Sprint plan
Convert the start-of-sprint canvas into a planning markdown report — sprint goal summary, committed scope, capacity vs commitment (split into carry-over from previous sprint vs new commit), key observations, and risks. Assumes all unclosed items from the previous sprint's end snapshot are carried into this sprint and surfaces them as a dedicated section with WIP-saturation risk. Reuses sprint-snapshot's `_sprint.md`, `_team-rules.md`, current `start.canvas`, and previous sprint's `end.canvas`. Auto-runs a clarity-council session (statistics-expert + scrum-master + product-owner) for the observations/risks block. Output is date-stamped (`sprint-plan-YYYY-MM-DD.md`) — same-day re-runs silently refresh today's file, prior days are preserved as historical record; a `sprint-plan-latest.md` pointer always wikilinks the newest. Use when user says "sprint plan", "sprint planning report", "convert sprint plan to markdown", or invokes /sprint-plan.From its SKILL.md
npx -y skills add risadams/skills --skill sprint-planAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
2 things to look at
- no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
- 2 stars2 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
24.5 KB, ~6.1k tokens by cl100k_base, as published. Nobody here has run it
Sprint Plan Report
Read the start.canvas snapshot for a sprint and produce a planning markdown report. Read-only on Jira (the canvas is already a frozen snapshot — no fresh fetch needed). Writes one report file into the sprint folder.
This skill is the Claude port of the user's "Sprint Plan" prompt template. It expects sprint-snapshot has already produced a start.canvas for the target sprint. If it hasn't, the skill prompts to invoke sprint-snapshot first.
Quick start
/sprint-plan → Aurora, current sprint (auto-detect newest)
/sprint-plan Borealis → single team
/sprint-plan Aurora --inc 28 --sprint 2 → explicit sprint
/sprint-plan Aurora --no-council → skip clarity-council, LLM-only analysis
Parameters
| Param | Default | Notes |
|---|---|---|
Team | from memory or prompt | Same reference_default_scrum_team.md source as sprint-snapshot |
Inc | latest from Scrum 📅/INC <N>/ | Scan vault for newest |
Sprint | latest from INC <N>/Sprint <N>/ | Scan vault for newest |
Personas | statistics-expert,scrum-master,product-owner,infographics-expert | Comma-separated; --no-council disables. infographics-expert is included by default per the always-add-charts feedback; their output drops Mermaid charts directly into the report body. |
Workflow
- [ ] Phase 1: Resolve config (vault, team, inc/sprint, sprint config, team rules)
- [ ] Phase 2: Locate and load start.canvas + _snapshots.jsonl (start row)
- [ ] Phase 2.5: Locate previous sprint's end.canvas → derive carry-over set
- [ ] Phase 3: Convert canvas to structured markdown (issue table by status + by member, carry-over annotated)
- [ ] Phase 4: Apply team rules (overhead, wedge, in-review overhead, carry-over) to derive effective capacity
- [ ] Phase 5: Run clarity-council (observations + risks, with carry-over context) unless --no-council
- [ ] Phase 6: Render and write the report (date-stamped per run)
- [ ] Phase 7: Console summary
Phase 1 — Config
Resolve {{vault_root}}, {{jira_project}}, {{default_team}}, {{output_root}}, {{sprint_config}}, and {{team_rules}} per the contracts in sprint-snapshot/SKILL.md and sprint-snapshot/REFERENCE.md. Bootstrap missing files via the same AskUserQuestion patterns.
Phase 2 — Locate the start canvas
- Look for
{{output_root}}\start.canvas. - If missing,
AskUserQuestion:Run /sprint-snapshot --phase start now (recommended)/Pick a different phase canvas/Cancel. Don't fabricate. - Read the canvas as JSON. Filter nodes to issue cards (
idmatches^issue-); parse the markdown body forKEY,Summary,Assignee,Points,Type,Status(status comes from the column the card is in — derive from x-coord using the column constants in REFERENCE.md or, simpler, from the card'scolorfield). - Also read
_snapshots.jsonland grab the row wherephase == "start"for the totals (matches what's already on the canvas; faster to use directly).
