complete decision brief with no unlabelled uncertainty.

5. Choose a handoff state

Choose exactly one result:

  • Ready to implement: scope, constraints, owner, and acceptance checks are sufficient.
  • Research required: a named unknown prevents a safe decision.
  • Decision required: a stakeholder must choose among stated trade-offs.
  • Split required: independent decisions should be resolved separately.

Output contract

Return one decision brief with these exact headings:

  1. ## Decision
  2. ## Facts
  3. ## Assumptions
  4. ## Boundaries
  5. ## Selected approach
  6. ## Rejected approaches
  7. ## Risks and mitigations
  8. ## Acceptance checks
  9. ## Open blockers
  10. ## Handoff state

A brief is complete only when every heading has substantive content, each claim is labelled as observed, provided, assumed, or unknown; rejected options have a reason, and the handoff state is one of the four allowed values.