Phase 2.5 — Previous sprint's end → carry-over set
Carry-over from the previous sprint is the planning skill's most load-bearing context — the team didn't get to choose all of this sprint's scope; they inherited part of it. Compute the carry-over set so the council, capacity math, and report all reflect reality.
- Locate the previous sprint folder.
{{output_root}}is…\INC <Inc>\Sprint <Sprint>\. The previous sprint is:…\INC <Inc>\Sprint <Sprint - 1>\ifSprint > 1…\INC <Inc - 1>\Sprint 4\(or the highestSprint Nfolder in the prior INC) ifSprint == 1
- Load the previous sprint's
end.canvas. If it's missing, fall back in this order: latestweek 3.canvas, latestweek 2.canvas, latestweek 1.canvas. If none exists, skip carry-over derivation and surface a console warning + a frontmatter flag (carry_over: unavailable). Do not invokesprint-snapshotfrom here — the previous sprint is closed; if the SM forgot to capture anendsnapshot, that's a process gap to surface, not silently paper over. - Parse issue cards from the previous-sprint canvas the same way as
start.canvas(key, status, points). - Carry-over set = tickets present in both
current_start.canvasandprevious_end.canvaswhoseprevious_end.status ∉ {Done, Won't Fix, Duplicate}. Per the user's planning convention: all unclosed items from the previous sprint are assumed to carry into this one. If a ticket was in the previous sprint, was unclosed at end, and isn't in this sprint's start, surface a console warning — that's an unusual planning decision the SM should confirm wasn't a mistake. - Sub-classify carry-over by previous-sprint end-status:
carry_over.in_progress— was IN PROGRESS at previous end; resume work, expect faster closecarry_over.in_review— was IN REVIEW at previous end; should close early this sprintcarry_over.todo— was TO DO at previous end; full sprint of work still ahead
- Carry-over points = sum of points of carry-over tickets at current sprint start (use the new estimate if it changed). Track separately as
carry_over_points.
State the result in one short sentence: "Carry-over from Sprint 1: 4 tickets (11 pts) — 1 in-progress, 2 in-review, 1 to-do."
Phase 3 — Canvas → markdown
Build the structured backbone before any narrative. Two views:
By status (kanban cross-section). Annotate carry-over rows with a 🔄 glyph in the leading column and a (carry-over: <prev-status>) suffix in the Summary cell so the SM can scan-find them:
## Committed Scope by Status
### TO DO (Unassigned) — N tickets, P pts
| | Key | Summary | Type | Points |
| :-: | :--- | :--- | :--- | --: |
| | JIRA:PROJ-1234 | Summary | Story | 3 |
| 🔄 | JIRA:PROJ-1100 | Summary (carry-over: in-review) | Story | 2 |
### TO DO (Assigned) — N tickets, P pts
…
### IN PROGRESS — N tickets, P pts
…
### IN REVIEW — N tickets, P pts
…
### DONE — N tickets, P pts (typically 0 at sprint start)
…
By member (workload view):
## Committed Scope by Member
### [[@First Last]] — N tickets, P pts (effective capacity: C pts)
| Key | Summary | Status | Points |
| :--- | :--- | :--- | --: |
| JIRA:PROJ-1234 | Summary | TO DO | 3 |
### Off-team
…
### Unassigned
…
Use JIRA:KEY on its own table cell so the Obsidian Jira plugin auto-links each row.
Phase 4 — Apply team rules
Compute the derived numbers the report depends on:
- Overhead-adjusted capacity per member =
nominal_capacity × (1 - overhead_pct/100). For overhead members listed in_team-rules.md, surface both nominal and effective. - In-review overhead identification — scan IN REVIEW issues; flag any whose summary matches a
_team-rules.in_review_overhead.title_patternsentry. Tag these in the by-status table with a(overhead)suffix and a footnote: "Excluded from velocity; counted toward capacity." - Wedge ticket detection — find the wedge ticket in the canvas (key matches
_team-rules.wedge.ticket_key); record its starting points. Used bysprint-sos-reportlater to detect scope creep. - Velocity-relevant points =
committed - in_review_overhead_points. This is the number the team is actually expected to deliver. - Carry-over capacity math — split
velocity_relevant_pointsintocarry_over_pointsandnew_commit_points = velocity_relevant_points - carry_over_points. The headline numbers in the report should make both visible: a sprint that committed 60 pts of which 25 are carry-over has very different planning implications than 60 pts of fresh work. Surface carry-over as a percentage of velocity-relevant commit (carry_over_points / velocity_relevant_points). - Carry-over WIP risk — count
carry_over.in_progress + carry_over.in_reviewtickets. If this is > 30% of total committed tickets, the sprint starts already-WIP-saturated; flag for the council.
Phase 5 — Clarity-council
Unless --no-council, invoke clarity-council via Skill with the personas list. Pass:
- The
Phase 3markdown view (both by-status and by-member, with carry-over annotations) - The
Phase 4derived numbers (effective capacity, velocity-relevant points, carry-over points + percentage, carry-over WIP risk) - The
Phase 2.5carry-over set (full list withJIRA:KEYand previous-end status) - The
_sprint.mdfrontmatter (capacity, last_sprint_velocity, avg_velocity_last_3) - Their assignment: "Produce three short markdown sections:
## Key Observations(3-7 bullets),## Risks(3-7 bullets, each with severity High/Med/Low and a one-sentence mitigation), and## Infographics(3-5 Mermaid charts that visualize the headline numbers). The statistics-expert weighs commitment vs velocity history and explicitly addresses carry-over: how much of the committed velocity is already-spoken-for, and what that implies for new-work throughput (with a prediction interval). The scrum-master weighs team load distribution, carry-over WIP risk (sprint starts WIP-saturated?), and re-planning signals. The product-owner weighs scope coherence, dependency surface, and whether carry-over items are still the right priorities or stale. The infographics-expert produces the chart block — see Required charts below. Strict rule: cite issue keys (JIRA:KEY format) for any specific claim — including every carry-over item the council references. No fluff."
Charts required (## Infographics section) {#charts-required-section}
The infographics-expert persona must produce at minimum these Mermaid charts, each with a one-line caption. See feedback memory: always-add-charts for the rationale (don't ship reports as numbers-only narratives when a chart would land it faster).
| # | Chart | Type | Series |
|---|---|---|---|
| 1 | Capacity vs commit | Mermaid xychart-beta (bar) | Capacity (line/reference), gross committed, velocity-relevant, last-sprint velocity, 3-sprint avg velocity |
| 2 | Carry-over share of velocity-relevant commit | Mermaid pie showData | carry-over points vs new-commit points |
| 3 | Per-member workload (% of capacity) | Mermaid xychart-beta (bar) | one bar per assigned member, sorted desc; flag any >25% with a marker note in the caption |
| 4 | Status mix at sprint start | Mermaid pie showData | Done / In Review / In Progress / To Do points |
| 5 | Velocity trend | Mermaid xychart-beta (line) | S1, S2, S3 (assumed/actual), S4 commit (point), with a horizontal reference at capacity |
Only skip a chart if the underlying data is genuinely empty (e.g. no carry-over → skip chart #2 with a note "no carry-over data"). Never skip silently. If the persona claims a chart can't be drawn, render the same data as a markdown table and label it "fallback (chart unavailable)."
If --no-council skips clarity-council entirely, the skill MUST still render the Infographics section directly via inline LLM rendering — the chart requirement is independent of the council orchestration.
If clarity-council is unavailable or --no-council, render a simpler ## Key Observations and ## Risks block from a direct LLM analysis using the same input — but flag in the console summary that the council was skipped.
Phase 6 — Render and write
Output path: {{output_root}}\reports\sprint-plan-{{YYYY-MM-DD}}.md (Pittsburgh local date). Create reports/ if missing.
Re-run semantics:
- Same-day re-run → overwrite today's
sprint-plan-YYYY-MM-DD.mdsilently. The newer run reflects the latest snapshot data; the user expects this to "refresh today's report." No prompt. - Different-day re-run → write a new dated file. Prior days' reports stay untouched on disk — they are the historical record of how the plan looked at that point in time.
- Symlink-style "latest" pointer → after writing, also update (overwrite)
{{output_root}}\reports\sprint-plan-latest.mdto be a single-line pointer file containing[[sprint-plan-{{YYYY-MM-DD}}]]. This gives the SM a stable wikilink target for dashboards and bases without chasing the date.
This per-day cadence pairs with sprint-snapshot's per-phase cadence: snapshot is what the board looked like at this phase, sprint-plan is how I interpreted the plan on this date — both are point-in-time records that shouldn't be silently overwritten across days. Within a day, however, the planning report just gets refreshed.
Template:
---
team: {{team}}
increment: {{inc}}
sprint: {{sprint}}
report_type: sprint-plan
generated: {{YYYY-MM-DD HH:mm}}
source_canvas: "[[start.canvas]]"
sprint_config: "[[_sprint]]"
team_rules: "[[../../_team-rules]]"
total_tickets: {{n}}
total_points: {{n}}
velocity_relevant_points: {{n}}
carry_over_points: {{n}}
new_commit_points: {{n}}
carry_over_pct: {{0.xx}}
capacity: {{n}}
prior_sprint_end_canvas: "[[../../Sprint {{prev_sprint}}/end.canvas]]"
council_personas: [{{persona list or "none"}}]
---
# Sprint {{sprint}} Plan — {{team}} (INC {{inc}})
> Captured from `start.canvas` at {{snapshot_at}}. Generated {{generated}}.
> Carry-over derived from `Sprint {{prev_sprint}}/end.canvas` ({{prev_end_snapshot_at_or_"unavailable"}}).
## Sprint at a glance
| Metric | Value |
| :--- | --: |
| Capacity | {{capacity}} pts |
| Committed | {{committed}} pts |
| Velocity-relevant (excl. in-review overhead) | {{velocity_relevant}} pts |
| ↳ Carry-over from Sprint {{prev_sprint}} | {{carry_over_points}} pts ({{carry_over_pct}}%) |
| ↳ New commit this sprint | {{new_commit_points}} pts |
| Last sprint velocity | {{last_velocity}} pts |
| 3-sprint avg velocity | {{avg_velocity}} pts |
| Tickets committed | {{n}} ({{carry_over_ticket_count}} carry-over 🔄) |
| Unassigned | {{n}} ({{n}} pts) |
{{capacity_warning_if_committed_>_avg_velocity_*_1.2}}
## Carry-over from Sprint {{prev_sprint}}
> All unclosed items from the previous sprint are assumed to carry into this one.
| | Key | Summary | Prev. status | Now | Owner | Pts |
| :-: | :--- | :--- | :--- | :--- | :--- | --: |
| 🔄 | JIRA:PROJ-1100 | … | IN REVIEW | IN REVIEW | [[@First Last]] | 2 |
| 🔄 | JIRA:PROJ-1107 | … | IN PROGRESS | TO DO (Assigned) | [[@First Last]] | 5 |
…
**Carry-over WIP risk:** {{carry_over_in_progress + carry_over_in_review}} of {{total_tickets}} tickets ({{xx%}}) start the sprint already-WIP. {{flag_if_>30%}}
**Stale-priority check:** the council has flagged carry-over items that may no longer be the right priority (see Risks).
{{Phase 3 by-status block}}
{{Phase 3 by-member block}}
## Wedge & Overhead
- Wedge ticket: `JIRA:{{wedge_key}}` ({{wedge_points}} pts reserved)
- Overhead members: {{list with effective vs nominal}}
- In-review overhead items (excluded from velocity): {{list}}
{{Phase 5 Infographics block — Mermaid charts per "Charts required" spec}}
{{Phase 5 Key Observations block}}
{{Phase 5 Risks block}}
## Next snapshots
This report covers the **start** snapshot. Recommended cadence:
- `/sprint-snapshot {{team}}` at end of each sprint week (auto-detects phase)
- `/sprint-sos-report {{team}}` at end of weeks 1, 2, 3
- `/sprint-review {{team}}` at sprint close
If extending the template with callouts, dataview blocks, or embeds, delegate to obsidian-markdown via Skill.
Phase 7 — Console summary
=== Aurora Sprint 2 (INC 28) — Sprint Plan ===
Source: Sprint 2/start.canvas (snapshot_at 2026-04-01T09:14:00-04:00)
Carry-over base: Sprint 1/end.canvas (snapshot_at 2026-03-31T17:42:00-04:00)
Tickets / Points: 24 / 62.5 (4 tickets / 11 pts carry-over 🔄)
Capacity: 80.8 (committed 62.5; velocity-relevant 47.5 after 15 pts in-review overhead)
Carry-over share: 11 / 47.5 = 23% of velocity-relevant commit
Carry-over WIP: 3 of 24 tickets start already-WIP (12%) — within tolerance
Council: statistics-expert + scrum-master + product-owner + infographics-expert ✅
Charts rendered: 5 Mermaid blocks (capacity-vs-commit, carry-over share, per-member workload, status mix, velocity trend)
Saved: [sprint-plan-2026-04-01.md](Scrum Teams/Aurora/Scrum 📅/INC 28/Sprint 2/reports/sprint-plan-2026-04-01.md)
[sprint-plan-latest.md] → updated pointer
If this is the second run today: Saved: refreshed sprint-plan-2026-04-01.md (silent overwrite — same-day re-run).
Rules
- Read-only. Read the canvas, the JSONL, the sprint config, and the team rules. Don't modify any of them. Don't call Jira directly — the canvas is the snapshot.
- Never fabricate ticket data. If a card's metadata is malformed, surface the parse failure in the console summary; don't invent values.
- Council citations are mandatory. Personas must reference
JIRA:KEYfor any claim about a specific ticket. Reject council output that fails this rule and re-prompt. - Carry-over assumption is unconditional. All unclosed items from the previous sprint's
end.canvas(or best-available fallback snapshot) are treated as carried into this sprint. The skill does not negotiate with the user about which items carried — that is already reflected instart.canvas. Surface, don't decide. - Same-day re-runs overwrite silently; cross-day runs create new dated files. This is the opposite of
sprint-snapshot's overwrite-prompt rule because the planning report is a daily refresh, not a phase-locked snapshot. Prior days' planning reports are historical record and never touched. - The
sprint-plan-latest.mdpointer is the canonical wikilink target for dashboards and bases. Always update it on every run. - Prefer the JSONL row over re-counting from the canvas for headline totals — it's the canonical record. Use canvas parsing only for the per-issue table.
- Wikilink team members only when the vault note exists. Same
Glob("{{vault_root}}/🤼 Team/**/@*.md")rule as sprint-snapshot. - Charts are mandatory. Every sprint-plan report MUST contain the
## Infographicssection with the Mermaid charts spec'd in Charts required. This applies whether the council ran or not. Numbers-only narratives are a regression — see the always-add-charts feedback memory. _team-rules.mdlookup search order: (1){{output_root}}/_team-rules.md(sprint-level override, rare), (2){{output_root}}/../_team-rules.md(INC-level, also rare), (3){{vault_root}}/Scrum Teams/<Team>/_team-rules.md(canonical team-root location, where Pyrite's lives). Do not declare team-rules missing without searching all three. See reference memory.
Edge cases
- No
start.canvas— prompt to runsprint-snapshot --phase startfirst; do not fall back toweek 1or invent a start state. - No previous sprint
end.canvas— fall back toweek 3.canvas, thenweek 2.canvas, thenweek 1.canvasfrom the previous sprint folder. If none exist, setcarry_over: unavailablein the frontmatter, render the report without a Carry-over section but with a> ⚠️ Carry-over could not be derived — previous sprint had no captured snapshots.callout near the top, and surface in the console summary. The council should be told carry-over data is unavailable so it doesn't hallucinate one. - First sprint of a new INC (Sprint 1) with no prior INC — same as "no previous sprint" — set
carry_over: not_applicableand skip the section entirely (no warning, this is expected). - Carry-over ticket present in previous-end but not in current-start — surface as a console warning: "⚠️ JIRA:PROJ-1100 was unclosed at end of Sprint 1 but is not in Sprint 2 start.canvas. Confirm with PO this was intentional (de-scoped, moved to backlog) and not a planning oversight." Don't fail; record in the report's "Stale-priority check" footnote.
- Carry-over ticket re-estimated between sprints — use the
start.canvas(current sprint) point value, not the previous-end value. Note the change in the carry-over table:prev: 3 pts → now: 5 pts. - Same-day re-run — third+ run — same as the second: silent overwrite of today's file. The
sprint-plan-latest.mdpointer doesn't need re-updating (it already points to today) but rewrite it anyway for idempotency. - Run on a day spanning a date boundary (after midnight) — Pittsburgh local date determines the filename. A run started 11:55 PM ET that finishes 12:05 AM ET writes to the date the run started — same convention
daily-briefinguses, prevents off-by-one filenames. _team-rules.mdmissing — only declare missing after exhausting all three lookup paths (sprint folder, INC folder, team rootScrum Teams/<Team>/). The team-root location is canonical for Pyrite; sprint/INC overrides are rare. If genuinely missing across all three, prompt to bootstrap (per sprint-snapshot/REFERENCE.md). Run anyway with empty overhead/wedge if the user picks "Skip"; flag in the console that the report is less accurate.- Wedge ticket key in
_team-rules.mddoesn't appear on the canvas — surface a warning ("Wedge ticket PROJ-9999 not in sprint — wedge accounting will be skipped this sprint"); continue. - Council unavailable /
--no-council— degrade to direct-LLM observations + risks; markcouncil_personas: [none]in the frontmatter so consumers can filter. - Sprint with 0 committed points — render the report; the observations section will (correctly) flag it.
- Multi-team run is not supported in v1 — single team only. (Multi-team would loop the workflow per team and write one report per team. Add later if needed.)
Related skills
| Skill | Use it for |
|---|---|
sprint-snapshot | Produces the start.canvas this skill consumes. Run first if it's missing. |
sprint-sos-report | Sibling — weekly comparison report. Reads the same _team-rules.md and snapshots. |
sprint-review | Sibling — end-of-sprint stakeholder report. Reuses the same scaffolding. |
clarity-council | Phase 5 delegates to it for the observations + risks analysis. statistics-expert is the load-bearing persona for capacity-vs-velocity reasoning; scrum-master for team-load and re-planning signals; product-owner for scope coherence. Add infographics-expert to the council when the report needs embedded visuals (carry-over Sankey, capacity-vs-commit bar, per-member workload small-multiple) — they consult statistics-expert for uncertainty rendering and produce the SVG/Mermaid that drops into the report body. |
obsidian-canvas | Use if extending the report with embedded canvas snippets or sub-canvases. |
obsidian-markdown | Use when extending the report template with callouts, dataview, embeds. |
obsidian-vault | Use for batch wikilink verification (>15 names). |
obsidian-bases | Use when the user wants a .base aggregating sprint plans across an INC (e.g. "show committed vs avg velocity for every Aurora sprint in INC 28"). |
What ships with it: 1 file
10.6 KB alongside SKILL.md
- README.md10.6 KB